Dewatering Tunnels/Temporary Heat/Protection Clause Samples

The 'Dewatering Tunnels/Temporary Heat/Protection' clause outlines the contractor's responsibilities for managing water removal, providing temporary heating, and ensuring adequate protection during tunnel construction. This typically involves installing pumps or drainage systems to keep tunnels dry, supplying temporary heating equipment to maintain safe working conditions, and implementing protective measures such as barriers or coverings to safeguard the work and personnel. The core function of this clause is to ensure that construction activities proceed safely and efficiently despite environmental challenges, thereby minimizing delays and protecting both workers and the integrity of the project.
Dewatering Tunnels/Temporary Heat/Protection. Dewatering of tunnels and caissons and providing temporary heat and protection shall be worked in accordance with the work shift and overtime provisions heretofore established, except that time worked on holidays when no other activities are in progress will be compensated for at the overtime rate of one and one-half (1-1/2) times the basic rate of wages.

Related to Dewatering Tunnels/Temporary Heat/Protection

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Waste Disposal Tenant shall store its waste either inside the Premises or within outside trash enclosures that are fully fenced and screened in compliance with all Private Restrictions, and designed for such purpose. All entrances to such outside trash enclosures shall be kept closed, and waste shall be stored in such manner as not to be visible from the exterior of such outside enclosures. Tenant shall cause all of its waste to be regularly removed from the Premises at Tenant’s sole cost. Tenant shall keep all fire corridors and mechanical equipment rooms in the Premises free and clear of all obstructions at all times.

  • Musculoskeletal Injury Prevention and Control The hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Compliance with Consensus Policies and Temporary Policies Registry Operator shall comply with and implement all Consensus Policies and Temporary Policies found at <▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇▇/general/consensus-­‐policies.htm>, as of the Effective Date and as may in the future be developed and adopted in accordance with the ICANN Bylaws, provided such future Consensus Polices and Temporary Policies are adopted in accordance with the procedure and relate to those topics and subject to those limitations set forth in Specification 1 attached hereto (“Specification 1”).