Design Development and Construction Documents. Project management for the duration of Phase 1 • Conceptual and a significant degree of detailed design of the Facilities, including technology selection and equipment and materials specification; the Facilities design criteria shall ensure compliance with the Performance Requirements as described and identified in this Contract and Exhibit B. • Evaluation of alternatives for groundwater treatment technologies, equipment, and other elements as necessary of the Project that affect construction and life cycle costs, Contract performance, and CITY goals for the Project • Review of background and reference documents and preparation of Basis of Design Reports (“BDRs”) and other work products as defined in this Contract, with major milestones at 25%and 60-75% completion, and sufficient process and instrumentation diagrams (“P&IDs”), site plans, specifications, and other supporting documents to facilitate preparation of a Phase 2 GMP or Lump Sum Contract Price and Phase 2 Contract Time Proposal at 60-75% completion of design packages • Advising the CITY and facilitating CITY participation in all material decision making about the Facilities as such decision making may affect the Project scope and value, including CITY participation in select meetings and communications • Preparation of the Supervisory Controls and Data Acquisition (“SCADA”) system and security/surveillance system design for the Facilities in conformance with the City’s SCADA system • Necessary environmental documentation for compliance with California Environmental Quality Act (“CEQA”) requirements • Preliminary preparation of all necessary permit applications and facilitation of regulatory agency approval of all permits that are CONTRACTOR’s responsibility (CITY will sign the permit applications, furnish permit application fees, and attend permitting coordination and review meetings with regulatory agencies as necessary). City will maintain a lead role with the State Water Resources Control Board, Division of Drinking Water. • Preparation of unified sets of plans and specifications for use by the City to solicit competitive bids for construction of the Facilities if Contractor’s performance is unsatisfactory, Contract amendment negotiations for Phase 2 are unsuccessful, or the Contractor otherwise fails to perform under the terms of the Contract; it is anticipated in this event that Contractor shall assume responsibilities as the Engineer of Record and provide engineering services during construction by others • Development of a startup, commissioning and testing plans that will demonstrate facility compliance with design parameters developed in Phase 1 and constructed in Phase 2 • Solicitation of competitive proposals for the major trades, design packages, and material and equipment procurement, preparation of a firm Phase 2 GMP or Lump Sum and Contract Price and Phase 2 Contract Time, as defined and required in Articles 1(f) and (g) below, and negotiation of the Phase 2 GMP or Lump Sum Contract Price and Phase 2 Contract Time with CITY in accordance with the Contract • Negotiation of the Contract amendment, as defined in Article 1(f) below, for Phase 2 • In addition to the services identified above, CONTRACTOR will also perform all Phase 1 services identified in and reasonably inferred by this Contract, the RFP, and all Contract Documents for the Project. In particular, see the scope of services set forth in Exhibit C hereto.
Appears in 1 contract
Sources: Progressive Design Build Contract
Design Development and Construction Documents. Project management for the duration of Phase 1 • Conceptual and a significant degree of detailed design of the Facilities, including technology selection and equipment and materials specification; the Facilities design criteria shall ensure compliance with the Performance Requirements as described and identified in this Contract and Exhibit B. • Evaluation of alternatives for groundwater treatment technologies, equipment, and other elements as necessary of the Project that affect construction and life cycle costs, Contract performance, and CITY goals for the Project • Review of background and reference documents and preparation of Basis of Design Reports (“BDRs”) and other work products as defined in this Contract, with major milestones at 25%and 60-75% completion, and sufficient process and instrumentation diagrams (“P&IDs”), site plans, specifications, and other supporting documents to facilitate preparation of a Phase 2 GMP or Lump Sum Contract Price and Phase 2 Contract Time Proposal at 60-75% completion of design packages • Advising the CITY and facilitating CITY participation in all material decision making about the Facilities as such decision making may affect the Project scope and value, including CITY participation in select meetings and communications • Preparation of the Supervisory Controls and Data Acquisition (“SCADA”) system and security/surveillance system design for the Facilities in conformance with the City’s SCADA system • Necessary environmental documentation for compliance with California Environmental Quality Act (“CEQA”) requirements • Preliminary preparation of all necessary permit applications and facilitation of regulatory agency approval of all permits that are CONTRACTOR’s responsibility (CITY will sign the permit applications, furnish permit application fees, and attend permitting coordination and review meetings with regulatory agencies as necessary). City will maintain a lead role with the State Water Resources Control Board, Division of Drinking Water. • Preparation of unified sets of plans and specifications for use by the City to solicit competitive bids for construction of the Facilities if Contractor’s performance is unsatisfactory, Contract amendment negotiations for Phase 2 are unsuccessful, or the Contractor otherwise fails to perform under the terms of the Contract; it is anticipated in this event that Contractor shall assume responsibilities as the Engineer of Record and provide engineering services during construction by others others. • Development of a startup, commissioning and testing plans that will demonstrate facility compliance with design parameters developed in Phase 1 and constructed in Phase 2 • Solicitation of competitive proposals for the major trades, design packages, and material and equipment procurement, preparation of a firm Phase 2 GMP or Lump Sum and Contract Price and Phase 2 Contract Time, as defined and required in Articles 1(f) and (g) below, and negotiation of the Phase 2 GMP or Lump Sum Contract Price and Phase 2 Contract Time with CITY in accordance with the Contract • Negotiation of the Contract amendment, as defined in Article 1(f) below, for Phase 2 • In addition to the services identified above, CONTRACTOR will also perform all Phase 1 services identified in and reasonably inferred by this Contract, the RFP, and all Contract Documents for the Project. In particular, see the scope of services set forth in Exhibit C hereto.
Appears in 1 contract
Sources: Progressive Design Build Contract