Contractor’s Specific Representations. By entering into this Contract, Contractor undertakes to furnish its best skill and judgment and to cooperate with Owner in furthering the best interests of Owner, the Work and the Project, and shall use good faith in performing its obligations under the Contract Documents. By entering into this Contract, Owner is relying upon the specific undertakings, representations and warranties of the Contractor in favor of Owner as follows, and Contractor hereby represents, warrants and covenants to Owner that: 7.1.1 Contractor and all Subcontractors are duly authorized and have the necessary license(s) to practice and perform all Work in this jurisdiction and will remain so licensed at all times relevant to the Work and Project. Contractor shall produce such license(s) to the Owner upon request, and Contractor shall be responsible to obtain copies of such license(s) from all Subcontractors prior to allowing them to perform Work on Site. Contractor has substantial experience in performing major projects with scopes of work similar to the Work defined herein, is familiar with the activities of the governmental bodies having authority over the Project and has expertise and experience managing Subcontractors on projects of similar scope within the Baton Rouge, Louisiana area. Contractor also represents that such experience includes performing major projects with stringent time constraints and where construction begins before all drawings and specifications have been issued for construction purposes, as is the case with the Work and Project. The standard by which Contractor shall be judged in its performance of this Agreement and its exercise of judgment hereunder shall be that of a contractor with the highest level of skill, experience and expertise for the planning and construction of a first class luxury resort and casino in Baton Rouge, Louisiana including the foregoing qualifications and consistent with such other Contractor representations, warranties and covenants contained in the Contract Documents. 7.1.2 All of Contractor’s management and Site supervisory personnel listed in Exhibit C attached to this Agreement shall remain until Substantial Completion committed to and available for full-time assignments devoted to the Work unless otherwise specifically noted in Exhibit C attached to this Agreement or as agreed upon by Owner (subject to Contractor’s right to terminate the employment of personnel for cause in the ordinary course of business). 7.1.3 Contractor has examined and will continue to examine all Contract Documents provided by Owner and the Architect pertaining to the Work and the Site. Contractor fully accepts the lack of completeness of such documents, including the Drawings and Specifications, except to the extent otherwise reasonably and promptly noted in writing to Owner in accordance with Section 7.3 hereof as to any specific concerns about incompleteness and consistent with Contractor’s obligations and representations in this Agreement so long as any such Drawings and Specifications delivered after the Effective Date are (a) delivered timely in accordance with the Project Schedule and (b) in substantial conformance with the Guaranteed Maximum Price Premises and Assumptions. Contractor also represents that the Guaranteed Maximum Price Premises and Assumptions were sufficiently detailed and comprehensive to enable Contractor to have reliably estimated and established its Guaranteed Maximum Price set forth in Article 3 of this Agreement. Subject to the provisions of this Agreement, Contractor further agrees that all Work shall be performed within the Guaranteed Maximum Price and within the Contract Time set forth in Article 4 of this Agreement, notwithstanding that the Contract Documents, including the Drawings and Specifications, are not complete in every detail and are still being developed. 7.1.4 Contractor has had ample time to and has visited and examined the Site and has reviewed the physical conditions affecting the Work, and will continue to do all of the foregoing, and, subject to the provisions of Article 13 hereof, is familiar with all of the conditions on, under, and affecting the Site, as Contractor deemed necessary or desirable based on Contractor’s skill, experience and knowledge and the scope of the Work and terms of the Contract Documents. Contractor has verified field conditions, and carefully and fully compared such field conditions, Site observations and other information known to Contractor with the Contract Documents (including the requirements thereof) and has not found any omissions, errors or discrepancies and has satisfied and will continue to satisfy itself as to: (a) access thereto; (b) the location of all utility pipelines and wiring conduits which can be ascertained through Site visits or by any documents which are provided by Owner; (c) the type of equipment and facilities needed before and during prosecution of the Work; (d) the general and local labor and weather conditions and availability of materials and equipment under which the Work is to be performed; (e) the presence of construction hazards, if any; (f) the nature, location, and character of the Work and the Site, including, without limitation, all improvements and obstructions on and under the Site both natural and