Common use of Developer Operating Requirements Clause in Contracts

Developer Operating Requirements. Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Developer must comply with Connecting Transmission Owner’s operating instructions and requirements which are set forth below. • This document describes the operating requirements between Con Edison’s System Operation Department and ▇▇▇▇▇▇ ▇▇▇▇▇ Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at ▇▇▇-▇▇▇-▇▇▇▇ or ▇▇▇-▇▇▇-▇▇▇▇ or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and ▇▇▇▇▇▇ ▇▇▇▇▇ includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • ▇▇▇▇▇▇ ▇▇▇▇▇ will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by ▇▇▇▇▇▇ ▇▇▇▇▇ to perform switching within the Plant. Updated lists shall be transmitted to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Department

Appears in 2 contracts

Sources: Interconnection Agreement, Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The post-transition period LVRT standard, as set forth in Appendix G, is applicable to the Developer’s Large Generating Facility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer must shall maintain the Large Generating Facility in service during a three-phase fault for nine (9) cycles. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with Connecting the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Owner’s operating instructions Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: ▇▇▇▇▇ ▇▇▇▇ Vice President, System and requirements which are set forth below. • This document describes Resource Planning ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ After commercial operation of the operating requirements between Con Edison’s Large Generating Facility New York Independent System Operation Department and Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇ Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at ▇▇▇-▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇ ▇▇▇ ▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ or New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇-▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇includes▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, but is not limited to Rulebook▇▇▇▇ ▇▇▇▇▇ ▇▇▇ ▇▇▇▇, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity ▇▇ ▇▇▇▇▇ Phone (▇▇▇) ▇▇▇-▇▇▇▇ NYISO: Before commercial operation of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison Large Generating Facility: New York Independent System Operator. • , Inc. Attn: ▇▇▇▇▇ ▇▇▇▇ Vice President, System and Resource Planning ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇ will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by ▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇ ▇▇▇ ▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Appendix G sets forth requirements and provisions specific to perform switching within the Planta wind generating plant. Updated lists shall be transmitted All other requirements of this LGIA continue to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders apply to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Departmentwind generating plant interconnections.

Appears in 2 contracts

Sources: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement

Developer Operating Requirements. Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Developer must comply with Connecting Transmission Owner’s operating instructions and requirements which are set forth below. • This document describes the operating requirements between Con Edison’s System Operation Department and ▇▇▇▇▇▇ ▇▇▇▇▇ Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison▇▇▇▇▇▇’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at ▇▇▇-▇▇▇-▇▇▇▇ or ▇▇▇-▇▇▇-▇▇▇▇ or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and ▇▇▇▇▇▇ ▇▇▇▇▇ includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • ▇▇▇▇▇▇ ▇▇▇▇▇ will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by ▇▇▇▇▇▇ ▇▇▇▇▇ to perform switching within the Plant. Updated lists shall be transmitted to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Department

Appears in 1 contract

Sources: Interconnection Agreement

Developer Operating Requirements. Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Developer must comply with Connecting Transmission Owner’s operating instructions and requirements which are set forth below. • This document describes the operating requirements between Con Edison’s System Operation Department and ▇▇▇▇▇▇ ▇▇▇▇▇ Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at ▇▇▇-▇▇▇-▇▇▇▇ or ▇▇▇-▇▇▇-▇▇▇▇ or such other telephone line as the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional System Operation procedures and policies govern the operating relationship between Con Edison and ▇▇▇▇▇▇ ▇▇▇▇▇ includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • ▇▇▇▇▇▇ ▇▇▇▇▇ will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by ▇▇▇▇▇▇ ▇▇▇▇▇ to perform switching within the Plant. Updated lists shall be transmitted to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Department.

Appears in 1 contract

Sources: Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The post-transition period LVRT standard, as set forth in Appendix G, is applicable to the Developer’s Large Generating Facility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer must shall maintain the Large Generating Facility in service during a three-phase fault for nine (9) cycles. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with Connecting the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Owner’s operating instructions Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-5224 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: ▇▇▇▇▇ ▇▇▇▇ Vice President, System and requirements which are set forth below. • This document describes Resource Planning ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ After commercial operation of the operating requirements between Con Edison’s Large Generating Facility New York Independent System Operation Department and Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇ Floor New York, NY 10016 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: Accounts Payable ▇▇ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ Generation Plant ▇▇▇ Pittsburgh, PA 15201 Phone (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at ▇▇▇-) ▇▇▇-▇▇▇▇ or ▇▇▇-▇▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇.▇▇▇ NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: ▇▇▇▇▇ ▇▇▇▇ Vice President, System and Resource Planning ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ or such other telephone line as Fax: (▇▇▇) ▇▇▇-▇▇▇▇ After commercial operation of the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional Large Generating Facility New York Independent System Operation procedures and policies govern the operating relationship between Con Edison and Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇ includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • ▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇ will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by ▇▇, ▇▇▇▇ Floor New York, NY 10016 Phone: (▇▇) ▇▇▇-▇▇▇▇ Appendix G sets forth requirements and provisions specific to perform switching within the Planta wind generating plant. Updated lists shall be transmitted All other requirements of this LGIA continue to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders apply to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Departmentwind generating plant interconnections.

