Common use of COST ITEMS Clause in Contracts

COST ITEMS. 8.2.1 All architectural, engineering, CAD design fees and consulting fees and expenses incurred in designing, selling and constructing the Project. 8.2.2 Wages paid for labor in the direct employ of the Contractor in the performance of the Work under applicable collective bargaining agreements, or under a salary or wage schedule agreed upon by the Owner and the Contractor, and including such welfare or benefits, if any, as may be payable with respect thereto. 8.2.3 Salaries of Contractor’s employees when stationed at the field office, employees engaged on the road expediting the production or transportation of materials and equipment and employees from the main or branch office performing the functions listed in this Article. 8.2.4 Cost of all employee benefits and taxes for such items as unemployment compensation and social security, insofar as such cost is based on wages, salaries, or other remuneration paid to employees of the Contractor and included in the Cost of the Project under Subparagraphs 8.2.1, 8.2.2 and 8.2.3. 8.2.5 The cost of items included in 8.2.2, 8.2.3 and 8.2.4 shall be billed to the Project in accordance with Contractor’s Standard Rate Schedule attached as Addendum C. 8.2.6 Reasonable transportation, traveling and hotel and moving expenses of the Contractor or of his officers or employees incurred in discharge of duties connected with the Project. 8.2.7 Cost of all materials, supplies and construction equipment stored at or incorporated in the Project, including costs of transportation and storage thereof. 8.2.8 Payments made by the Contractor to Subcontractors for Work performed pursuant to contract under this Agreement. 8.2.9 Cost, including transportation and maintenance, of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workmen, which are employed or consumed in the performance of the Work, and cost less salvage value on such items used, but not consumed, which remain the property of the Contractor. Guaranteed Max Price Revised 06/18/2007 8.2.10 Rental charges of all necessary machinery and equipment, exclusive of hand tools, used at the site of the Work, whether rented from others or owned by the Contractor, including installations, repairs and replacements, dismantling, removal, costs of lubrication, transportation and delivery costs thereof, at rental charges consistent with those prevailing in the area. 8.2.11 Cost of the premiums for all insurance, which the Contractor is required to procure by this Agreement or is deemed necessary by the Contractor. 8.2.12 Licenses, tests, royalties, damages for infringement of patents and costs of defending suits thereof for which the Contractor is responsible under Subparagraph 2.3.1 and deposits lost for causes other than the Contractor’s negligence. 8.2.13 Losses, expenses or damages to the extent not compensated by insurance or otherwise (including settlement made with the written approval of the Owner), and the cost of corrective work. 8.2.14 Minor expenses such as telegrams, long-distance telephone calls, telephone service at the site, expressage, and similar ▇▇▇▇▇ cash items in connection with the Project. 8.2.15 Cost of removal of all debris. 8.2.16 Cost incurred due to an emergency affecting the safety of persons and property. 8.2.17 Cost of data processing services required in the performance of the services outlined in Article 2. 8.2.18 Down payments required by manufacturers on equipment ordered for and to be incorporated into the project.

Appears in 1 contract

Sources: Design Build Agreement (Soy Energy, LLC)

