Detector arrays Sample Clauses

Detector arrays. At the heart of the instrument are the detector arrays which are crucial to achieving the science goals of the mission. The detectors must operate with high efficiency over the spectral range of the instrument and meet the demanding sensitivity requirements. Kinetic inductance detectors are the most promising candidate for the choice of detector technology at the current time. They also have the potential to be mass-produced into the large-format arrays needed for low-background operation at these wavelengths. However, other technologies should not be precluded at this stage with the final choice being made after further assessment. R4.6.1: The choice of detector technology will be down-selected from an assessment of the available options at the time. To produce an instantaneous, fully (▇▇▇▇▇▇▇) sampled image of the sky requires that the detectors be spaced by 0.5Fλ in the re-imaged focal plane (where F is the focal ratio of the final optics). This will be assumed to be the preferred pixel spacing pending further discussion on the relative merits of using bare arrays, feedhorns or Winston cones to couple to the telescope beam.

Related to Detector arrays

  • Optional Xactimate Response Attachment (Part 2)

  • ENUMERATION OF CONTRACT DOCUMENTS § 9.1 This Agreement is comprised of the following documents: .1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor .2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds .3 AIA Document A201™–2017, General Conditions of the Contract for Construction

  • DESCRIPTION OF CONTRACT MODIFICATION This contract modification is made in accordance with Exhibit E-Revised-1, Contractual Terms and Conditions, Section 22. CHANGES, to be made part hereof for all pertinent purposes. The changes are as follows:

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)