COOLING AND VENTILATION SYSTEMS Sample Clauses

COOLING AND VENTILATION SYSTEMS. OFFICE AREA The office heating, ventilation, and air conditioning system will consist of electric packaged roof top units providing one (1) ton per 400sf. Sheetmetal ductwork with 24“x24” diffusers will provide the supply air while air return grilles and the ceiling plenum will be the return air system. The system will be designed to maintain 75 degrees Fahrenheit on a 105 degree Fahrenheit outdoor day during summer operation and maintain 70 degrees Fahrenheit on a 32 degree Fahrenheit outdoor day during winter operation. WAREHOUSE COOLING & VENTILATION The Warehouse Cooling and Ventilation Systems will consist of Roof Mounted 2- Stage Evaporative Cooling Units with Roof Mounted Exhaust Fans to maintain 90 degree Fahrenheit at 32 feet above floor, on a day with 95 degree Fahrenheit outdoor temperature. Ventilation of Warehouse will meet code required air exchanges per S Occupancy. The pricing for Cooling and Ventilation does not include any heating of the Warehouse space. HAZARDOUS MATERIAL ROOM COOLING & VENTILATION The Hazardous Material Storage Room will have an independent 2-stage Evaporative Cooling System with Ventilation to maintain code required air exchanges for an H Occupancy. The pricing for Cooling and Ventilation does not include any heating of the Hazardous Material Storage Room space. OFFICE LIGHTING Office lighting is shall consist of 24“x48” three lamp, electronic ballast, lay-in fluorescent fixtures with 18 deep cell parabolic lens. This lighting will be placed at a rate of one fixture (1) per 60sf.
COOLING AND VENTILATION SYSTEMS. Hot Water Piping Cold Water Make-Up Piping Hot Water Recirculating Piping Low Pressure Steam Piping Medium Pressure Steam Piping High Pressure Steam Piping Condensate Return Piping Chilled Water Piping Combination Hot and Chilled Water Piping Chillers and Absorption Machine Breechings Stacks Grease Ducts Exhaust Ducts Boilers Expansion Tanks Pumps Fresh Air Intake Housings (Internal and External) Cold Water Pumps Meter Hot Water Storage Tanks Sleeve Packing Air Conditioning Plenums and Casings (Internal and External) Roof Top Units Cooling Supply Duct Work Heating Supply Duct Work Combination Supply Duct Work Ventilating Supply Duct Work Cooling Return Duct Work Heating Return Duct Work Combination Return Duct Work Ventilating Return Duct Work Flexible Duct Work Tower Water Sleeve Packing Traced Piping Refrigeration Piping Ice tanks, Icehouses, and associated piping Accumulators Brine Systems Boiler Blow-Off Piping Fossil Fuel Boilers Heat Exchangers Nuclear Reactors Pumps Nuclear Containment Vessels Spherical Tanks Precipitators Convertors Stacks Breechings Storage Tanks Heaters Steam Piping Steam Pumps and Equipment Process Piping Process Pumps and Equipment Traced Piping Traced Pumps and Equipment Radiation Shielding Radiation and Fire Stops Turbines Emergency Generators
COOLING AND VENTILATION SYSTEMS. Primary Heating Unit and Primary Cooling Unit

Related to COOLING AND VENTILATION SYSTEMS

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit E during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep all of the operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System.

  • Ventilation Where noxious or poisonous gases may accumulate, the City shall provide proper protection and ventilation. Proper lighting and ventilation shall be provided for all enclosed working spaces. All work in enclosed and confined spaces shall be performed in accordance with applicable Federal, State and local regulations. Spray painting shall be done only by qualified painters.

  • Heating and Air Conditioning ▇▇▇▇▇▇ agrees to furnish to Lessee heating and air conditioning equipment and maintain same in satisfactory operating condition at all times for the Premises during the term of the Lease at the expense of Lessor. ▇▇▇▇▇▇ agrees that thermostats in the Premises will be set to maintain an average zone temperature of 75 degrees Fahrenheit during the heating and cooling seasons.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.