COST ITEMS. 8.2.1 All architectural, engineering, CAD design fees and consulting fees and expenses incurred in designing, selling and constructing the Project. 8.2.2 Wages paid for labor in the direct employ of the Contractor Construction Manager in the performance of the Work under applicable collective bargaining agreementsWork. Labor costs shall be itemized to indicate trade, or under a salary or wage schedule agreed upon by the Owner and the Contractorhourly rate, man hours, and including such welfare or benefits, if any, as may be payable with respect theretototal cost. 8.2.3 8.2.2 Salaries of Contractor’s the Construction Manager's employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of materials material and equipment equipment, and employees from the main principal or branch office performing the functions listed in below directly attributable to the change. The Owner may require that the Construction Manager provide sufficient documentation of actual expenses claimed under this Articlesubsection. 8.2.4 8.2.3 Cost of all employee benefits and taxes for such items as taxes, including but not limited to, workers' compensation, unemployment compensation and compensation, social security, health, welfare, retirement, and other fringe benefits as required by law, labor agreements, or paid under the Construction Manager's standard personnel policy, insofar as such cost is based on wages, salaries, or other remuneration costs are paid to employees of the Contractor and Construction Manager who are included in the Cost of the Project under Subparagraphs 8.2.1, Work pursuant to subsections 8.2.1 and 8.2.2 and 8.2.3immediately above. 8.2.5 The cost of items included in 8.2.2, 8.2.3 and 8.2.4 shall be billed to the Project in accordance with Contractor’s Standard Rate Schedule attached as Addendum C. 8.2.6 Reasonable transportation, traveling and travel, hotel and moving expenses of the Contractor or of his officers or employees Construction Manager's personnel incurred in discharge of duties connected connection with the ProjectWork. 8.2.7 8.2.5 Cost of all materials, supplies and construction equipment stored at or incorporated in the ProjectWork, including costs of transportation inspection and storage thereoftesting if not provided by the Owner, transportation, storage, and handling. Material costs shall be itemized to include unit cost, quantity, and total cost for each item. 8.2.8 8.2.6 Payments made by the Contractor Construction Manager to Subcontractors for Work work performed pursuant to contract under this Agreement. Subcontractor costs shall be appropriately itemized, and the Construction Manager shall furnish Subcontractor quotations or itemization for all costs included. 8.2.9 8.2.7 Cost, including transportation and maintenance, maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workmen, which workers that are employed used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed, which consumed that remain the property of the Contractor. Guaranteed Max Price Revised 06/18/2007Construction Manager. 8.2.10 8.2.8 Rental charges of all necessary machinery and equipment, exclusive of hand toolstools owned by workers, used at the site of the WorkWorksite, whether rented from others the Construction Manager or owned by the ContractorOthers, including installationsinstallation, repairs repair and replacementsreplacement, dismantling, removal, costs of lubricationmaintenance, transportation transportation, and delivery costs thereofcosts. Rental from unrelated third parties shall be reimbursed at actual cost. Rentals from the Construction Manager or its affiliates, subsidiaries, or related parties shall be reimbursed at rental charges consistent with those the prevailing rates in the arealocality of the Worksite up to eighty-five percent (85%) of the value of the piece of equipment. Equipment costs shall be itemized to include equipment type, number of each, equipment charge out rate, and total cost for each item. 8.2.11 8.2.9 Cost of the premiums for all insurance, insurance and surety bonds which the Contractor Construction Manager is required to procure by this Agreement or is deemed deems necessary and approved by the ContractorOwner including any additional premium incurred as a result of any increase in the GMP. 8.2.10 Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which the Construction Manager is liable; except when a sales tax exemption certificate has been provided as indication in Section 3.19. 8.2.11 Permits, fees, licenses, tests, and royalties. 8.2.12 LicensesAll costs associated with establishing, testsequipping, royaltiesoperating, damages for infringement of patents maintaining, and costs of defending suits thereof for which demobilizing the Contractor is responsible under Subparagraph 2.3.1 and deposits lost for causes other than the Contractor’s negligencefield office. 8.2.13 LossesAll water, expenses or damages to the extent not compensated by insurance or otherwise (including settlement made with the written approval of the Owner)power, and fuel costs paid by the cost of corrective workConstruction Manager that are directly incurred to perform the Work. 8.2.14 Minor expenses such as telegrams, long-distance telephone calls, telephone service at the site, expressage, and similar ▇▇▇▇▇ cash items in connection with the Project. 8.2.15 Cost of removal of all nonhazardous substances, debris, and waste materials. 8.2.16 Cost incurred due to an emergency affecting the safety of persons and property. 8.2.17 Cost of data processing services required in the performance of the services outlined in Article 2. 8.2.18 Down payments required by manufacturers on equipment ordered for and to be incorporated into the project.

