Drainage Improvements. 1. The Developer shall submit to the Township evidence of all necessary permits, approvals and licenses required under federal, state, county or local statute, ordinance or regulation for installation of the storm sewers, sanitary sewers (if applicable) and surface water drainage facilities (“Drainage Improvements”), prior to commencing construction of said Drainage Improvements. 2. The Developer shall cause all of the Drainage Improvements to be constructed and installed in compliance with: i. The ordinance and regulation of the Township, including, without limitation, the Stormwater Management Ordinance; ii. The statutes and regulation of the Commonwealth of Pennsylvania, including the DEP, including, without limitation, the Stormwater Management Act the ▇▇▇▇▇▇ County Code; and iii. The Plans as approved by the Township. 3. Upon completion of the Drainage Improvements and certification thereof by the Township Engineer, and posting of the Maintenance Bond, and then the Drainage Improvement shall be taken over by either the Developer or Landower(s). 4. Any change in location, slope, size, material, connection or other factors relating to the Drainage Improvements which will cause said Drainage Improvements to differ from the Plains approved by the Township, shall only be made after said changes have been reviewed by the Township Engineer, and its consent, in writing, shall have been received by this Developer. 5. Construction of the Drainage Improvements shall be under the supervision and subject to the review of the inspectors of the Township assigned to such inspection duties.
Appears in 1 contract
Sources: Developer's Agreement
Drainage Improvements. 1. The Developer (a) Drainage improvements for the Subdivision shall submit to the Township evidence of all necessary permits, approvals and licenses required under federal, state, county or local statute, ordinance or regulation for installation of the storm sewers, sanitary sewers (if applicable) and surface water drainage facilities (“Drainage Improvements”), prior to commencing construction of said Drainage Improvements.
2. The Developer shall cause all of the Drainage Improvements to be constructed by Subdivider and, at the minimum, in accordance with plans and installed in compliance with:
i. The ordinance and regulation of the Township, including, without limitation, the Stormwater Management Ordinance;
ii. The statutes and regulation of the Commonwealth of Pennsylvania, including the DEP, including, without limitation, the Stormwater Management Act the ▇▇▇▇▇▇ County Code; and
iii. The Plans as specifications approved by the TownshipTown and in accordance with the minimum requirements for storm drainage facilities as have been established by the sanitation district serving the property. All storm drainage facilities shall be so designed and constructed by the Subdivider as to protect downstream and adjacent properties against injury and adequately serve the Subdivision. No overlot grading shall be initiated by Subdivider until the Town issues written approval of utility plans.
3(b) Drainage improvements shall be completed and granted conditional acceptance by the Town prior to the issuance of more than five (5) building permits. Upon completion Completion of the improvements shall include the certification by a licensed professional engineer that the drainage facilities which serve the development have been constructed in conformance with said approved plans. Any deviation from the approved plans shall be the responsibility of the Subdivider to correct. Said certification shall be submitted to the Town at least two (2) weeks prior to the date of issuance for any subsequent building permit.
(c) Drainage Improvements and certification thereof improvements for each lot shall be constructed by the Township EngineerSubdivider, and posting at the minimum, in accordance with plans approved at the time of Plat approval. Said plans shall conform to the Town's then existing flood plain regulations. Subdivider shall furnish copies of approved plans to subsequent purchasers (other than homeowners) of lots. Any changes from the approved plans with respect to grade elevation or storm drainage facility configuration that occur as a result of the Maintenance Bondconstruction of houses and or other development of lots, whether by the Subdivider or other parties, shall require the approval of the Town. The Town may withhold the issuance of building permits and then certificates of occupancy until the Drainage Improvement shall be taken over by either Town has approved such changes as being acceptable for the Developer or Landower(s)safe and efficient delivery of storm drainage water.
4. Any change in location, slope, size, material, connection or other factors relating to the Drainage Improvements which will cause said Drainage Improvements to differ from the Plains approved by the Township, (d) The Subdivider shall only be made after said changes have been reviewed by the Township Engineer, and its consent, in writing, shall have been received by this Developerpay any storm drainage basin fees as applicable.
5. Construction of the Drainage Improvements shall be under the supervision and subject to the review of the inspectors of the Township assigned to such inspection duties.
Appears in 1 contract
Sources: Subdivision Agreement