Common use of Development of Plans Clause in Contracts

Development of Plans. Landlord has developed and Tenant hereby approves the detailed base building description (the "Preliminary Design Concept") set forth or referenced in Exhibit B hereto for the Building and Premises describing in general terms the principal items of work and materials to be performed and supplied by Landlord. Attached hereto as Exhibit B-1 is a schedule (the "Progress Schedule") setting forth items and completion dates for various aspects of the development and construction of the Building. Landlord and Tenant agree to cooperate and use reasonable efforts to complete the items in the Progress Schedule by the respective completion dates so that the Substantial Completion Date occurs on or before the Scheduled Substantial Completion Date. In connection therewith, Landlord shall cause Landlord's Architect to prepare schematic architectural plans, structural and engineering plans, elevations and building sections, and site plans for the Building based upon the Preliminary Design Concept ("Schematic Design Documents"), which shall mean a conceptual design of the Base Building Improvements illustrating the scale and relationship of the components of the Base Building Improvements. The Schematic Design Documents shall show walkways and plazas for the Building and Lot, major landscape features, hardscaping, scale and relationship of other major components of the Building and Lot, pedestrian and vehicular (including service) access and flow through the Lot, lighting, survey information such as existing elevations, benchmarks and utilities, and any known construction limits. The Schematic Design Documents shall also include models, color renderings and outline specifications indicating all basic materials and systems of the proposed Base Building Improvements. The Schematic Design Documents and all subsequent Design Documents shall be prepared and distributed by Landlord's Architect in both hard copy and electronic format. During the development of the Schematic Design Documents, Landlord and Tenant shall meet with representatives of the CDD (as defined in Section 3.1.4 hereof) and their respective consultants to review and refine the design of the Building and the Lot. Thereafter, Landlord shall seek approval of the Schematic Design Documents by the Planning Board (as defined in Section 3.1.4 hereof), and Tenant shall cooperate with Landlord in connection therewith. If despite the good faith efforts of Landlord and Tenant the Planning Board rejects the design reflected in the Schematic Design Documents or insists upon major changes to the Schematic Design Documents which are unacceptable to Landlord due to anticipated material increases in the cost of Landlord's Work or a material delay in the commencement or completion of Landlord's Work and if as a result thereof Landlord is unable to obtain approval of the Schematic Design Documents by the Planning Board by the date set forth in the Progress Schedule, as the same may be changed by any Tenant Delay, Landlord may terminate this Lease upon thirty (30) days prior written notice unless within such thirty-day period Tenant agrees to pay to Landlord the increases in the cost of Landlord's Work resulting from such changes and delays. If Tenant does not agree within such thirty-day period to pay to Landlord the increases in the cost of Landlord's Work resulting from such changes and delays and Planning Board approval of the Schematic Design Documents is not obtained by the end of such thirty-day period, this Lease shall thereupon terminate. Planning Board approval of the Schematic Design Documents shall be a Subsequent Approval (as defined in Section 3.1.4 hereof). Landlord and Tenant agree to cooperate in connection with any conditions imposed by the Planning Board in connection with the Planning Board's approval of the Schematic Design Documents, such as further review of the Design Documents by the CDD. At such time as the Schematic Design Documents have been approved by Landlord and by the Planning Board, Landlord shall cause Landlord's Architect to prepare further details and development of the Schematic Design Documents (the "Design Development Documents") for the Building and the Base Building Improvements, which shall mean plans, sections and elevations, typical construction details, and equipment layouts showing the scope, relationships, forms, size and appearance of the Base Building Improvements. Design Development Documents shall include architectural, mechanical and electrical drawings and details of the Building, exterior materials to be incorporated in the Building, walkways and other plaza areas on the Lot, a site and landscape plan for the Lot showing all site development and landscape detail for lighting, paving, landscaping, utilities, grading, drainage, access and service areas. The Design Development Documents shall also include outline specifications indicating all basic materials and mechanical and electrical systems of the proposed Base Building Improvements. As with the Schematic Development Documents, the Design Development Documents shall be prepared and distributed in both hard copy and electronic format. At such time as the Design Development Documents have been approved by Landlord, Landlord shall cause Landlord's Architect to prepare detailed construction drawings and specifications ("Final Design Documents") which shall set forth in detail the requirements for construction of Landlord's Work (including all architectural, mechanical, electrical and structural drawings and detailed specifications), shall be fully coordinated with one another and with field conditions as they exist on the Lot, and shall show all work necessary to complete Landlord's

Appears in 2 contracts

Sources: Lease (Vertex Pharmaceuticals Inc / Ma), Lease (BioMed Realty Trust Inc)