The 'Development and Manufacturing Site' clause defines the specific location(s) where the development and manufacturing activities under the agreement will take place. It typically identifies the approved facilities or addresses where the contracted work, such as product development, testing, or production, must occur. This clause ensures that all parties are aware of and agree to the designated sites, which can be important for regulatory compliance, quality control, and logistical planning. Its core function is to provide clarity and control over where critical activities are performed, thereby reducing risks related to unauthorized or substandard manufacturing.
Development and Manufacturing Site. Unless otherwise agreed by Client, all Services shall be performed by SBL at the Facility.
Development and Manufacturing Site. Except as is provided in Section 4.4 or otherwise agreed by Client, all Services shall be performed by * at the Facility.
Development and Manufacturing Site. Unless otherwise agreed by Client, all Services shall be performed at the Facility.

Related to Development and Manufacturing Site

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection ▇▇▇▇▇; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Development and Commercialization Subject to Sections 4.6 and 4.7, Fibrocell shall be solely responsible for the development and Commercialization of Fibrocell Products and Improved Products. Fibrocell shall be responsible for all costs incurred in connection with the Fibroblast Program except that Intrexon shall be responsible for the following: (a) costs of establishing manufacturing capabilities and facilities in connection with Intrexon’s manufacturing obligation under Section 4.6 (provided, however, that Intrexon may include an allocable portion of such costs, through depreciation and amortization, when calculating the Fully Loaded Cost of manufacturing a Fibrocell Product, to the extent such allocation, depreciation, and amortization is permitted by US GAAP, it being recognized that the majority of non-facilities scale-up costs cannot be capitalized and amortized under US GAAP); (b) costs of basic research with respect to the Intrexon Channel Technology and Intrexon Materials (i.e., platform improvements) but, for clarity, excluding research described in Section 4.7 or research requested by the JSC for the development of a Fibrocell Product or an Improved Product (which research costs shall be reimbursed by Fibrocell); (c) [*****]; and (d) costs of filing, prosecution and maintenance of Intrexon Patents. The costs encompassed within subsection (a) above shall include the scale-up of Intrexon Materials and related active pharmaceutical ingredients for clinical trials and Commercialization of Fibrocell Products undertaken pursuant to Section 4.6, which shall be at Intrexon’s cost whether it elects to conduct such efforts internally or through Third Party contractors retained by either Intrexon or Fibrocell (with Intrexon’s consent).

  • Manufacturing Services Jabil will manufacture the Product in accordance with the Specifications and any applicable Build Schedules. Jabil will reply to each proposed Build Schedule that is submitted in accordance with the terms of this Agreement by notifying Company of its acceptance or rejection within three (3) business days of receipt of any proposed Build Schedule. In the event of Jabil’s rejection of a proposed Build Schedule, Jabil’s notice of rejection will specify the basis for such rejection. When requested by Company, and subject to appropriate fee and cost adjustments, Jabil will provide Additional Services for existing or future Product manufactured by Jabil. Company shall be solely responsible for the sufficiency and adequacy of the Specifications [***].

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • Manufacturing (a) The Supplier shall without limitation be responsible, at no additional cost to the Purchaser, for: sourcing and procuring all raw materials for the Products; obtaining all necessary approvals, permits and licenses for the manufacturing of the Products; providing sufficient qualified staff and workers to perform the obligations under this Purchase Agreement; implementing and maintaining effective inventory and production control procedures with respect to the Products; and handling other matters as reasonably requested by the Purchaser from time to time. (b) The Supplier shall not change any process, material, component, packaging or manufacturing location without the Purchaser’s express prior written approval.