Design Requirements The DG Facility shall be installed in compliance with Wisconsin Administrative Code Chapter PSC 119.
Construction Requirements The Contractor shall coordinate with the Irrigation Company prior to beginning any construction that affects the operation or flow of the ditch. Ditch flows for ▇▇▇▇▇ Ditch occur yearlong. Generally, ditch flows for the Picketwire Ditch occur between April 1st – October 15th with additional occurrences in December and March for livestock watering. Working windows for demolition and construction shall be coordinated with the ▇▇▇▇▇ Ditch Company and Picketwire Ditch Company along with their inspectors. The Contractor shall cooperate with the Irrigation Company where Work is within the limits of the Irrigation Company’s property interest and shall perform the Work in such a manner and at such times as not to endanger or interfere with the continuous operation of the canal, property, and the flow of water at or in the vicinity of the Work. No Work shall be performed that interferes with the deeded schedule and volume of flow of the canal, including the delivery of water to its shareholders. The Contractor shall be responsible to the Irrigation Company for all damages for delays that may be sustained by the Irrigation Company caused by any interference that could have been avoided by proper handling of the Work. The Contractor shall obtain Irrigation Company’s approval, in writing, of construction for all of the elements of the Work within the Irrigation Company’s property interest. Copies of such approvals, notices, and correspondence shall be submitted to CDOT for Acceptance prior to beginning any Work on Irrigation Company property interest. The Contractor shall through the owner-controlled insurance program (OCIP) indemnify the Irrigation Company under its insurance coverage during the construction phase. Upon completion of the Work to be performed within Irrigation Company property interest, the Contractor shall promptly remove all tools, Equipment, Materials, and debris from Irrigation Company property placed there by the Contractor or the Contractor’s agents. The Contractor shall restore said property to the same state and condition as when the Contractor entered ▇▇▇▇▇▇▇, and shall leave said property in a clean and presentable condition satisfactory to the Irrigation Company. The Contractor shall provide As-Constructed Documents to the Irrigation Company within 10 Days of completion of Work within the Irrigation Company property interest.
Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;