Appears in 1 contract

Sources: Construction Manager Agreement

COST ITEMS. 8.2.1 All architectural, engineering, CAD design fees and consulting fees and expenses incurred in designing, selling and constructing the Project. 8.2.2 Wages paid for labor in the direct employ of the Contractor Construction Manager in the performance of the Work under applicable collective bargaining agreementsWork. Labor costs shall be itemized to indicate trade, or under a salary or wage schedule agreed upon by the Owner and the Contractorhourly rate, man hours, and including such welfare or benefits, if any, as may be payable with respect theretototal cost. 8.2.3 8.2.2 Salaries of Contractor’s the Construction Manager's employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of materials material and equipment equipment, and employees from the main principal or branch office performing the functions listed in below directly attributable to the change. The Owner may require that the Construction Manager provide sufficient documentation of actual expenses claimed under this ArticleSubsection 8.2.2. 8.2.4 8.2.3 Cost of all employee benefits and taxes for such items as taxes, including but not limited to, workers' compensation, unemployment compensation and compensation, social security, health, welfare, retirement, and other fringe benefits as required by law, labor agreements, or paid under the Construction Manager's standard personnel policy, insofar as such cost is based on wages, salaries, or other remuneration costs are paid to employees of the Contractor and Construction Manager who are included in the Cost of the Project under Subparagraphs 8.2.1, 8.2.2 Work pursuant to subsections .1 and 8.2.3.2 immediately above. 8.2.5 The cost of items included in 8.2.2, 8.2.3 and 8.2.4 shall be billed to the Project in accordance with Contractor’s Standard Rate Schedule attached as Addendum C. 8.2.6 Reasonable transportation, traveling and travel, hotel and moving expenses of the Contractor or of his officers or employees Construction Manager's personnel incurred in discharge of duties connected connection with the ProjectWork. 8.2.7 8.2.5 Cost of all materials, supplies and construction equipment stored at or incorporated in the ProjectWork, including costs of transportation inspection and storage thereoftesting if not provided by the Owner, transportation, storage, and handling. Material costs shall be itemized to include unit cost, quantity, and total cost for each item. 8.2.8 8.2.6 Payments made by the Contractor Construction Manager to Subcontractors for Work work performed pursuant to contract under this Agreement. The direct expenses and overhead and profit percentages for work performed by Subcontractors is subject to the same limitations and requirements specified herein for the Construction Manager. Subcontractor costs shall be appropriately itemized and the Construction Manager shall furnish Subcontractor quotations or itemization for all costs included. 8.2.9 8.2.7 Cost, including transportation and maintenance, maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workmen, which workers that are employed used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed, which consumed that remain the property of the Contractor. Guaranteed Max Price Revised 06/18/2007Construction Manager. 