Common use of Drawing Review Clause in Contracts

Drawing Review. A. Drawings and documents submitted for PURCHASER’S review will be returned to SOIL CONTRACTOR with two (2) stickers on each document. One (1) sticker will indicate the equipment tag number and PURCHASER’S SOIL CONTRACTOR print Jog number. The second sticker will indicate, by ▇▇▇▇, one (1) of the following review codes: Code 1 Work may proceed. Code 2 Revise and resubmit. Work may proceed subject to incorporation of changes indicated Code 2b Revise. Incorporate changes as indicated. Resubmittal not required. Work may proceed. Code 3 Revise and resubmit. Work may not proceed. Code 4 Review not required. Work may proceed. Although work may proceed on receipt of a drawing with a Code 2 notation, SOIL CONTRACTOR must resolve the comments indicated, resubmit and obtain a Code 1 notation. Any drawing or document receiving a review Code 2 or 3 must be resubmitted until it achieves either a Code 1 or 4 review status. Final invoice will not be processed until all drawings and documentation requirements are fulfilled. B. All SOIL CONTRACTOR data will be logged in and assigned a unique log number by the PURCHASER, Subsequent submittals of the same documents will receive the same log number, which was assigned to the initial submittal, except that the submittal number will be changed. For example, the initial drawing received would be assigned: On subsequent submittals, only the submittal will change. If the SOIL CONTRACTOR incorporates this data into a manual, the data becomes part of the manual and the manual is togged in and assigned its own log number. Code 1 or 4 approval of a manual does not eliminate the requirements for all individually submitted documents to receive a Code 1 or 4 review code. Status and Log Sticker Sample ¨ 1. Work may proceed Date Received: ¨ 2. Revise & Resubmit. Work may proceed. Subject to incorporation of Changes as indicated. IMPORTANT: Permission to proceed does not constitute acceptance or approval of design details, calculations, analysis, test methods or materials developed or selected by the supplier and does not relieve supplier from full compliance with contractual obligations. DWG. Status ¨ 2b. Revise, Incorporate changes as indicated. Resubmittal not required. Work may proceed. Signed ¨ 3. Revise & Resubmit. Work may not proceed. Date ¨ 4. Review not required. Work may proceed BECHTEL Job & V. P. NO Equipment # 1. Reason for resubmittal ¨ Bechtel Design ¨ Supplier Design ¨ Supplier Correction ¨ Client Required ¨ Not Necessary C. Drawings or data returned to SOIL CONTRACTOR for revision must be resubmitted within ten (10) working days after receipt. Resubmittals shall retain original number and be clearly marked with revision triangles enclosing the revision number. The revision triangles shall remain as a permanent part of the document. Correspondence accompanying revised drawings and data must show the SOIL CONTRACTOR print log number. SOIL CONTRACTOR shall evaluate PURCHASER comments and incorporate them in a technically sound manner without affecting the progress of the Work. SOIL CONTRACTOR shall request clarification or suggest alternatives where questions of technical feasibility arise.

Appears in 1 contract

Sources: Soil Improvement Contract (Cheniere Energy Inc)

Drawing Review. A. Drawings and documents submitted for PURCHASER’S review will be returned to SOIL TANK CONTRACTOR with two (2) stickers on each document. One (1) sticker will indicate the equipment tag number and PURCHASER’S SOIL TANK CONTRACTOR print Jog log number. The second sticker will indicate, by ▇▇▇▇, one (1) of the following review codes: : Code 1 Work may proceed. Code 2 Revise and resubmit. Work may proceed subject to incorporation of changes indicated Code 2b Revise. Incorporate changes as indicated. Resubmittal not required. Work may proceed. Code 3 Revise and resubmit. