Develop Base Maps Clause Samples

Develop Base Maps. The base maps to be used for the analysis and proposed schematic layout shall be developed by the Engineer from existing construction and right of way (ROW) plans as available. The Engineer shall re-establish the existing centerline horizontal alignments for all roadways, identify existing ROW, property owners and the approximate location of major utilities based on a ▇▇▇ in the preparation of base maps.
Develop Base Maps. The base maps to be used for the analysis and proposed schematic layout shall be developed by the Engineer from existing construction and ROW plans as available. The Engineer shall identify existing ROW, property owners and the approximate location of major utilities in the preparation of base maps. The Engineer shall obtain information on existing ROW and property information from as-built plans, ROW maps, and tax records and prepare a base map depicting the information. The Engineer shall obtain information on existing utilities from utility owners and shall identify and evaluate all known existing and proposed public and private utilities. The Engineer shall identify potential conflicts and attempt to minimize the potential adverse utility impacts in the preparation of the schematic design. The Engineer shall prepare a base map depicting the utility locations using data from topographic survey and ▇▇▇ (Levels A, B, C and D) performed by this contract, visual observations of utility paint marks from Texas 811 utility location services, as-built record plans from TxDOT, local city and counties local water and sewer utilities, franchise utilities and other public entities as applicable.
Develop Base Maps. ROW/Property and Utility Base Maps to be used for the Alternative analysis shall be developed by the Engineer from TxDOT, City and Utility Company GIS mapping. Re-establish the existing centerline horizontal alignments for all roadways, identify existing ROW and property owners from as- built plans, ROW maps, and tax records and the indicate the approximate location of major utilities based on a desktop survey and information from utility owners.
Develop Base Maps 

Related to Develop Base Maps

  • Contract Database Metadata Elements Title: Sayville Union Free School District and Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU), Local 424 (2011) Employer Name: Sayville Union Free School District Union: Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU) Local: 424 Effective Date: 07/01/2011 Expiration Date: 06/30/2015 PERB ID Number: 6131 Unit Size: 55 Number of Pages: 24 For additional research information and assistance, please visit the Research page of the Catherwood website - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/library/research/ For additional information on the ILR School - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/ 55 People TABLE OF CONTENTS ARTICLE Page XXII ANNUAL LEAVE DAYS 14 XXV BREAKS 18 XXVI CIVIL SERVICE LAW ARTICLE SECTION 75 18 XXVIII DURATION 19 XIV EMERGENCY WORK 11 XXI FOUL WEATHER CLOTHING 14 XI GRIEVANCE PROCEDURE 9 XVI HIGHER JOB CLASSIFICATION 12 XVIII HOLIDAYS 13 XV HOLIDAY AND WEEKEND BUILDING CHECKS 12 V INSURANCE 4 X LAYOFF, DISPLACEMENT AND RECALL ORDER 8 VII MANAGEMENT RIGHTS 7 XXVII MISCELLANEOUS 19 XVII NOTICES OF PROMOTIONS 13 XIII OVERTIME 10 II PAYROLL DEDUCTIONS 1 III PERSONNEL FILES 2 XXIV PHYSICAL EXAMINATIONS 18 XXIII RETIREMENT 16 IX STRIKES AND LOCKOUTS 7 XIX VACATIONS 13 XX VISITATION 14 IV WAGES 3 VI WORKERS' COMPENSATION 6 XII WORKWEEK 10 VIII WRITTEN BOARD POLICY 8 APPENDIX A 20 4/20/2016 AGREEMENT made and entered into this day of November 2013 between the SAYVILLE UNION FREE SCHOOL DISTRICT (hereinafter referred to as the “District”) and United Public Service Employees Union, ▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, N.Y. 11779 (hereinafter referred to as the “Union”).

  • PROJECT WORK PLAN The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from DFPS and the Grantee.

  • Development Schedule The Project shall substantially comply with the specific timetables and triggers for action set forth in Article 5 of this Agreement. The parties acknowledge that, as provided in G.S. 160A-400.25(b), the failure to meet a commencement or completion date shall not, in and of itself, constitute a material breach of this Agreement pursuant to G.S. 160A-400.27 but must be judged based upon the totality of the circumstances.

  • Commercialization Reports Throughout the term of this Agreement and during the Sell-Off Period, and within thirty (30) days of December 31st of each year, Company will deliver to University written reports of Company’s and Sublicensees’ efforts and plans to develop and commercialize the innovations covered by the Licensed Rights and to make and sell Licensed Products. Company will have no obligation to prepare commercialization reports in years where (a) Company delivers to University a written Sales Report with active sales, and (b) Company has fulfilled all Performance Milestones. In relation to each of the Performance Milestones each commercialization report will include sufficient information to demonstrate achievement of those Performance Milestones and will set out timeframes and plans for achieving those Performance Milestones which have not yet been met.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.