8.2.10 8.2.8 Rental charges of all necessary machinery and equipment, exclusive of hand toolstools owned by workers, used at the site of the WorkWorksite, whether rented from others the Construction Manager or owned by the ContractorOthers, including installationsinstallation, repairs repair and replacementsreplacement, dismantling, removal, costs of lubricationmaintenance, transportation transportation, and delivery costs thereofcosts. Rental from unrelated third parties shall be reimbursed at actual cost. Rentals from the Construction Manager or its affiliates, subsidiaries, or related parties shall be reimbursed at rental charges consistent with those the prevailing rates in the arealocality of the Worksite up to eighty-five percent (85%) of the value of the piece of equipment. Equipment costs shall be itemized to include equipment type, number of each, equipment charge out rate, and total cost for each item. 8.2.11 8.2.9 Cost of the premiums for all insurance, insurance and surety bonds which the Contractor Construction Manager is required to procure by this Agreement or is deemed necessary deems necessary, and approved by the ContractorOwner including any additional premium incurred as a result of any increase in the GMP. 8.2.12 Licenses8.2.10 Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which the Construction Manager is liable; except when a sales tax exemption certificate has been provided as indication in subsection XXXX. The Owner may require that the Construction Manager provide sufficient documentation of actual expenses claimed under this subsection 8.2.10. 8.2.11 Permits, fees, licenses, tests, royalties,. 8.2.12 All costs associated with establishing, damages for infringement of patents equipping, operating, maintaining, and costs of defending suits thereof for which demobilizing the Contractor is responsible under Subparagraph 2.3.1 and deposits lost for causes other than the Contractor’s negligencefield office. 8.2.13 LossesAll water, expenses or damages to the extent not compensated by insurance or otherwise (including settlement made with the written approval of the Owner)power, and fuel costs paid by the cost of corrective workConstruction Manager that are directly incurred to perform the Work. 8.2.14 Minor expenses such as telegrams, long-distance telephone calls, telephone service at the site, expressage, and similar ▇▇▇▇▇ cash items in connection with the Project. 8.2.15 Cost of removal of all nonhazardous substances, debris, and waste materials. 8.2.16 Cost incurred due 8.2.15 The percentage ▇▇▇▇-up for overhead and profit is subject to an emergency affecting the safety of persons and property.following limits: 8.2.17 Cost of data processing services required in the performance 8.2.15.1 Fifteen (15) percent maximum for Work directly performed by employees of the services outlined in Article 2. 8.2.18 Down payments required Construction Manager, Subcontractor, or Sub-subcontractor 8.2.15.2 Five (5) percent maximum for Work performed or passed through by manufacturers on equipment ordered for a Subcontractor and passed through to be incorporated into the project.Owner by the Construction Manager

