Corrections of Measuring Equipment Clause Samples

The Corrections of Measuring Equipment clause establishes the procedures and responsibilities for identifying, reporting, and rectifying inaccuracies in measurement devices used under the contract. Typically, this clause requires parties to regularly inspect and calibrate equipment, and to promptly address any discovered errors, which may involve adjusting past measurements or compensating affected parties. Its core function is to ensure the accuracy and reliability of measurements, thereby preventing disputes and ensuring fair outcomes based on precise data.
Corrections of Measuring Equipment. If, upon testing, any measuring equipment is found to be inaccurate by less than two percent (2%) at a flow rate corresponding to the average hourly flow rate for Steam supplied by Cogen for Infineum's Complex and Infineum's Technology Center for the period since the last preceding test, previous recordings of such equipment shall be considered accurate in computing deliveries of Steam hereunder, but such equipment shall be promptly adjusted to record correctly to the extent possible. If, upon testing, any measuring equipment shall be found to be inaccurate by greater than two percent (2%) at a flow rate corresponding to the average hourly flow rate for Steam supplied by Cogen for Infineum's Complex or Infineum's Technology Center for the period since the last preceding test, then such equipment shall be promptly adjusted to record properly, to the extent possible, and any previous recordings by such equipment shall be corrected to zero error, to the extent possible, and Cogen shall promptly send to Infineum, pursuant to Article 7, billing adjustments based on such corrected recordings. If no reliable information exists as to when the equipment became inaccurate, it shall be assumed for correction purposes hereunder that such inaccuracy began at a point in time midway between the testing date and the last previous date on which the equipment was tested and found to be accurate or adjusted to be accurate.
Corrections of Measuring Equipment. If, upon testing, any measuring equipment is found to be inaccurate by less than two percent (2%), previous recordings of such equipment shall be considered accurate in computing deliveries of Cogenerated Steam hereunder, but such equipment shall be promptly adjusted to record correctly to the extent possible. If, upon testing, any measuring equipment shall be found to be inaccurate by greater than two percent (2%), then such equipment shall be promptly adjusted to record properly, to the extent possible, and any previous recordings by such equipment shall be corrected to zero error, to the extent possible, and Seller shall promptly send to Buyer, pursuant to Section 6, billing adjustments based on such corrected recordings. If no reliable information exists as to when the equipment became inaccurate, it shall be assumed for correction purposes hereunder that such inaccuracy began at a point in time midway between the testing date and the last previous date on which the equipment was tested and found to be accurate or adjusted to be accurate.

Related to Corrections of Measuring Equipment

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller. 2. ▇▇▇▇▇ agrees to furnish to Seller for operating Seller's meters, at not cost to Seller. 3. ▇▇▇▇▇ agrees to change the charts on meters at no cost to Seller and forward same to Seller. 4. Buyer hereby grants to Seller suitable rights-of-way and easements necessary or incidental for the installation, maintenance, operation and removal of pipeline and other facilities together with rights of ingress thereto and egress there from at all times and hereby agrees to deliver to Seller, for the sum of one dollar ($1 .00), an appropriate instrument or grant defining such rights and easements located on Buyer's plant site. 5. Buyer may install, maintain and operate such check measuring equipment, including a recording gravitometer and calorimeter as it shall desire, provided that such equipment shall be so installed so as not to interfere with the operation of Seller's measuring equipment at or near the point of deliver. However, all ▇▇▇▇▇▇▇▇ to the Buyer shall be based on the metering of the Seller, subject only to the provisions of Paragraph 8 of this Article. 6. Each party shall have the right to be present at the time of any installing, reading, cleaning, changing, repairing, inspecting, testing, calibrating, or adjusting done in connection with the other's measuring equipment used in measuring deliveries hereunder and each party shall advise the other of any intended major maintenance operation sufficiently in advance in order that the other party may conveniently have its representative present. 7. All installation of measuring equipment, applying to or effecting deliveries hereunder, shall be made in such manner as to permit an accurate determination of the quantity of gas delivered and ready verification of the accuracy of measurement. Orifice meter installations, if used, shall conform to the recommendation for design and installation contained in the Gas Measurement Committee Report No. 3 to the American Gas Association published April, 1955, and any modifications and amendments thereof and shall include the use of flange connections. 8. Measurement on meter or meters shall be conclusive of both parties except where the meter is defective or fails to register, or if found in error, in either of which case Seller shall (a) By using the registration of any check meter if installed and accurately registering, or, in the absence of (a): (b) By correcting the error if the percentage of error by calibration, test or mathematical calculation, or, in the absence of both (a) and (b) then: (c) By estimating the quantity of delivery from deliveries during periods under similar conditions when the meter was registering accurately; and an appropriate billing adjustment shall be made in accordance wtth the current Rules and Regulations governing gas systems issued by the Commission. 9. Seller will maintain its meters in good order and to this end will make periodic tests of its meters pursuant to the current Rules and Regulations governing gas systems issued by the Commission, or at such shorter intervals as seem to Seller desirable. If ▇▇▇▇▇ is dissatisfied with the accuracy at any time, it may call upon Seller to have the meter tested ·in accordance with all regulations relating to such tests and results of such tests as found in the current Rules and Regulations governing gas systems issued by the Commission. 10. Each party shall preserve all records for a period of at least two (2) years.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference.

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.