Design Memorandum Clause Samples

Design Memorandum. A design memorandum will be completed after the pre-design meeting to document the applicable design standards and develop concept level design solutions. Summary of the concept level designs for each site are provided below. A follow up meeting to finalize the design memorandum and incorporate the City’s comments will be held by staff from AECOM. Site 1: This site includes 175 linear feet of failing storm sewer and two structures. AECOM conducted pole camera inspections of these structures and sewers for the City in October 2022. A portion of the 30” diameter CMP sewer (OP27090 – 129.6 ft. long) is missing invert material that has eroded away indicating a loss of structural stability. This sewer and the upstream blind junction box (OP1759) are identified to be replaced. Relocating a segment of the sewer and abandon the existing in place is an option. If relocation is chosen, the junction box (OP1759) and existing RCP (OP1964 – 8.1 ft. long) will also be replaced. It is assumed the curb inlet will not be replaced to reduce disruptions to ▇▇▇▇▇▇▇ Ave. The grate inlet at the downstream end of this sewer (OP1757) is failing with structural damage and missing material, so it will be replaced. Finally, the downstream sewer that crosses 77th Terrace (OP31745 – 36.8 ft. long) is also identified for replacement within the existing trench. Site 2: This site includes 156 linear feet of failing CMP storm sewer (OP14286) and a curb inlet/junction box (OP8948). This sewer and structure were inspected by AECOM in December 2022. The inspection revealed severe deformation of the pipe which suggests loss of side support and a compromised soil/pipe composite structure. It should be noted that replacement in the same trench may not be feasible due to its proximity to the adjacent building and many trees. The downstream curb inlet/junction box measures 5 ft by 6 ft with multiple influent sewers and is also included as eligible for replacement. Site 3: This site includes replacement of a failing curb inlet (OP8948). The curb inlet will be reconstructed per City standard. The Project appears to be located entirely within public right-of-way so impacts to residential property should be minimal. The Project will likely include some curb replacement to tie-in the new curb inlet. An ADA replacement of the ramp is also assumed as a part of the sidewalk replacement. Site 4: GIS records indicate this dam spillway pipe is a 59” high by 81” wide elliptical CMP, approximately 115 ft. lon...
Design Memorandum. HDR will develop a design memorandum to document the design process, borrow area considerations, design and assumptions, and potential challenges during construction. The design memorandum will be approximately 5 to 10 pages and will be provided to GLO in draft and final PDF format. Task 1 Schedule HDR will endeavor to complete Task 1 within one hundred fifty (150) calendar days from the Notice to Proceed; however, completion of this task may be dependent on factors beyond HDR’s control including timeline dictated by ▇▇▇’s review time, and receipt of design survey from GPB. Task 1 Deliverables 1. Kickoff Meeting Notes (PDF) 2. Design Review Meeting Notes (up to two) (PDF) 3. 70%, 100%, and Final Proposal Documents 4. 70%, 100%, and Final Opinion of Probable Construction Cost 5. Draft and Final Design Memo (PDF) ▇▇. ▇▇▇▇▇▇ ▇▇▇▇ MCN10264138 May 14, 2024 REV 2 Page 7 of 14 Task 2: Construction Proposal Solicitation Assistance This task includes supporting GLO during the solicitation/award (for construction) phase of the project. GLO will distribute proposal packages (construction documents) to prospective contractors, coordinate with commercial plan rooms, and administer HUB subcontracting requirements for the project. In the event hard copies are required, HDR will produce and distribute hard copies of the proposal packages to prospective contractors for a set deposit amount. HDR’s services under this task include the following: 2.1 Pre-Proposal Conference in Galveston Participate in a pre-proposal conference with prospective construction contractors and GLO staff. HDR will prepare technical agenda for insertion within the overall meeting agenda to be prepared by GLO, facilitate technical discussion, and provide meeting notes to GLO. GLO will incorporate HDR’s meeting notes into overall meeting minutes.
Design Memorandum. Contractor will prepare a design memorandum to document design standards or exceptions for the project. A draft will be submitted with the preliminary layout and will be finalized with the final geometric layout. The design memorandum will meet the requirements in MnDOT’s TPDP Handbook. Up to three additional meetings are included for coordination with States GDSU.
Design Memorandum. WSB will prepare a design memorandum to document design standards or exceptions for the project. A draft will be submitted with the preliminary layout and will be finalized with the final geometric layout. The design memorandum will meet the requirements in MnDOT’s TPDP Handbook. Up to three additional meetings are included for coordination with MnDOT’s GDSU. Assistance will be needed from MnDOT regarding design ESALs.
Design Memorandum. HDR will develop a design memorandum to document the design process, borrow area considerations, design assumptions, and potential challenges during construction. The design memorandum will be approximately 5 to 10 pages and will be provided to GLO in draft and final PDF format. ▇▇. ▇▇▇▇▇▇ ▇▇▇▇ May 14, 2024 MCN10371716 REV 2 Task 1 Schedule HDR will endeavor to complete Task 1 within one hundred fifty (150) calendar days from the Notice to Proceed; however, completion of this task may be dependent on factors beyond HDR’s control including timeline dictated by ▇▇▇’s review time, and receipt of design survey from GPB. Task 1 Deliverables 1. Kickoff Meeting Notes (PDF) 2. Design Review Meeting Notes (up to two) (PDF) 3. 70%, 100%, and Final Proposal Documents 4. 70%, 100%, and Final Opinion of Probable Construction Cost 5. Draft and Final Design Memo (PDF) Task 2: Construction Proposal Solicitation Assistance This task includes supporting GLO during the solicitation/award (for construction) phase of the project. GLO will distribute proposal packages (construction documents) to prospective contractors, coordinate with commercial plan rooms, and administer HUB subcontracting requirements for the project. In the event hard copies are required, HDR will produce and distribute hard copies of the proposal packages to prospective contractors for a set deposit amount. HDR’s services under this task include the following:

