DELIVERY and STORAGE of MATERIAL Clause Samples

DELIVERY and STORAGE of MATERIAL. A. Submit manufacturer’s invoice, with or without paint cost, to the Engineer for review. This submittal will be used to identify the quantity of paint recommended by the manufacturer for a job of this size and design and will be used to check the quantity actually delivered to the project. B. Cover bulk materials subject to deterioration because of dampness, weather, or contamination, and protect while in storage. C. Maintain materials in original, sealed containers, unopened and with labels plainly indicating the manufacturer’s name, brand, type, grade of material, and batch numbers. D. Remove from the work site containers that are broken, opened, water marked, and/or contain caked, lumpy, or otherwise damaged materials. They are unacceptable. E. Store the material in a climate controlled designated area where the temperature will not exceed the manufacturer’s storage recommendations. Heat the storage area to the manufacturer’s recommended minimum mixing temperature. F. Keep equipment stored outdoors from contact with the ground, away from areas subject to flooding, and covered with weatherproof plastic sheeting or tarpaulins. G. Store all painting materials in a location outside the structure. H. Do not store or have on-site unapproved material, material from different manufacturers, or materials from different projects.

Related to DELIVERY and STORAGE of MATERIAL

  • Storage of Materials Borrower shall cause all materials supplied for or intended to be utilized in the construction of the Improvements but not affixed to or incorporated into the Property to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards to prevent loss, theft, damage or commingling with other materials not intended to be utilized in the construction of the Improvements.

  • Use of Material The Employer intends using the information provided by the Consultant for purposes including: • professional advice regarding decisions to be made in connection with the subject matter of the services; • inputs into the work of others and the administration of contracts; and • professional inputs into the delivery process Task specific use of information provided by the Consultant is set out in the Task Order.

  • Quality of Materials and workmanship The Contractor shall ensure that the Construction, Materials and workmanship are in accordance with the requirements specified in this Agreement, Specifications and Standards and Good Industry Practice.

  • Supply of Materials The following materials will be supplied by the department Name of Materials Rate. Place of delivery 1.

  • Use of Materials There should be no limitations or restrictions by Union upon a Contractor's choice of materials or design, nor, regardless of source or location, upon the full use and utilization, of equipment, machinery, packaging, precast, prefabricated, prefinished, or preassembled materials, tools or other labor saving devices, subject to the application of the California Public Contract and Labor Codes. Generally, the onsite installation or application of such items shall be performed by the craft having jurisdiction over such work.