Description and Location of Work Clause Samples

The "Description and Location of Work" clause defines the specific nature and geographical site of the work to be performed under the contract. It typically outlines the scope of tasks, services, or deliverables required, and identifies the exact address or area where the work will take place. For example, it may specify that construction is to occur at a particular building or that services are to be rendered at a designated facility. This clause ensures both parties have a clear, mutual understanding of what is to be done and where, thereby reducing the risk of disputes over scope or location during the project.
Description and Location of Work. This project is generally described as the installation of approximately 2,528 linear feet of various storm drain pipes, 24 storm drain structures, curb and gutter, residential driveway entrances, concrete sidewalk extension, ditches, asphalt milling and overlay, utility relocation, site restoration, and associated work on Fresno Street, Aspen Street, Ajax Avenue, Cove Road and ▇▇▇▇▇▇ Street, NW. This short description, however, shall not in any way be construed to limit the Contractor’s obligation for compliance with the Contract Documents.
Description and Location of Work. The description and location of the Work for which bids ("Bids") are requested are specified on Page I, "Bid Information.”
Description and Location of Work. This project is generally described as stormwater channel improvements utilizing natural stream restoration techniques consisting of the installation of coir log / filter sock walls, stacked stone walls, turf reinforcement matting, 12 linear feet of reinforced concrete pipe, stream barbs, rock cross vanes, stone outlet protection, landscaping removal/replacement, seeding, site restoration, and associated work along an unnamed Tinker Creek tributary in the general vicinity of ▇▇▇▇▇▇▇ Circle, ▇▇▇▇▇▇▇ Drive, Old Mountain Road, ▇▇▇▇▇▇▇ Circle, and Monterey Road, NE within the Monterey neighborhood. This short description, however, shall not in any way be construed to limit the Contractor’s obligation for compliance with the Contract Documents.
Description and Location of Work. The description and location of the work for which bids are requested are specified in the Bid Specifications, which are included as Appendix B of the Agreement.
Description and Location of Work. The work consists of the following summary of activities. 1. Providing one (1) fully equipped mud-rotary drilling rig at one time staffed with one (1) driller and at least two (2) driller’s helpers and one (1) fully equipped hollow-stem auger drilling rig staffed with one (1) driller and at least one (1) driller’s helper for hollow-stem auger drilling. One (1) certified Mud Engineer (PEC, CCE) must also be provided for mud rotary drilling when appropriate due to drill hole depths or as requested by the Geologist. Drill crews will not work consecutive shifts. Deep mud-rotary drilling operations must be capable of running twenty-four (24) hours. The ▇▇▇▇▇ may include single and multi-completion monitoring ▇▇▇▇▇ from approximately 50 up to 1,200 feet deep and domestic water supply ▇▇▇▇▇. Materials to be drilled will range from soft clays to loose sands, gravels, and boulders, and bedrock varying from weathered and weak, to fresh and very hard. Most holes will encounter groundwater while some holes may be dry. Some holes may have stable walls while others may exhibit caving and/or flowing conditions. 2. Deep mud-rotary drilling operations must be capable of working twenty-four (24) hours per day until the hole is complete, typically in five (5) to ten (10) days. Drill crews will not work consecutive shifts of up to twelve (12) hours. 3. The drilled holes most often will be completed as groundwater observation ▇▇▇▇▇, with depths ranging from tens of feet to an expected maximum depth of 1,200 feet. Depending on the site location and geologic condition, multiple ▇▇▇▇▇ may be installed in one reamed hole. 4. Drilling sites will be predominately located in groundwater basins in the following specific counties covered under this contract: Santa ▇▇▇▇▇, Santa ▇▇▇▇, San ▇▇▇▇▇▇, Monterey, and San Luis Obispo, California under this contract. 5. Locations may require continuous soil core sampling at depths greater than 200 feet. 6. In addition to drilling services, the Contractor will provide, when requested in writing by the Geologist, geophysical testing services, well pump removal and wellhead modification services, and other special equipment and services.
