Construction Work and Project Schedule. (a) The Initial Baseline Schedule will be the basis for monitoring the Developer’s performance of the Work until such time as a Baseline Schedule has been approved by the Department in accordance with the Technical Requirements. (b) The Developer and the Department will conduct monthly progress meetings in accordance with the Design-Build Contract. As part of, and in conjunction with, such meetings, the Developer will provide the Department with any proposed update of the Baseline Schedule in (c) Except as provided otherwise in this Agreement, the Developer will be financially responsible for all damage to the Project Assets resulting from the Work. The Department will not be responsible for any construction means and methods of the Developer or liability ensuing therefrom, unless such means and methods were directed by the Department pursuant to a Department Change or a Department Project Enhancement implemented by the Developer. (d) Whenever required by the Department, the Developer will provide in writing a general description of the arrangements and methods that the Developer proposes to adopt for the execution of the Work. The Developer will not significantly alter the Baseline Schedule, or such arrangements and methods, without informing the Department, and the Developer will coordinate any such alterations to take into account the Department’s resources and the work to be carried out by the Department’s separate contractors, if any. The Developer will not alter the Baseline Schedule except as permitted in the Technical Requirements. (e) If any alteration to the Baseline Schedule (i) affects the Critical Path,
Appears in 2 contracts