DESIGN POLICIES AND PROHIBITIONS. a. No channeling of floor, wall, or ceiling slabs. b. No “wet areas” over “dry areas” (i.e. no bathrooms over libraries), unless first obtaining written permission from the Corporation and its engineer. c. The architect for the Shareholder must assure the Cooperative, in writing, that any floor installations shall meet or exceed the New York City Code from a sound transmission and impact noise rating standpoint. d. Cement board type product (not moisture resistant “Greenboard”) must be used throughout all bathrooms indicating wall removal and replacement. e. All plumbing material must be inspected and approved by the Superintendent before being installed.
Appears in 3 contracts
Sources: Alteration Agreement, Alteration Agreement, Alteration Agreement