Description Qty. Unit Total Fourth Floor Construction ------------------------- 2 x 2 ceiling 29,736 ea $16,468 2 x 2 light fixtures (233 additional lights) 233 ea $18,528 Labor to install 2 x 2 light fixtures 233 ea $16,543 BECO energy efficient rebate 233 ea $(3,309) Extension to walls to deck 2,072 sf $13,240 Insulation of interior partition walls 17, 102 sf $ 6,071 Sliding metal doors with 24" x 36" plexi glass windows, installed 4 ea $10,343 Revised Blocking in partition for sliding door 4 hr $ 298 Paint door and track 16 hr $ 1,363 Drywall wrap door opening sliding doors (N/C) Painted gyp board ceiling 2,264 sf $ 4,147 MR-16 downlight 48 ea $ 7,920 Revised (Halo Recessed Light Fixtures) 6" aperture PAR lamp open downlight in Recept. Closets 3 ea $ 255 Revised (Halo Recessed Light Fixtures) Labor to install downlights 51 ea $ 4,345 Revised MR-16 lensed wall washers 7 ea $ 1,400 Revised (Halo Recessed Light Fixtures) Labor to install wall washer 7 ea $ 596 ▇▇▇▇▇ lighting flex-line 2 track, 8' sections 6 ea $ 2,982 Unilight fixtures, Takato 75/330, for track (allowance only) 16 ea $ 6,816 (Price based on information provided by Artesania) Labor to install track lighting 22 hr $ 1,874 8' paint grade, wood doors with metal frame (KD) 23 ea $ 5,226 Revised (hall doors to stay at 7') Painting cost 23 ea $ 1,960 Revised Paint cost for common hallway doors, interior only. 6 ea $ 1,022 Revised (includes preparation of door to paint) Paint grade, wood doors, std. size 7 ea $ 398 Revised Painting cost 7 ea $ 596 Revised paint grade, wood double doors w/metal frame (KD) 9 ea $ 3,323 Revised Paint cost 18 ea $ 1,534 Revised Oversize sidelight with frosted glass, lower half 7 ea $ 3,280 Revised
Appears in 1 contract
Sources: Commercial Lease (Interliant Inc)
Description Qty. Unit Total Fourth Floor Construction ------------------------- 2 x 2 Options ------- Additional premium costs to construct 12' nominal stair opening --------------------------------------------------------------- Premium for Larger Stair 1 ea $ 5,280 Steel Beams (4) 3000 lbs $ 1,584 Crane to lift beams into place 4 hr $ 396 Lift(s) to ▇▇▇▇ beams to ceiling 29,736 16 hr $ 1,584 Erect and weld into ▇▇▇▇▇ ▇▇ ▇▇ $ 4,752 Additional demolition 1 chg $ 660 Additional concrete removal (60 SF) 60 sf $ 792 Shore opening in preparation 8 hr $ 634 Engineer design and review 8 hr $ 1,320 Fireproof new steel with drywall 90 lf $ 1,188 Relocate HVAC system Relocate sprinkler piping $18,190 Computer Room ------------- Sprinkler modifications 24 hr $ 2,045 Materials for modifications 1 ea $16,468 2 x 2 light fixtures $ 284 $ 2,329 Cable Tray for Computer Room ---------------------------- Cable Tray, materials, fourth floor (233 additional lights18"w, 3"d, 9" spacing, 65 lf $ 1,292 center hung) 233 ea $18,528 Labor to install 2 x 2 light fixtures 233 Cable Tray, fourth floor 65 lf $ 277 $ 1,569 Electrical Conduit ------------------ Two 4" conduit from the Computer ▇▇▇▇ ▇▇▇ lf $15,222 to each Telcom Closet, Fourth Floor Two 4" EMT connecting the Telcom Closets on the Third 48 lf $ 886 Revised Floor to the closets on the Fourth Floor One floor penetration for each 4" EMT running between 4 ea $ 568 Revised the Third and Fourth Floor $16,543 BECO energy efficient rebate 233 ea $(3,309) Extension to walls 16,676 Subtenant Area -------------- Extend existing partitions to deck 2,072 sf $13,240 Insulation of interior partition walls 17, 102 at Shipping ▇▇▇▇ ▇▇▇ sf $ 6,071 Sliding metal doors with 24" x 36" plexi glass windows, installed 4 ea $10,343 1,636 Revised Blocking in partition for sliding door 4 hr $ 298 Paint door and