Design Fee. The Port will retain an engineering firm to provide the design services necessary to connect the customer to the Port’s water system. The design fee will be paid by the customer based on actual costs; however, shall not exceed $5,000. The design fee shall be paid by the customer prior to proceeding with the construction phase.
Appears in 1 contract
Sources: Burbank Utility Agreement
Design Fee. The Port will retain an engineering firm to provide the design services necessary to connect the customer to the Port’s water systemsmall diameter pressure sewer transmission line. The design fee will be paid by the customer based on actual costs; however, shall not exceed $5,000. The design fee shall be paid by the customer prior to proceeding with the construction phase.
Appears in 1 contract
Sources: Burbank Utility Agreement