Appears in 1 contract

Sources: Construction Manager Agreement

COST ITEMS. 8.2.1 All architectural, engineering, CAD design fees and consulting fees and expenses incurred in designing, selling and constructing the Project. 8.2.2 Wages paid for labor in the direct employ of the Contractor Construction Manager in the performance of the Work under applicable collective bargaining agreementsWork. Labor costs shall be itemized to indicate trade, or under a salary or wage schedule agreed upon by the Owner and the Contractorhourly rate, man hours, and including such welfare or benefits, if any, as may be payable with respect theretototal cost. 8.2.3 8.2.2 Salaries of Contractor’s the Construction Manager's employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of materials material and equipment equipment, and employees from the main principal or branch office performing the functions listed in below directly attributable to the change. The Owner may require that the Construction Manager provide sufficient documentation of actual expenses claimed under this ArticleSubsection 8.2.2. 8.2.4 8.2.3 Cost of all employee benefits and taxes for such items as taxes, including but not limited to, workers' compensation, unemployment compensation and compensation, social security, health, welfare, retirement, and other fringe benefits as required by law, labor agreements, or paid under the Construction Manager's standard personnel policy, insofar as such cost is based on wages, salaries, or other remuneration costs are paid to employees of the Contractor and Construction Manager who are included in the Cost of the Project under Subparagraphs 8.2.1, 8.2.2 Work pursuant to subsections .1 and 8.2.3.2 immediately above. 8.2.5 The cost of items included in 8.2.2, 8.2.3 and 8.2.4 shall be billed to the Project in accordance with Contractor’s Standard Rate Schedule attached as Addendum C. 8.2.6 Reasonable transportation, traveling and travel, hotel and moving expenses of the Contractor or of his officers or employees Construction Manager's personnel incurred in discharge of duties connected connection with the ProjectWork. 8.2.7 8.2.5 Cost of all materials, supplies and construction equipment stored at or incorporated in the ProjectWork, including costs of transportation inspection and storage thereoftesting if not provided by the Owner, transportation, storage, and handling. Material costs shall be itemized to include unit cost, quantity, and total cost for each item. 8.2.8 8.2.6 Payments made by the Contractor Construction Manager to Subcontractors for Work work performed pursuant to contract under this Agreement. Subcontractor costs shall be appropriately itemized and the Construction Manager shall furnish Subcontractor quotations or itemization for all costs included. 8.2.9 8.2.7 Cost, including transportation and maintenance, maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workmen, which workers that are employed used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed, which consumed that remain the property of the Contractor. Guaranteed Max Price Revised 06/18/2007Construction Manager. 8.2.10 8.2.8 Rental charges of all necessary machinery and equipment, exclusive of hand toolstools owned by workers, used at the site of the WorkWorksite, whether rented from others the Construction Manager or owned by the ContractorOthers, including installationsinstallation, repairs repair and replacementsreplacement, dismantling, removal, costs of lubricationmaintenance, transportation transportation, and delivery costs thereofcosts. Rental from unrelated third parties shall be reimbursed at actual cost. Rentals from the Construction Manager or its affiliates, subsidiaries, or related parties shall be reimbursed at rental charges consistent with those the prevailing rates in the arealocality of the Worksite up to eighty-five percent (85%) of the value of the piece of equipment. Equipment costs shall be itemized to include equipment type, number of each, equipment charge out rate, and total cost for each item. 8.2.11 8.2.9 Cost of the premiums for all insurance, insurance and surety bonds which the Contractor Construction Manager is required to procure by this Agreement or is deemed necessary deems necessary, and approved by the ContractorOwner including any additional premium incurred as a result of any increase in the GMP. 8.2.12 Licenses8.2.10 Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which the Construction Manager is liable; except when a sales tax exemption certificate has been provided as indication in subsection 3.19. The Owner may require that the Construction Manager provide sufficient documentation of actual expenses claimed under this subsection 8.2.10. 8.2.11 Permits, fees, licenses, tests, royalties,. 8.2.12 All costs associated with establishing, damages for infringement of patents equipping, operating, maintaining, and costs of defending suits thereof for which demobilizing the Contractor is responsible under Subparagraph 2.3.1 and deposits lost for causes other than the Contractor’s negligencefield office. 8.2.13 LossesAll water, expenses or damages to the extent not compensated by insurance or otherwise (including settlement made with the written approval of the Owner)power, and fuel costs paid by the cost of corrective workConstruction Manager that are directly incurred to perform the Work. 8.2.14 Minor expenses such as telegrams, long-distance telephone calls, telephone service at the site, expressage, and similar ▇▇▇▇▇ cash items in connection with the Project. 8.2.15 Cost of removal of all nonhazardous substances, debris, and waste materials. 8.2.16 Cost incurred due to an emergency affecting the safety of persons and property. 8.2.17 Cost of data processing services required in the performance of the services outlined in Article 2. 8.2.18 Down payments required by manufacturers on equipment ordered for and to be incorporated into the project.

