Coordination with Utility. Owner shall cause the Utility to (a) provide specifications for utility metering and telemetering equipment to be installed by Contractor, (b) subject to Contractor’s obligation to pay for power consumption as provided in this Agreement, make back-feed power available, if required, to the Facility, and (c) permit Interconnection of the Facility at the point of Interconnection specified in the Interconnection Agreement and accept electricity generated by the Facility, as needed, for commissioning and performance of the Performance Tests, in each case in accordance with the Project Schedule; provided that, Contractor shall properly design, commission and test the Interconnection facilities such that the Utility agrees to allow Interconnection.
Appears in 2 contracts
Sources: Engineering, Procurement and Construction Agreement, Engineering, Procurement and Construction Agreement (VivoPower International PLC)
Coordination with Utility. Owner Contractor shall cause the Utility to (a) provide specifications for utility metering and telemetering equipment to be installed by ContractorSubcontractor, (b) subject to ContractorSubcontractor’s obligation to pay for power consumption as provided in this Agreement, make back-feed power available, if required, to the Facility, and (c) permit Interconnection interconnection of the Facility at the point of Interconnection interconnection specified in the Interconnection Agreement and accept electricity generated by the Facility, as needed, for commissioning and performance of the Performance Testscommissioning, in each case in accordance with the Project Schedule; provided that, Contractor Subcontractor shall properly design, commission and test the Interconnection interconnection facilities within the Scope of Work such that the Utility agrees to allow Interconnectioninterconnection.
Appears in 1 contract
Sources: Engineering, Procurement and Construction Agreement