man-made; and (g) all other matters which may affect the Contractor’s means, methods, techniques and procedures necessary to construct the Work in strict accordance with the Contract Documents and otherwise fulfill its obligations under the Contract Documents, including but not limited to its obligation to complete the Work for an amount not in excess of the Guaranteed Maximum Price on or before the Contract Time. Any condition at the Site, whether or not consistent with conditions shown or called for on the Contract Documents, shall not be allowed as a basis for claims for extra compensation or extensions of time, except as otherwise specifically provided for in Article 13 below, notwithstanding any statements or representations by Owner or any party on behalf of Owner, oral or written, with respect to the conditions of the Site or improvements thereon, or regarding the completeness, correctness, or adequacy of any Contract Documents, except to the extent provided in Section 7.1.3 hereof 7.1.5 Prior to commencing its procurement and construction activities, Contractor shall further verify at the Site all measurements and levels necessary for proper construction of the Work, including the fabrication, assembly and installation of materials and equipment to be incorporated into the Work and shall further carefully compare such verified field measurements and conditions with the requirements of the Contract Documents. 7.1.6 If the Contractor observes any failure of the Contract Documents to conform with applicable Laws (as defined in Section 7.2 of this Agreement), Contractor shall immediately notify Owner in writing and identify any such discrepancies and obtain written instructions from Owner before proceeding with any part of the Work affected thereby. If the Contractor performs Work that it knows or reasonably should have known to be contrary to Laws, the Contractor shall assume full responsibility for such Work and shall bear all costs (including loss and damage due to delays) of correction, repair and replacement attributable thereto as Non-Allowable Costs of the Work. 7.1.7 If Contractor discovers or otherwise becomes aware of any errors, discrepancies, omissions, duplications or conflicts in the Contract Documents at any time during the course of the Work, Contractor shall immediately notify Owner in writing and obtain written instructions from Owner before proceeding with any part of the Work affected thereby. If the Contractor performs any Work relating to any such errors, discrepancies, omissions, duplications in the Contract Documents, Contractor shall bear all costs of correction and adverse scheduling impacts attributable thereto as Non-Allowable Costs of the Work. 7.1.8 Contractor will not engage in, nor commit its personnel to engage in, any other projects while performing Work on the Project to any extent that such other projects may materially and adversely affect the quality or efficiency of the Work required to be performed by Contractor in connection with this Project or which will otherwise be detrimental to the carrying on and completion of this Project.
Appears in 1 contract
Sources: Guaranteed Maximum Price Construction Services Agreement (Pinnacle Entertainment Inc)
Contractor’s Specific Representations. By entering into this Contract, Contractor undertakes to furnish its best skill and judgment and to cooperate with Owner in furthering the best interests of Owner, the Work and the Project, and shall use good faith in performing its obligations under the Contract Documents. By entering into this Contract, Owner is relying upon the specific undertakings, representations and warranties of the Contractor in favor of Owner as follows, and Contractor hereby represents, warrants and covenants to Owner that:
7.1.1 Contractor and all Subcontractors are duly authorized and have the necessary license(s) to practice and perform all Work in this jurisdiction and will remain so licensed at all times relevant to the Work and Project. Contractor shall produce such license(s) to the Owner upon request, and Contractor shall be responsible to obtain copies of such license(s) from all Subcontractors prior to allowing them to perform Work on Site. Contractor has substantial experience in performing major projects with scopes of work similar to the Work defined herein, is familiar with the activities of the governmental bodies having authority over the Project and has expertise and experience managing Subcontractors on projects of similar scope within the Baton RougeSt. Louis, Louisiana Missouri area. Contractor also represents that such experience includes performing major projects with stringent time constraints and where construction begins before all drawings and specifications have been issued for construction purposes, as is the case with the Work and Project. The standard by which Contractor shall be judged in its performance of this Agreement and its exercise of judgment hereunder shall be that of a contractor with the highest level of skill, experience and expertise for the planning and construction of a first class luxury resort and casino in Baton RougeSt. Louis, Louisiana Missouri including the foregoing qualifications and consistent with such other Contractor representations, warranties and covenants contained in the Contract Documents.
