Common use of Design and Construction of Project Clause in Contracts

Design and Construction of Project. 9.1 Seller, at no cost to Edison, shall acquire all permits and approvals, and complete, or have completed, all environmental impact studies required for the construction, operation and maintenance of the Project. 9.2 Edison shall have the right to review the electrical drawings pertaining to the design of the Project and the Point of Interconnection. Such review shall be done in a timely manner and may include, but not be limited to, the generator, governor, excitation system, sychronizing equipment, protective relays and neutral grounding. 9.3 Edison shall have the right to require modifications to the design of the Project and/or the Point of Interconnection as it deems necessary for proper and safe operation of the Project when in parallel with the Edison electric system. If Seller does not agree to such modifications, the differences between the Parties shall be resolved pursuant to Section 25 prior to design approval. 9.4 Seller shall furnish, install, operate and maintain in good order and repair and without cost to Edison, the relays, meters, power circuit breakers, synchronizer and other control and protective apparatus as shall be agreed to by the Parties pursuant to Section 9.3. 9.5 Future changes on the Edison electric system and/or to the Project may require modification of the design of the Project or the Point of Interconnection. Any such modification, whether proposed by Edison or Seller, shall be subject to the provisions of this Section 9. 9.6 Edison shall have the right to monitor the construction, start-up, operation and maintenance of the Project and have the right to consult with, and make recommendations, to Seller's Operating Representative. 9.7 Seller shall furnish to Edison the Project construction schedule and shall notify Edison, at last one (1) year prior to the Date of Firm Operation, of any changes in such schedule which affect the Date of Firm Operation. 9.8 Edison shall have full access to all Project operations a have the right to use, solely for itself, free of royalty payments, any technological innovations developed by Seller in producing Net Energy from the Magma Resource. Edison shall have full access to all operating data and input regarding operation of the Project and the Geothermal Facilities. Except as otherwise legally required, Edison shall not disclose such information to others without first obtaining written permission from Seller.

Appears in 2 contracts

Sources: Power Purchase and Sales Agreement (Ormat Technologies, Inc.), Power Purchase and Sales Agreement (Ormat Technologies, Inc.)