track 16 hr $ 1,363 Drywall wrap door opening sliding doors (N/C) Painted gyp board ceiling 2,264 Construct full height demising partitions 788 sf $ 4,147 MR-16 5,035 $ 6,671 Kitchen/Cafe ------------ Premium charge for patterned non-standard VCT 1185 sf $ 3,365 $ 3,365 (allowance only) Additional Non-standard Lighting -------------------------------- Fourth Floor Conference Rooms, Rec Room & Demo #1 & 2 ----------------------------------------------------- Open downlight 48 - PAR lamp (allowance only) 113 ea $ 7,920 Revised (Halo Recessed Light Fixtures) 6" aperture PAR lamp open downlight in Recept. Closets 3 ea $ 255 9,605 Revised (Halo Recessed Light Fixtures) Labor to install downlights 51 (allowance only) 113 ea $ 4,345 Revised MR-16 lensed wall washers 7 9,628 ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇ #▇ & Rec Room ----------------------------------------- Open downlight - PAR lamp (allowance only) 34 ea $ 1,400 2,890 Revised (Halo Recessed Light Fixtures) Labor to install wall washer 7 downlights (allowance only) 34 ea $ 596 2,897 $25,019 Additional HVAC Fourth Floor ---------------------------- Description Qty. Unit Total Programmable Heat Pump Thermostats 33 ea $ 4,191 Revised Honeywell, No:4E189 Additional HVAC Third Floor --------------------------- Programmable Heat Pump Thermostats 32 ea $ 4,064 Revised Honeywell, No:4E189 $ 8,255 Total Cost including all options: $695,511 Restoration Fee --------------- Demo drywall partitions (high profile area) 4,710 sf $ 2,355 Demo curved glass partition (high profile area) 16 hr $ 960 Demo drywall ceiling and install drop ceiling 4,710 sf $ 14,130 (high profile area) Recarpet with CPL standard level loop (high profile area) 4,710 sf $ 9,420 Demo double drywall partition (third floor behind elevator) 180 sf $ 180 Recarpet with CPL standard level loop 240 sf $ 240 (in offices with double partition) Install 2' x 4' ceiling system 80 sf $ 288 Removal of sliding doors 14 hr $ 840 Infilling of opening to standard door size 126 sf $ 504 Remove spiral stair/infill opening/redo clg 1 ea $ 5,680 Removal and disposal of debris 2 ea $ 1,000 Additional restoration costs for 12' stair, if constructed ---------------------------------------------------------- Concrete 60 sf $ 792 Deck 60 sf $ 238 Steel beams 1 ea $ 330 Labor to install 8 hr $ 792 $ 37,749 Total Cost including all options and Restoration: $733,259 Other ----- Non-standard laminate. (more info due) sf NIC Specifically Excluded --------------------- Colored back lit wall, by others Banquet seats in lobby, by others Reception counter/desk, by others Millwork, by others except as noted Projection Screens, Dishwasher Additional HVAC Option ---------------------- HVAC Control Management System $46,363 Exhibit B ▇▇▇▇▇▇▇▇ lighting flex-line 2 trackProperties, 8' sections 6 ea $ 2,982 Unilight fixtures, Takato 75/330, for track (allowance only) 16 ea $ 6,816 (Price based on information provided by Artesania) Labor to install track lighting 22 hr $ 1,874 8' paint grade, wood doors with metal frame (KD) 23 ea $ 5,226 Revised (hall doors to stay at 7') Painting cost 23 ea $ 1,960 Revised Paint cost for common hallway doors, interior only. 6 ea $ 1,022 Revised (includes preparation of door to paint) Paint grade, wood doors, std. size 7 ea $ 398 Revised Painting cost 7 ea $ 596 Revised paint grade, wood double doors w/metal frame (KD) 9 ea $ 3,323 Revised Paint cost 18 ea $ 1,534 Revised Oversize sidelight with frosted glass, lower half 7 ea $ 3,280 RevisedLLC Square Footage Calculation Standards
Appears in 1 contract
Sources: Commercial Lease (Interliant Inc)