Related to Design Memorandum

  • Information Memorandum (a) The factual information in the Information Memorandum (other than factual information relating to the Target and its Affiliates) was true, complete and accurate in all material respects as at the date it was provided or as at the date (if any) at which it is stated. (b) The financial projections in the Information Memorandum, have been prepared on the basis of recent historical information and on the basis of reasonable assumptions.

  • Offering Memorandum The Company, as promptly as possible, will furnish to each Initial Purchaser, without charge, such number of copies of the Preliminary Offering Memorandum, the Final Offering Memorandum and any amendments and supplements thereto and documents incorporated by reference therein as such Initial Purchaser may reasonably request.

  • Copies of the Offering Memorandum The Company agrees to furnish the Initial Purchasers, without charge, as many copies of the Pricing Disclosure Package and the Final Offering Memorandum and any amendments and supplements thereto as they shall reasonably request.

  • Preliminary Offering Memorandum, Time of Sale Information and Offering Memorandum The Preliminary Offering Memorandum, as of its date, did not, the Time of Sale Information, at the Time of Sale, did not, and at the Closing Date, will not, and the Offering Memorandum, in the form first used by the Initial Purchasers to confirm sales of the Securities and as of the Closing Date, will not, contain any untrue statement of a material fact or omit to state a material fact necessary in order to make the statements therein, in the light of the circumstances under which they were made, not misleading; provided that the Company and the Guarantors make no representation or warranty with respect to any statements or omissions made in reliance upon and in conformity with information relating to any Initial Purchaser furnished to the Company in writing by such Initial Purchaser through the Representative expressly for use in the Preliminary Offering Memorandum, the Time of Sale Information or the Offering Memorandum.

  • MEMORANDUM At the sale by Public Auction held this 08th day of February, 2023 of the property comprised in the foregoing particulars that is to say the rights, title, interest and benefits under the Sale and Purchase Agreement dated 07th day of May, 2003 entered into between KLH PROPERTIES SDN BHD (The Vendor) and ▇▇▇▇ ▇▇▇ ▇▇▇▇▇ & ▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ (The Purchasers) of the other part in relation to the property identified as Developer’s Parcel No. M-2F-11, Storey No. 2nd Floor, Building No. 4-Storey Shop Apartment, Low Cost Apartment, Melor, Taman Semenyih Ria and bearing postal address Unit No. 2F-21, Jalan Semenyih Ria 1, Taman ▇▇▇▇▇▇▇▇ ▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇ Darul Ehsan, the highest bidder stated below has been declared as the Purchaser of the said property for the sum of RM… who has paid to the Solicitors abovenamed the sum of RM by way of deposit and agrees to pay the balance of the purchase money and complete the purchase according to the conditions aforesaid. The said Auctioneer hereby confirms the said purchase and the Solicitors acknowledge receipt of the said deposit. PURCHASER’S PARTICULARS: - PURCHASE MONEY Taxes (if applicable) DEPOSIT MONEY : RM : RM : RM BALANCE DUE : RM ADDRESS ..................................................................... (Signature Of Purchaser/s Authorized Agent) ...................................................................... ..........................................................