Safety Objectives 55.1 The Parties recognise the potentially hazardous nature of the construction industry. To this end, the Parties to the Agreement are committed to continuous improvement in occupational health and safety standards through the implementation of an organisational framework which involves all Parties in protecting Employees’ health and safety. 55.2 In meeting these objectives, the Parties have agreed to consider a broad agenda through the consultative processes established by this Agreement. Such an agenda will include: (a) measures designed to include the safe operation of plant and equipment; (b) training issues including specific hazards, health and safety systems, and site induction; (c) management of occupational health and safety through a comprehensive approach which aims to control hazards at their source, reduce the incidence and costs of occupational injuries and illnesses; and (d) risk of fatigue (see clauses 38.5 and 38.6). 55.3 The Employer will comply with all relevant work health and safety legislation, including the OHS Act, workers compensation legislation, regulations, codes of practice and relevant and appropriate Australian and Industry Standards produced or recognised by WorkSafe Victoria.
Program Objectives Implement a rigorous constructability program following The University of Texas System, Office of Capital Projects Constructability Manual. Identify and document Project cost and schedule savings (targeted costs are 5% of construction costs). Clarification of Project goals, objectives.
Development and Commercialization Subject to Sections 4.6 and 4.7, Fibrocell shall be solely responsible for the development and Commercialization of Fibrocell Products and Improved Products. Fibrocell shall be responsible for all costs incurred in connection with the Fibroblast Program except that Intrexon shall be responsible for the following: (a) costs of establishing manufacturing capabilities and facilities in connection with Intrexon’s manufacturing obligation under Section 4.6 (provided, however, that Intrexon may include an allocable portion of such costs, through depreciation and amortization, when calculating the Fully Loaded Cost of manufacturing a Fibrocell Product, to the extent such allocation, depreciation, and amortization is permitted by US GAAP, it being recognized that the majority of non-facilities scale-up costs cannot be capitalized and amortized under US GAAP); (b) costs of basic research with respect to the Intrexon Channel Technology and Intrexon Materials (i.e., platform improvements) but, for clarity, excluding research described in Section 4.7 or research requested by the JSC for the development of a Fibrocell Product or an Improved Product (which research costs shall be reimbursed by Fibrocell); (c) [*****]; and (d) costs of filing, prosecution and maintenance of Intrexon Patents. The costs encompassed within subsection (a) above shall include the scale-up of Intrexon Materials and related active pharmaceutical ingredients for clinical trials and Commercialization of Fibrocell Products undertaken pursuant to Section 4.6, which shall be at Intrexon’s cost whether it elects to conduct such efforts internally or through Third Party contractors retained by either Intrexon or Fibrocell (with Intrexon’s consent).
Development Standards For any structure built on the Property following the Effective Date, it shall comply with the requirements contained in Exhibit B, “Building Materials,” attached hereto and incorporated herein. The Parties agree and acknowledge that the provisions of this Paragraph shall apply to any structure constructed subsequent to the execution of this Agreement. Nothing in this Agreement shall be deemed to modify or otherwise amend any zoning regulation duly adopted by the Town, previously or in the future.
Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.