DECLARATION OF THE CONTRACTOR. I/We hereby declare that I/we have made myself /Ourselves thoroughly conversant with the Sub-soil conditions, the local conditions regarding all materials (such as stone, murum and etc.) and labour of which I/We have base my/our rates for this work. The specifications, conditions and lead of materials for this work have been carefully studied and understood by me/us before submitting this tender. I/We undertake to use only the best materials approved by the Engineer in charge, or his duly authorised representative assistant, before starting the work and to abide by his decision. I/We shall maintain / rectify the entire work as per as per standard specification of P.W.D. (Red Book) I.R.C. ▇▇▇▇▇ and M.O.R.T.&H. specification as soon as damage occurs upto the expiry defect liability period without putting forth any reasons. I hereby undertake to pay the laboures engaged on the work as per Minimum Wages Act 1948 applicable to the zone concerned. Signature of Contractor Seal &Address Sr. No. Material Test Frequency of Testing Remarks 1 Sand 1 Fineness Modules At the beginning and if there is change in source 2 Silt Contents 2 Metal 1 Crushing Value One test per 200 Cubic Metre or part thereof PWD Hand Book IS-56 Part – II 2 Impact Value 3 Abrasion Value 4 Water Absorption 5 Flakiness Index 6 Slupping Value 7 Gradation 3 Bricks 1 Crushing Strength A set of 15 Bricks for each 50000 consignment or part thereof IS – 1077 4 Flooring Tiles/ Vitrified Tiles 12 Flexural Strength Water Absorption A set of 12 Tiles for each 2000 tiles or part thereof IS-1237- 1989 Sr. No. Material Test Frequency of Remarks 2 Initial Setting Time
Appears in 1 contract
Sources: Tender Agreement
DECLARATION OF THE CONTRACTOR. I/We hereby declare that I/we We have made myself /Ourselves / ourselves thoroughly conversant with the Sub-soil subsoil conditions, the local conditions regarding all materials (such as stone, murum and murum, sand etc.) and labour of which I/We have base based my/our rates for this work. The specifications, conditions bore results and lead of materials for on this work have been carefully studied and understood by me/us before submitting this tender. I/We undertake to use only the best materials approved by the Engineer in chargeExecutive Engineer, Public Works Division No.1, Thane or his duly authorised representative assistant, before starting the work and to abide by his decision. I/We shall maintain hereby further declare that my / rectify the entire work as per as per standard specification our tender is unconditional in every manner of P.W.D. (Red Book) I.R.C. ▇▇▇▇▇ and M.O.R.T.&H. specification as soon as damage occurs upto the expiry defect liability period without putting forth any reasonswhatsoever in nature. I / We hereby undertake to pay the laboures labourers engaged on the work as per Minimum Wages Act Act. 1948 applicable to the zone concerned. Signature I/we have quoted my/our offer in percentage rate in words as well as in figures. I/we further undertake to enter into contract in regular “D” form in Public Works Department. The manufacturer / supplier ............………………………………....................................................... hereby declare that the apparatus / equipment and all accessories sold to the Department under this contract shall be of Contractor Seal &Address Srbest quality and workmanship and shall be strictly in accordance with the specifications and particulars contained/mentioned in the clause hereof and the manufacturer/supplier hereby guarantee that the said Materials and all accessories would continue to conform to the description and quality aforesaid for a period of 3 days from the date of commissioning of the said Materials and all accessories to the Department and that not withstanding the fact that the Department may have inspected, approved and/or the said Materials and all accessories, if during the aforesaid period of 3 days the said Materials and all accessories be discovered not to conform to the description and quality aforesaid or have deteriorated and the Department will be entitled to reject the said Materials and all accessories or such portion thereof as may be discovered not to conform to the said description and quality. NoOn such rejection the Materials and all accessories will be at the supplier risk and all the provisions herein contained relating to rejection of goods etc., shall apply. Material Test Frequency The supplier shall, if so called upon to do, replace the Materials and all accessories or such portion thereof as is rejected by the Department, otherwise the supplier shall pay to the Department such damages as may arise by reason of Testing Remarks 1 Sand 1 Fineness Modules At the beginning and if there is change breach of the condition contained herein Nothing herein contained shall prejudice anys other right or the Department in source 2 Silt Contents 2 Metal 1 Crushing Value One test per 200 Cubic Metre that behalf under this contract or part thereof PWD Hand Book IS-56 Part – II 2 Impact Value 3 Abrasion Value 4 Water Absorption 5 Flakiness Index 6 Slupping Value 7 Gradation 3 Bricks 1 Crushing Strength A set otherwise.
2) NAME OF WORK:- Quotations are Invited Form Empanelled Chartered Accountant for Account Settlement of 15 Bricks for each 50000 consignment or part thereof IS – 1077 4 Flooring Tiles/ Vitrified Tiles 12 Flexural Strength Water Absorption A set of 12 Tiles for each 2000 tiles or part thereof IS-1237- 1989 SrB.O.T. Road Project. No. Material Test Frequency of Remarks 2 Initial Setting Time(Project Cost Rs.227.60 Crore)
Appears in 1 contract
Sources: Tender Agreement