Control of Surface Water Run-Off Clause Samples

Control of Surface Water Run-Off. The owner of each site shall be responsible for the retention, control, storage and disposal of surface water run-off. The owner of each site shall be responsible for the construction of any facilities needed to control storm water run- off, and for the costs of any governmental permit(s) relating thereto.
Control of Surface Water Run-Off. .1 All exposed areas resulting from construction activities will require erosion control devices. Extra erosion and sediment control materials shall be on site during the construction period should a precipitation or snowmelt event occur at a vulnerable time. .2 If runoff or sediment laden water from the area disturbed by the construction exists, it should be diverted to a settling pond, sediment trap, or through a vegetated area to minimize erosion and sedimentation of the waterbody and/or storm drain inlets. All flow diversion will be conducted such that it does not adversely affect the land and in a manner such that it will not disturb sediments in the waterbody. .3 Stabilize all disturbed areas, including exposed soils and slopes, by: .1 Immediately installing temporary erosion control measures to remain in place until vegetation or other long-term erosion control methods are fully established and functioning. .2 Installing and placing long-term erosion control measures including, but not limited to, slope stabilization and re-vegetation. .4 The Contractor is required to have a Flood Emergency Response Plan as part of their ECO Plan. All supervisors must have access to this plan throughout the duration of the project.

Related to Control of Surface Water Run-Off

  • RIGHT OF ALLOTTEE TO USE COMMON AREAS AND FACILITIES SUBJECT TO PAYMENT OF TOTAL MAINTENANCE CHARGES The Allottee hereby agrees to purchase the [Apartment/Plot] on the specific understanding that is/her right to the use of Common Areas shall be subject to timely payment of total maintenance charges, as determined and thereafter billed by the maintenance agency appointed or the association of allottees (or the maintenance agency appointed by it) and performance by the Allottee of all his/her obligations in respect of the terms and conditions specified by the maintenance agency or the association of allottees from time to time.

  • Procurement Project not financed with EU Funds The procurement is covered by the Government Procurement Agreement (GPA): yes

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Access to Property, Property’s Management, Property Lender, and Property Tenants Potential Investor agrees to not seek to gain access to any non-public areas of the Property or communicate with Property’s management employees, the holder of any financing encumbering the Property, the Property’s tenants, and the Owner’s partners in the ownership of the Property, without the prior consent of Owner or JLL, which consent may be withheld in the Owner’s sole discretion.

  • RIGHT OF ALLOTTEE TO USE COMMON AREAS AND FACILITIES SUBJECT TO PAYMENT OF TOTAL MAINTENANCE CHARGES