Design of Water System Improvements. If the Developer elects to use the District’s engineer for water system design or is required to use the District’s Engineer due to the nature of the required improvements, the District’s engineer will prepare electronic drawings of the required extension and related improvements. The survey, if not provided by the Developer’s engineer, and if necessary, to design the project will be provided by the District Engineer. (LF)
Appears in 2 contracts
Sources: Developer Extension Agreement, Developer Extension Agreement