Description and Location of Work. This project is generally described as the installation of approximately 1,156 linear feet of various storm drain pipes, 19 storm drain structures, curb and gutter, residential entrances, concrete sidewalk replacement, asphalt milling and overlay, site restoration, utility relocation, water meter adjustments, and associated work on the 3900 and 4000 blocks of Wyoming Avenue and Kentucky Avenue, 1300 block of ▇▇▇▇▇▇▇ Road, and 1400 blocks of Westside Boulevard; in the northwest quadrant of the City of Roanoke. This short description, however, shall not in any way be construed to limit the Contractor’s obligation for compliance with the Contract Documents.
Description and Location of Work. The work consists of the following summary of activities. 1. Providing one (1) fully equipped mud-rotary drilling rig at one time staffed with one (1) driller and at least two (2) driller’s helpers and one (1) fully equipped hollow-stem auger drilling rig staffed with one (1) driller and at least one (1) driller’s helper for hollow-stem auger drilling. One (1) certified Mud Engineer (PEC, CCE) must also be provided for mud rotary drilling when appropriate due to drill hole depths or as requested by the Geologist. Drill crews will not work consecutive shifts. Deep mud-rotary drilling operations must be capable of running twenty-four (24) hours. The ▇▇▇▇▇ may include single and multi-completion monitoring ▇▇▇▇▇ from approximately 50 up to 1,200 feet deep and domestic water supply ▇▇▇▇▇. Materials to be drilled will range from soft clays to loose sands, gravels, and boulders, and bedrock varying from weathered and weak, to fresh and very hard. Most holes will encounter groundwater while some holes may be dry. Some holes may have stable walls while others may exhibit caving and/or flowing conditions. 2. Deep mud-rotary drilling operations must be capable of working twenty-four (24) hours per day until the hole is complete, typically in five (5) to ten (10) days. Drill crews will not work consecutive shifts of up to twelve (12) hours. 3. The drilled holes most often will be completed as groundwater observation ▇▇▇▇▇, with depths ranging from tens of feet to an expected maximum depth of 1,200 feet. Depending on the site location and geologic condition, multiple ▇▇▇▇▇ may be installed in one reamed hole. 4. Drilling sites will be predominately located in groundwater basins in the following specific counties covered under this contract: Santa ▇▇▇▇▇, Santa ▇▇▇▇, San ▇▇▇▇▇▇, Monterey, and San Luis Obispo, California under this contract. 5. Locations may require continuous soil core sampling at depths greater than 200 feet. 6. In addition to drilling services, the Contractor will provide, when requested in writing by the Geologist, geophysical testing services, well pump removal and wellhead modification services, and other special equipment and services.
Description and Location of Work. This project is generally described as the installation of approximately 76 linear feet of various storm drain pipes, 6 storm drain structures including a Contech CDS unit, curb and gutter, residential driveway entrances, asphalt pavement, utility relocation, site restoration, and associated work on Hartland Road and Inglewood Road. This short description, however, shall not in any way be construed to limit the Contractor’s obligation for compliance with the Contract Documents.

Related to Description and Location of Work

  • Description of Work that has been omitted or

  • Location of Work The Executive shall be based in the United States in West Orange, New Jersey. However, the Executive agrees to undertake whatever domestic and worldwide travel is required by the Company. The Executive shall not be required or permitted to relocate without the mutual, written consent of the Executive and the Company.

  • Detailed Description of Services / Statement of Work Describe fully the services that Contractor will provide, or add and attach Exhibit B to this Agreement.

  • Data Location 1.1. The CONTRACTOR shall not store or transfer non-public COUNTY data outside of the United States. This includes backup data and Disaster Recovery locations. The CONTRACTOR will permit its personnel and contractors to access COUNTY data remotely only as required to provide technical support. (Remote access to data from outside the continental United States is prohibited unless approved in advance and in writing by the County.) 1.2. The CONTRACTOR must notify the COUNTY in advance and in writing of any location changes to CONTRACTOR’s data center(s) that will process or store County data.

  • Inspection of Work It is FIRST PARTY's obligation to make the work product available for CITY's inspections and periodic reviews upon request by CITY.