Coordination of Work With Assigned Subcontractors. Contractor shall provide electrical power to the DDC controls as soon as possible to allow timely completion of that work. If necessary, provide separate circuits for the purpose. When lights are installed and circuits activated, the lights must be connected to the DDC Control System. The cost of lights left on after Normal Hours will be assessed against the Contractor and deducted from the contract sum.