7.1.2 All of Contractor’s management and Site supervisory personnel listed in Exhibit C attached to this Agreement shall remain until Substantial Completion committed to and available for full-time assignments devoted to the Work unless otherwise specifically noted in Exhibit C attached to this Agreement or as agreed upon by Owner (subject to Contractor’s right to terminate the employment of personnel for cause in the ordinary course of business).
7.1.3 Contractor has examined and will continue to examine all Contract Documents provided by Owner and the Architect pertaining to the Work and the Site. Contractor fully accepts the lack of completeness of such documents, including the Drawings and Specifications, except to the extent otherwise reasonably and promptly noted in writing to Owner in accordance with Section 7.3 hereof as to any specific concerns about incompleteness and consistent with Contractor’s obligations and representations in this Agreement so long as any such Drawings and Specifications delivered after the Effective Date are (a) delivered timely in accordance with the Project Schedule and (b) in substantial conformance with the Guaranteed Maximum Price Premises and Assumptions. Contractor also represents that the Guaranteed Maximum Price Premises and Assumptions were sufficiently detailed and comprehensive to enable Contractor to have reliably estimated and established its Guaranteed Maximum Price set forth in Article 3 of this Agreement. Subject to the provisions of this Agreement, Contractor further agrees that all Work shall be performed within the Guaranteed Maximum Price and within the Contract Time set forth in Article 4 of this Agreement, notwithstanding that the Contract Documents, including the Drawings and Specifications, are not complete in every detail and are still being developed.
7.1.4 Contractor has had ample time to and has visited and examined the Site and has reviewed the physical conditions affecting the Work, and will continue to do all of the foregoing, and, subject to the provisions of Article 13 hereof, is familiar with all of the conditions on, under, and affecting the Site, as Contractor deemed necessary or desirable based on Contractor’s skill, experience and knowledge and the scope of the Work and terms of the Contract Documents. Contractor has verified field conditions, and carefully and fully compared such field conditions, Site observations and other information known to Contractor with the Contract Documents (including the requirements thereof) and has not found any omissions, errors or discrepancies and has satisfied and will continue to satisfy itself as to: (a) access thereto; (b) the location of all utility pipelines and wiring conduits which can be ascertained through Site visits or by any documents which are provided by Owner; (c) the type of equipment and facilities needed before and during prosecution of the Work; (d) the general and local labor and weather conditions and availability of materials and equipment under which the Work is to be performed; (e) the presence of construction hazards, if any; (f) the nature, location, and character of the Work and the Site, including, without limitation, all improvements and obstructions on and under the Site both natural and man-made; and (g) all other matters which may affect the Contractor’s means, methods, techniques and procedures necessary to construct the Work in strict accordance with the Contract Documents and otherwise fulfill its obligations under the Contract Documents, including but not limited to its obligation to complete the Work for an amount not in excess of the Guaranteed Maximum Price on or before the Contract Time. Any condition at the Site, whether or not consistent with conditions shown or called for on the Contract Documents, shall not be allowed as a basis for claims for extra compensation or extensions of time, except as otherwise specifically provided for in Article 13 below, notwithstanding any statements or representations by Owner or any party on behalf of Owner, oral or written, with respect to the conditions of the Site or improvements thereon, or regarding the completeness, correctness, or adequacy of any Contract Documents, except to the extent provided in Section 7.1.3 hereof.
7.1.5 Prior to commencing its procurement and construction activities, Contractor shall further verify at the Site all measurements and levels necessary for proper construction of the Work, including the fabrication, assembly and installation of materials and equipment to be incorporated into the Work and shall further carefully compare such verified field measurements and conditions with the requirements of the Contract Documents.
