Core Drilling Clause Samples

POPULAR SAMPLE Copied 2 times
Core Drilling. 24.1 Prior to Talisman commencing any concrete core-drilling work on behalf of the Customer, the Customer must advise Talisman of, point out and clearly ▇▇▇▇ the precise location of any and all services and / or internal structural support system/s embedded below the core-drilling surface (“embedded services and / or structural reinforcement”). 24.2 The embedded services which the Customer has a duty to identify, point out and ▇▇▇▇ include, but are not limited to, electrical services, gas services, fuel services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigation pipes, plumbing services, telephone cables, fibre optic cables, oil pumping mains, and any other embedded services and structural reinforcement that could be damaged by core drilling on the site. 24.3 While Talisman undertakes to take the necessary precautions to avoid drilling damage to any and all embedded services and / or structural reinforcement the Customer agrees to indemnify Talisman in respect of any and all loss, damage, costs and/or fines of any nature, which may be sustained, by the Customer in consequence of Talisman, whether directly or indirectly, causing damage to the said embedded services and / or structural reinforcement due to the Customer not identifying, not having pointed out and / or incorrectly pointed out and not clearly marking the precise location of the said embedded services and structural re-enforcement as per clause 24.1.
Core Drilling. Each respective Prime Contractor shall provide their own core drilling through existing and new wall, floor, foundation, or slab systems.
Core Drilling. Effective as of the date that a fully executed counterpart of this Agreement is delivered by Landlord to Tenant, the following shall be added to the Lease as Article 8.04:
Core Drilling. 31.1 Before We will commence any concrete core-drilling on behalf of You,You should advise Us of, point out and clearly m ark the exact location of any and all services and/or internal structural support system(s) located under the core drill site ("embed ded services and/or structural reinforcement").
Core Drilling. Contractor must x-ray or use ground penetrating radar (“GPR”) to locate rebar, post tensioned cables, conduits and other embedded items prior to core drilling slabs. Survey floor and pilot drill to locate all embedded items, rebar, conduits and post tensioned cables prior to core drilling slabs. Items damaged as a result of core drilling shall be repaired as specified in paragraph 9.5, structural building components at no additional cost to the Project.
Core Drilling. Core Drilling of concrete floor slabs or core walls is not allowed during regular business hours. All core drilling requires an X-ray verification that no structural or electrical systems will be cut or damaged by the proposed core drilling. Coordinate the after-hours times acceptable for this work with Construction Services.

Related to Core Drilling

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Fabrication Making up data or results and recording or reporting them.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.