Correction of Analysis Mismeasurements Sample Clauses

Correction of Analysis Mismeasurements. All Mismeasurements introduced as a consequence of an error in the analysis of Pipeline Liquids will be corrected by determining the variation of entitlement caused by the application of corrected analysis in the Allocation Period(s) in which the error occurred.

Related to Correction of Analysis Mismeasurements

  • Quantitative Analysis Quantitative analysts develop and apply financial models designed to enable equity portfolio managers and fundamental analysts to screen potential and current investments, assess relative risk and enhance performance relative to benchmarks and peers. To the extent that such services are to be provided with respect to any Account which is a registered investment company, Categories 3, 4 and 5 above shall be treated as “investment advisory services” for purposes of Section 5(b) of the Agreement.”

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will ▇▇▇▇ ▇▇▇▇▇▇▇ Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Risk Analysis The Custodian will provide the Fund with a Risk Analysis with respect to Securities Depositories operating in the countries listed in Appendix B. If the Custodian is unable to provide a Risk Analysis with respect to a particular Securities Depository, it will notify the Fund. If a new Securities Depository commences operation in one of the Appendix B countries, the Custodian will provide the Fund with a Risk Analysis in a reasonably practicable time after such Securities Depository becomes operational. If a new country is added to Appendix B, the Custodian will provide the Fund with a Risk Analysis with respect to each Securities Depository in that country within a reasonably practicable time after the addition of the country to Appendix B.

  • Certificate of Analysis Seller shall provide a certificate of analysis and other documents as defined in the Quality Agreement for any Product to be released hereunder, in a form in accordance with the cGMPs and all other applicable Regulatory Requirements and Product Specifications and as shall be agreed upon by the parties. For any batch that initially failed to meet any Product Specification, the certificate of analysis shall document the exception. Products that do not meet dissolution specifications at USP Stage I and II testing shall not be accepted by Buyer (and such requirement shall be included in the Product Specifications/Quality Manual).

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.