Appears in 1 contract

Sources: Construction Manager Agreement

COST ITEMS. 8.2.1 All architectural, engineering, CAD design fees and consulting fees and expenses incurred in designing, selling and constructing the Project. 8.2.2 Wages paid for labor in the direct employ of the Contractor Construction Manager in the performance of the Work under applicable collective bargaining agreements, or under a salary or wage schedule agreed upon by the Owner and the Contractor, and including such welfare or benefits, if any, as may be payable with respect theretoWork. 8.2.3 8.2.2 Salaries of Contractor’s the Construction Manager's employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of materials material and equipment equipment, and employees from the main principal or branch office performing the functions listed below: [ _].Project Manager’s labor cost whether stationed in this Articlethe field or home office. 8.2.4 8.2.3 Cost of all employee benefits and taxes for such items as taxes, including but not limited to, workers' compensation, unemployment compensation and compensation, social security, health, welfare, retirement, and other fringe benefits as required by law, labor agreements, or paid under the Construction Manager's standard personnel policy, insofar as such cost is based on wages, salaries, or other remuneration costs are paid to employees of the Contractor and Construction Manager who are included in the Cost of the Project under Subparagraphs 8.2.1, 8.2.2 Work pursuant to subsections .1 and 8.2.3.2 immediately above. 8.2.5 The cost of items included in 8.2.2, 8.2.3 and 8.2.4 shall be billed to the Project in accordance with Contractor’s Standard Rate Schedule attached as Addendum C. 8.2.6 Reasonable transportation, traveling and travel, hotel and moving expenses of the Contractor or of his officers or employees Construction Manager's personnel incurred in discharge of duties connected connection with the ProjectWork. 8.2.7 8.2.5 Cost of all materials, supplies and construction equipment stored at or incorporated in the ProjectWork, including costs of transportation inspection and storage thereoftesting if not provided by the Owner, transportation, storage, and handling. 8.2.8 8.2.6 Payments made by the Contractor Construction Manager to Subcontractors for Work work performed pursuant to contract under this Agreement. 8.2.9 8.2.7 Cost, including transportation and maintenance, maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workmen, which workers that are employed used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed, which consumed that remain the property of the Contractor. Guaranteed Max Price Revised 06/18/2007Construction Manager. 8.2.10 8.2.8 Rental charges of all necessary machinery and equipment, exclusive of hand toolstools owned by workers, used at the site of the WorkWorksite, whether rented from others the Construction Manager or owned by the ContractorOthers, including installationsinstallation, repairs repair and replacementsreplacement, dismantling, removal, costs of lubricationmaintenance, transportation transportation, and delivery costs thereofcosts. Rental from unrelated third parties shall be reimbursed at actual cost. Rentals from the Construction Manager or its affiliates, subsidiaries, or related parties shall be reimbursed at rental charges consistent with those the prevailing rates in the arealocality of the Worksite up to eighty-five percent (85%) of the value of the piece of equipment. 8.2.11 8.2.9 Cost of the premiums for all insurance, insurance and surety bonds which the Contractor Construction Manager is required to procure by this Agreement or is deemed necessary deems necessary, and approved by the ContractorOwner including any additional premium incurred as a result of any increase in the GMP. 8.2.12 Licenses8.2.10 Sales, use, gross receipts, or other taxes, tariffs, or duties related to the Work for which the Construction Manager is liable. 8.2.11 Permits, fees, licenses, tests, royalties, damages for infringement of patents and costs of defending suits thereof for which the Contractor is responsible under Subparagraph 2.3.1 and deposits lost for causes other than the Contractor’s negligenceor copyrights. 8.2.13 8.2.12 Losses, expenses expenses, or damages to the extent not compensated by insurance or otherwise (including settlement made with the written approval of the Owner)otherwise, and the cost of corrective workwork during the Construction Phase and for a one year period following the Date of Substantial Completion, provided that such losses, expenses, damages, or corrective work did not arise from the Construction Manager’s negligence. 8.2.13 All costs associated with establishing, equipping, operating, maintaining, and demobilizing the field office. 8.2.14 Minor expenses such as telegramsReproduction costs, photographs, facsimile transmissions, long-distance telephone calls, data processing costs and services, postage, express delivery charges, data transmission, telephone service service, and computer-related costs at the site, expressage, Worksite to the extent such items are used and similar ▇▇▇▇▇ cash items consumed in connection with the Projectperformance of the Work or are not capable of use after completion of the Work. 8.2.15 All water, power, and fuel costs necessary for the Work. 8.2.16 Cost of removal of all nonhazardous substances, debris, and waste materials. 8.2.16 Cost 8.2.17 Costs incurred due to an emergency affecting the safety of persons and or property. 8.2.17 Cost 8.2.18 Legal, mediation, and arbitration fees and costs, other than those arising from disputes between the Owner and the Construction Manager, reasonably and properly resulting from the Construction Manager's performance of data processing services required the Work. 8.2.19 All costs directly incurred in the performance of the services outlined Work or in Article 2connection with the Project, and not included in the Construction Manager's Fee as set forth in ARTICLE 7, which are reasonably inferable from the Contract Documents. 8.2.18 Down payments required by manufacturers on equipment ordered for and to be incorporated into the project.