Cross Sections. The ENGINEER will develop an earthwork analysis to determine cut and fill quantities and provide final design cross sections at 100 feet intervals. Cross sections will be delivered in the standard TxDOT format on 11βx17β sheets or roll plots and electronic files. Cross sections and quantities will include existing pavement removals. Annotation will include at a minimum existing and proposed ROW, side slopes (front & back), profiles, etc. The ENGINEER will submit drawings at the 30%, 60%, and 95%, and final submittals, respectively.
Appears in 2 contracts
Sources: Professional Services, Professional Services