Design Exceptions. The Engineer shall prepare up to 8 (eight) design waivers or exception questionnaires as warranted per State guidance (up to 2 design waivers/exceptions for each schematic Phase / Segment). The Engineer shall supply the required justification, facts, and summaries to support the proposed Design Waivers or Exceptions. The Engineer shall make up to two submittals and corresponding revisions of the design exception report.
Appears in 1 contract
Sources: Contract for Engineering Services
Design Exceptions. The Engineer shall prepare up to 8 ten (eight10) design waivers waiver or exception questionnaires as warranted per State guidance (up to 2 design waivers/exceptions for each schematic Phase / Segment)guidance. The Engineer shall supply the required justification, facts, and summaries to support the proposed Design Waivers or Exceptions. The Engineer shall make up to two submittals and corresponding revisions of the design exception report.. DocuSign Envelope ID: C8AF675D-2526-41B2-938D-3D337F7E3DEC
Appears in 1 contract
Sources: Contract for Engineering Services