Common use of Designated Project Clause in Contracts

Designated Project. The Designated Entity shall design, engineer, procure, install, construct, test, and commission the Designated Project as described in Appendix A of this Agreement and pursuant to this Appendix B. Any required Network Upgrade Facilities, as described in Appendix A, shall be identified and finalized in the Transmission Interconnection Procedures and addressed in a Transmission Project Interconnection Agreement and/or associated engineering, procurement, and construction agreements among the Designated Entity, the Connecting Transmission Owner(s) and/or Affected System Operator(s), if applicable. Based on a preliminary design, the components of the Designated Project will consist of the following major electrical and physical equipment: Upgrade existing control and protection systems, as applicable, to eliminate NERC P5 contingencies (P5 contingencies as defined in NERC TPL-001-5.1). Furnish and install the following major equipment, as applicable: • Required relays, panels, instrument transformers, control cables, controls, batteries, and hardware.1 Upgrade existing control and protection systems, as applicable, to eliminate NERC P5 contingencies (P5 contingencies as defined in NERC TPL-001-5.1). Furnish and install the following major equipment, as applicable: • Required relays, panels, instrument transformers, control cables, controls, batteries, control enclosure, and hardware.2 Install series reactors on three 138 kV lines (Line 462 and Line 463 to the Newbridge substation and Line 262 to the Valley Stream substation). LIPA’s East Garden City 138 kV substation is an existing 138 kV air-insulated substation (“AIS”) substation with a ten

Appears in 4 contracts

Sources: Service Agreement, Development Agreement, Development Agreement

Designated Project. The Designated Entity shall design, engineer, procure, install, construct, test, and commission the Designated Project as described in Appendix A of this Agreement and pursuant to this Appendix B. Any required Network Upgrade Facilities, as described in Appendix A, shall be identified and finalized in the Transmission Interconnection Procedures and addressed in a Transmission Project Interconnection Agreement and/or associated engineering, procurement, and construction agreements among the Designated Entity, the Connecting Transmission Owner(s) and/or Affected System Operator(s), if applicable. Based on a preliminary design, the components of the Designated Project will consist of the following major electrical and physical equipment: Upgrade existing control and protection systems, as applicable, to eliminate NERC P5 contingencies (P5 contingencies as defined in NERC TPL-001-5.1). Furnish and install the following major equipment, as applicable: • Required relays, panels, instrument transformers, control cables, controls, batteries, and hardware.1 Upgrade existing control and protection systems, as applicable, to eliminate NERC P5 contingencies (P5 contingencies as defined in NERC TPL-001-5.1). Furnish and install the following major equipment, as applicable: • Required relays, panels, instrument transformers, control cables, controls, batteries, control enclosure, and hardware.2 Install series reactors on three 138 kV lines (Line 462 and Line 463 to the Newbridge substation and Line 262 to the Valley Stream substation). LIPA’s East Garden City 138 kV substation is an existing 138 kV air-insulated substation (“AIS”) substation with a tenten (10) position ring bus configuration located in Town of Hempstead, Nassau County. 1 The Designated Entity may be able to use monitoring and reporting at a control center consistent with NERC TPL-001-5.1, Table 1 – Footnote 13. 2 See footnote 1, supra.

Appears in 1 contract

Sources: Development Agreement