Common use of Design and Engineering Services Clause in Contracts

Design and Engineering Services. The Consultant shall perform site planning and analysis and design services for the Project as provided in Exhibit A. As Project requirements are sufficiently identified, the Consultant shall periodically update the schedule in Exhibit E to identify milestone dates for decisions required of the Owner and design services furnished by the Consultant. Such updates shall not change task completion dates, unless the Owner grants written approval for such changes. Based on the approved program, and the Project Schedule the Consultant shall prepare, for approval by the Owner, Design Documents, developed in stages to the twenty five (25%) and twenty five (25%) to the one hundred percent (100%) level of complete design development consistent with the applicable procedures and standards of the Mass Highway 2006 Project Development and Design Guide, inclusive of drawings prepared on a CADD system and other documents illustrating the complete design. The Consultant shall prepare such studies or other materials as are necessary to establish the design of the Project. Upon proper authorization and notice to proceed the Consultant shall prepare, for approval by the Owner, Design Documents with the one hundred percent (100%) level of complete design development. The Owner has provided to the Consultant, and the Consultant has in its possession, certain information concerning existing conditions at the site tasks associated with Section 100: Project Development Engineering of the MassDOT – Highway Divisions Scoping Workbook Project, including the documents and information listed on Exhibit G. The Consultant shall review all such information, verify, in general, the accuracy of such information, and notify the Owner of any inconsistencies or discrepancies observed by the Consultant.

Appears in 1 contract

Sources: Consultant Agreement

Design and Engineering Services. The Consultant shall perform site planning and analysis and design services for the Project as provided in Exhibit A. As Project requirements are sufficiently identified, the Consultant shall periodically update the schedule in Exhibit E to identify milestone dates for decisions required of the Owner and design services furnished by the Consultant. Such updates shall not change task completion dates, unless the Owner grants written approval for such changes. Based on the approved program, and the Project Schedule the Consultant shall prepare, for approval by the Owner, Design Documents, developed in stages to the twenty five (25%) and twenty five (25%) to the one hundred percent (100%) level of complete design development consistent with the applicable procedures and standards of the Mass Highway 2006 Project Development and Design Guide, inclusive of drawings prepared on a CADD system and other documents illustrating the complete design. The Consultant shall prepare such studies or other materials as are necessary to establish the design of the Project. Upon proper authorization and notice to proceed the Consultant shall prepare, for approval by the Owner, Design Documents with the one hundred percent (100%) level of complete design development. The Owner has provided to the Consultant, and the Consultant has in its possession, certain information concerning existing conditions at the site tasks associated with Section 100: Project Development Engineering of the MassDOT – Highway Divisions Scoping Workbook Project, including the documents and information listed on Exhibit G. The Consultant shall review all such information, verify, in general, the accuracy of such information, and notify the Owner of any inconsistencies or discrepancies observed by the Consultant.

Appears in 1 contract

Sources: Consultant Agreement