Research Use The Requester agrees that if access is approved, (1) the PI named in the DAR and (2) those named in the “Senior/Key Person Profile” section of the DAR, including the Information Technology Director and any trainee, employee, or contractor1 working on the proposed research project under the direct oversight of these individuals, shall become Approved Users of the requested dataset(s). Research use will occur solely in connection with the approved research project described in the DAR, which includes a 1-2 paragraph description of the proposed research (i.e., a Research Use Statement). Investigators interested in using Cloud Computing for data storage and analysis must request permission to use Cloud Computing in the DAR and identify the Cloud Service Provider (CSP) or providers and/or Private Cloud System (PCS) that they propose to use. They must also submit a Cloud Computing Use Statement as part of the DAR that describes the type of service and how it will be used to carry out the proposed research as described in the Research Use Statement. If the Approved Users plan to collaborate with investigators outside the Requester, the investigators at each external site must submit an independent DAR using the same project title and Research Use Statement, and if using the cloud, Cloud Computing Use Statement. New uses of these data outside those described in the DAR will require submission of a new DAR; modifications to the research project will require submission of an amendment to this application (e.g., adding or deleting Requester Collaborators from the Requester, adding datasets to an approved project). Access to the requested dataset(s) is granted for a period of one (1) year, with the option to renew access or close-out a project at the end of that year. Submitting Investigator(s), or their collaborators, who provided the data or samples used to generate controlled-access datasets subject to the NIH GDS Policy and who have Institutional Review Board (IRB) approval and who meet any other study specific terms of access, are exempt from the limitation on the scope of the research use as defined in the DAR.
New Technology When new or updated technology is introduced into a workplace, it will be the responsibility of the employer to provide appropriate and, if necessary, ongoing training to the employees directly affected. Such training will include any health and safety implications or information that will enable employees to operate the equipment without discomfort and will help maintain their general well-being.
Manufacturing Technology Transfer Except as provided in Section 4.3(f)(iii)(1) and Section 6.10, with respect to any Collaboration Product (or LGC Reserved Product, if applicable) for which LGC (or its Affiliate) performed CMC Development or CMC Manufacturing, if (a) Cue does not elect for LGC to perform CMC Step 2, CMC Step 3, or CMC Step 4 (or with respect to LGC Reserved Products, upon completion of CMC Step 1), or (b) upon failure of the Parties to reach agreement with respect to a Clinical Supply Agreement or a Commercial Supply Agreement or (c) [***] under this Agreement and does not cure such breach within [***] days (provided, that if such breach is not reasonably capable of cure within such [***] day period, then such cure period shall be automatically extended for an additional [***] day period as long as LGC continues to use diligent efforts to cure such breach in accordance with a reasonable cure plan and if such breach is not reasonably capable of cure within such combined [***] day period, then Cue shall reasonably consider consenting to any extension of such cure period as long as LGC continues to use diligent efforts to cure such breach in accordance with a reasonable cure plan), as applicable, then, in each case upon the written request of Cue, LGC shall use Commercially Reasonable Efforts to make a technology transfer to an Approved CMO the Manufacturing processes (including materials and such other information) but solely as is necessary to enable the Manufacture of such Collaboration Product (including the Collaboration Compound therein) (or LGC Reserved Product, including the LGC Reserved Compound therein, if applicable) by such Approved CMO to comparable biochemical structure, quality and purity as that Manufactured by LGC or its Affiliate or CMO, provided that neither Cue, LGC or any Third Party shall perform such a technology transfer to any CMO [***] without LGC’s consent, not to be unreasonably withheld, conditioned or delayed if LGC has approved the CMO to manufacture Collaboration Products (or LGC Reserved Products, if applicable). LGC shall conduct such technology transfer as soon as reasonably