7.1.6 If The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws, consents, ordinances, mitigation measures, codes, rules, directives, orders, permits, statutes, and regulations, whether federal, State or local, and whether governmental or public administrative (collectively, “Laws”); however, if the Contractor observes any failure of the Contract Documents to conform with applicable Laws (as defined in Section 7.2 of this Agreement), Contractor shall immediately notify Owner in writing and identify any such discrepancies and obtain written instructions from Owner before proceeding with any part of the Work affected thereby. If the Contractor performs Work that it knows or reasonably should have known to be contrary to Laws, the Contractor shall assume full responsibility for such Work and shall bear all the costs (including loss and damage due to delays) of correction, repair and replacement attributable thereto as Non-Allowable Costs of the Work.
7.1.7 If Contractor discovers or otherwise becomes aware of any errors, discrepancies, omissions, duplications or conflicts in the Contract Documents at any time during the course of the Work, Contractor shall immediately notify Owner in writing and obtain written instructions from Owner before proceeding with any part of the Work affected thereby. If the Contractor performs any Work relating to any such errors, discrepancies, omissions, duplications in the Contract Documents, Contractor shall bear all costs of correction and adverse scheduling impacts attributable thereto as Non-Allowable Costs of the Work.
7.1.8 Contractor will not engage in, nor commit its personnel to engage in, any other projects while performing Work on the Project to any extent that such other projects may materially and adversely affect the quality or efficiency of the Work required to be performed by Contractor in connection with this Project or which will otherwise be detrimental to the carrying on and completion of this Project.
Appears in 1 contract
Sources: Guaranteed Maximum Price Construction Services Agreement (Pinnacle Entertainment Inc)
Contractor’s Specific Representations. By entering into this Contract, Contractor undertakes to furnish its best skill and judgment and to cooperate with Owner in furthering the best interests of Owner, the Work and the Project, and shall use good faith in performing its obligations under the Contract Documents. By entering into this Contract, Owner is relying upon the specific undertakings, representations and warranties of the Contractor in favor of Owner as follows, and Contractor hereby represents, warrants and covenants to Owner that:
7.1.1 Contractor and all Subcontractors are duly authorized and have the necessary license(s) to practice and perform all Work in this jurisdiction and will remain so licensed at all times relevant to the Work and Project. Contractor shall produce such license(s) to the Owner upon request, and Contractor shall be responsible to obtain copies of such license(s) from all Subcontractors prior to allowing them to perform Work on Site. Contractor has substantial experience in performing major projects with scopes of work similar to the Work defined herein, is familiar with the activities of the governmental bodies having authority over the Project and has expertise and experience managing Subcontractors on projects of similar scope within the Baton RougeLas Vegas, Louisiana Nevada area. Contractor also represents that such experience includes performing major projects with stringent time constraints and where construction begins before all drawings and specifications have been issued for construction purposes, as is the case with the Work and Project. The standard by which Contractor shall be judged in its performance of this Agreement and its exercise of judgment judgement hereunder shall be that of a contractor with the highest level of skill, experience and expertise for the planning and construction of a first class luxury resort and casino on the strip in Baton RougeLas Vegas, Louisiana Nevada, including the foregoing qualifications and consistent with such other Contractor representations, warranties and covenants contained in the Contract Documents.
7.1.2 All of Contractor’s 's management and Site supervisory personnel listed in Exhibit C attached to this Agreement shall remain until Substantial Completion committed to and available for full-time assignments devoted to the Work unless otherwise specifically noted in Exhibit C attached to this Agreement or as agreed upon by Owner (subject to Contractor’s 's right to terminate the employment of personnel for cause in the ordinary course of business).
7.1.3 Contractor has examined and will continue to examine all Contract Documents provided by Owner and the Architect pertaining to the Work and the Site. Contractor fully accepts the lack of completeness of such documents, including the Drawings and Specifications, except to the extent otherwise reasonably and promptly noted in writing to Owner in accordance with Section 7.3 hereof as to any specific concerns about incompleteness and consistent with Contractor’s 's obligations and representations in this Agreement so long as any such Drawings and Specifications delivered after the Effective Date are (a) delivered timely in accordance with the Project Schedule and (b) in substantial conformance with the Guaranteed Maximum Price Premises and Assumptions. Contractor also represents that the Guaranteed Maximum Price Premises and Assumptions were sufficiently detailed and comprehensive to enable Contractor to have reliably estimated and established its Guaranteed Maximum Price set forth in Article 3 of this Agreement. Subject to the provisions of this Agreement, Contractor further agrees that all Work shall be performed within the Guaranteed Maximum Price and within the Contract Time set forth in Article 4 of this Agreement, notwithstanding that the Contract Documents, including the Drawings and Specifications, are not complete in every detail and are still being developed.