Appears in 1 contract

Sources: Standard Large Generator Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The post-transition period LVRT standard, as set forth in Appendix G, is applicable to the Developer’s Large Generating Facility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer must shall maintain the Large Generating Facility in service during a three-phase fault for nine (9) cycles. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with Connecting the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Owner’s operating instructions Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: ▇▇▇▇▇ ▇▇▇▇ Vice President, System and requirements which are set forth below. • This document describes Resource Planning ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ After commercial operation of the operating requirements between Con Edison’s Large Generating Facility New York Independent System Operation Department and Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇ ▇▇▇ ▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: Accounts Payable ▇▇ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ Generation Plant (the “Plant”) connected to the Con Edison electrical system at Goethals 345KV Substation as illustrated on Goethals 60 cycles operating diagram 70. • Operating one-line diagram 9C shows the operating jurisdictional boundaries of Con Edison’s System Operation Department. • The Con Edison District Operator (“District Operator”) or Con Edison System Operator (“System Operator”) shall direct all operations on equipment within Con Edison’s jurisdictional boundaries in accordance with System Operation’s Department Procedures/Con Edison specifications and the Con Edison General Instructions Governing Work on System Electrical Equipment (the “Rulebook”). • Con Edison’s District Operator and System Operator each shall have a dedicated direct line (two direct lines in total from the ECC) to the Control Room Operator and if such direct line is not available for any reason, the Control Room Operator can be reached via outside telephone line at ▇▇▇ ▇▇▇-▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone (▇▇▇) ▇▇▇-▇▇▇▇ or ▇▇▇-▇▇▇▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇.▇▇▇ NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: ▇▇▇▇▇ ▇▇▇▇ Vice President, System and Resource Planning ▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Rensselaer, NY 12144 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ or such other telephone line as Fax: (▇▇▇) ▇▇▇-▇▇▇▇ After commercial operation of the Plant shall provide. The Plant shall notify the District Operator of any change in their control room outside telephone number. • Additional Large Generating Facility New York Independent System Operation procedures and policies govern the operating relationship between Con Edison and Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services ▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇▇ Wind LLC c/o EverPower Wind Holdings Inc. Attn: ▇▇▇▇▇▇ ▇▇▇▇▇ includes, but is not limited to Rulebook, and System Operation Department’s Procedures. • In order to not exceed the nominal designed capacity of the Goethals Substation equipment in the case of a trip out of Con Edison feeders exiting Goethals Substation, the Plant shall reduce its MW output upon notification from the Con Edison District Operator or Con Edison System Operator. • ▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇ ▇▇▇▇▇ will operate the Plant and provide advance notification to the Con Edison Chief District Operator in the event that the Plant changes ownership or will be operated by a different entity. • The Plant shall respond to emergencies as directed by the Con Edison System Operator, and/or Con Edison District Operator. • The Plant shall provide to the Con Edison Chief System Operator, the generator’s MVAR capability curves and the Generator Step Up transformer’s No Load Tap Changer ranges and settings after each update. • The Plant shall maintain an updated list of personnel authorized by ▇▇▇▇▇▇ ▇▇▇▇, ▇▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Appendix G sets forth requirements and provisions specific to perform switching within the Planta wind generating plant. Updated lists shall be transmitted All other requirements of this LGIA continue to the Con Edison Chief District Operator after each update, and as requested by Con Edison System Operations, and will be utilized when issuing operating orders The Plant shall ensure that a qualified control room operator will always be available at the Plant control room. • The Con Edison District Operator, when directed by the Con Edison System Operator, shall issue all orders apply to an authorized Plant Operator who will prepare an operating order and dispatch qualified operators to carry out the order in accordance with Section 5 of the Rulebook. • All changes in the operating status of equipment within the Con Edison jurisdictional boundaries shall be under the sole authority of the Con Edison System Operator, as stated in Section 2 of the Rulebook and in System Operation’s Departmentwind generating plant interconnections.

Appears in 1 contract

Sources: Standard Large Generator Interconnection Agreement