Delivery and Storage of Materials. The Contractor shall deliver all manufactured materials in the original packages, containers or bundles (with the seals unbroken) bearing the name of identification ▇▇▇▇ of the manufacturer. However, materials shall not be delivered to nor stockpiled/stored at the site before they are needed. Storage Facilities: The storage of material and construction equipment shall be as designated by ASU. Access to adjacent buildings shall be maintained free and clear at all times. Careful planning and scheduling of deliveries is mandatory. The Contractor shall assume full responsibility for properly storing and protecting materials and equipment. Equipment shall be completely protected with plastic film, unless otherwise directed by the DP. If required, storage facilities will be constructed. Ends of piping, conduit and openings to interior or equipment shall be sealed. Failure to adequately protect material and equipment to the satisfaction of the DP shall be sufficient cause for rejection of any damaged items. Workmanship: Where not more specifically described in any of the various sections of these specifications, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction or installation regularly furnished or required for completion (including any finish, and for successful operation as intended).
Appears in 2 contracts
Sources: Construction Agreement, Construction Agreement