practicable after receiving such written notice, using good faith efforts to support supply needed to achieve timelines in the Cue Territory Development Plan (or Cue’s development plan for LGC Reserved Products, if applicable) or Cue Territory Commercialization Plan, as applicable. LGC shall conduct the first technology transfer for each Collaboration Product (or LGC Reserved Products, if applicable) [***] (provided that [***]) for a period of up to [***] months from the date Cue or its designee has provided notice it is ready to receive the technology transfer, provided, that such [***] month period [***]. After the expiration of the initial such [***] month period for a Collaboration Product (or LGC Reserved Products, if applicable), if required to complete the technology transfer to enable the Manufacture of such Collaboration Product (including the Collaboration Compound therein) (or LGC Reserved Product, including the LGC Reserved Compound therein, if applicable) by such Approved CMO to comparable biochemical structure, quality and purity as that Manufactured by LGC, LGC shall continue to provide support to Cue for up to an additional [***] period for up to [***] hours at the FTE Rate and thereafter at [***]. Thereafter, LGC will also provide [***] for such Collaboration Product (or LGC Reserved Products, if applicable). Neither Cue nor its Affiliates or Cue Collaborators shall reverse engineer any materials provided hereunder by LGC. Notwithstanding anything in this Agreement to the contrary, LGC’s CMC information may only be shared with an Approved CMO.
Licensed Technology (a) LICENSOR is not aware of any interference, infringement, misappropriation, or other conflict with any intellectual property rights of third parties, and LICENSOR has never received any charge, complaint, claim, demand, or notice alleging any such interference, infringement, misappropriation, or violation (including any claim that LICENSOR must license or refrain from using any intellectual property rights of any third party). To the knowledge of LICENSOR, no third party has interfered with, infringed upon, misappropriated, or otherwise come into conflict with any of the LICENSED TECHNOLOGY. (b) Exhibit A identifies each patent or registration which has been issued to LICENSOR with respect to any of the LICENSED TECHNOLOGY and identifies each pending patent application or application for registration which LICENSOR has made with respect to any of the LICENSED TECHNOLOGY. LICENSEE acknowledges that LICENSOR has previously made available to LICENSEE correct and complete copies of all such patents, registrations and applications (as amended to-date) in LICENSOR’s possession and has made available to LICENSEE correct and complete copies of all other written documentation in LICENSOR’s possession evidencing ownership and prosecution (if applicable) of each such item. (c) Exhibit A identifies each item of LICENSED TECHNOLOGY that is assigned to LICENSOR or that LICENSOR uses pursuant to license, sublicense, agreement, or permission. LICENSOR has made available to LICENSEE correct and complete copies of all such licenses, sublicenses, agreements, patent prosecution files and permissions (as amended to-date) in LICENSOR’s possession. With respect to each item of LICENSED TECHNOLOGY required to be identified in Exhibit A and to the knowledge of LICENSOR: (i) the license, sublicense, agreement, or permission covering the item is legal, valid, binding, enforceable, and in full force and effect; (ii) the license, sublicense, agreement, or permission will continue to be legal, valid, binding, enforceable, and in full force and effect on identical terms following the consummation of the transactions contemplated hereby; (iii) no Party to the license, sublicense, agreement, or permission is in breach or default, and no event has occurred which with notice or lapse of time would constitute a breach or default or permit termination, modification, or acceleration thereunder; (iv) no party to the license, sublicense, agreement, or permission has repudiated any provision thereof; (v) the underlying item of LICENSED TECHNOLOGY is not subject to any outstanding lien or encumbrance, injunction, judgment, order, decree, ruling, or charge; (vi) no action, suit, proceeding, hearing, investigation, charge, complaint, claim, or demand is pending or is threatened which challenges the legality, validity, or enforceability of the underlying item of LICENSED TECHNOLOGY; and (vii) except as provided in Exhibit A, LICENSOR has not granted any license or similar right to the LICENSED TECHNOLOGY within the GENERAL FIELD or PARTHENOGENESIS FIELD.
Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.