7.1.4 Contractor has had ample time to and has visited and examined the Site and has reviewed the physical conditions affecting the Work, and will continue to do all of the foregoing, and, subject to the provisions of Article 13 hereof, is familiar with all of the conditions on, under, and affecting the Site, as Contractor deemed necessary or desirable based on Contractor’s 's skill, experience and knowledge and the scope of the Work and terms of the Contract Documents. Contractor has verified field conditions, and carefully and fully compared such field conditions, Site observations and other information known to Contractor with the Contract Documents (including the requirements thereof) and has not found any omissions, errors or discrepancies and has satisfied and will continue to satisfy itself as to: (a) access thereto; (b) the location of all utility pipelines and wiring conduits which can be ascertained through Site visits or by any documents which are provided by Owner; (c) the type of equipment and facilities needed before and during prosecution of the Work; (d) the general and local labor and weather conditions and availability of materials and equipment under which the Work is to be performed; (e) the presence of construction hazards, if any; (f) the nature, location, and character of the Work and the Site, including, without limitation, all improvements and obstructions on and under the Site both natural and man-made; and (g) all other matters which may affect the Contractor’s 's means, methods, techniques and procedures necessary to construct the Work in strict accordance with the Contract Documents and otherwise fulfill its obligations under the Contract Documents, including but not limited to its obligation to complete the Work for an amount not in excess of the Guaranteed Maximum Price on or before the Contract Time. Any condition at the Site, whether or not consistent with conditions shown or called for on the Contract Documents, shall not be allowed as a basis for claims for extra compensation or extensions of time, except as otherwise specifically provided for in Article 13 below, notwithstanding any statements or representations by Owner or any party on behalf of Owner, oral or written, with respect to the conditions of the Site or improvements thereon, or regarding the completeness, correctness, or adequacy of any Contract Documents, except to the extent provided in Section 7.1.3 hereof
7.1.5 Prior to commencing its procurement and construction activities, Contractor shall further verify at the Site all measurements and levels necessary for proper construction of the Work, including the fabrication, assembly and installation of materials and equipment to be incorporated into the Work and shall further carefully compare such verified field measurements and conditions with the requirements of the Contract Documents.
7.1.6 If the Contractor observes any failure of the Contract Documents to conform with applicable Laws (as defined in Section 7.2 of this Agreement), Contractor shall immediately notify Owner in writing and identify any such discrepancies and obtain written instructions from Owner before proceeding with any part of the Work affected thereby. If the Contractor performs Work that it knows or reasonably should have known to be contrary to Laws, the Contractor shall assume full responsibility for such Work and shall bear all costs (including loss and damage due to delays) of correction, repair and replacement attributable thereto as Non-Allowable Costs of the Work.
7.1.7 If Contractor discovers or otherwise becomes aware of any errors, discrepancies, omissions, duplications or conflicts in the Contract Documents at any time during the course of the Work, Contractor shall immediately notify Owner in writing and obtain written instructions from Owner before proceeding with any part of the Work affected thereby. If the Contractor performs any Work relating to any such errors, discrepancies, omissions, duplications in the Contract Documents, Contractor shall bear all costs of correction and adverse scheduling impacts attributable thereto as Non-Allowable Costs of the Work.
7.1.8 Contractor will not engage in, nor commit its personnel to engage in, any other projects while performing Work on the Project to any extent that such other projects may materially and adversely affect the quality or efficiency of the Work required to be performed by Contractor in connection with this Project or which will otherwise be detrimental to the carrying on and completion of this Project.
Appears in 1 contract
Sources: Guaranteed Maximum Price Construction Services Agreement (Wynn Resorts LTD)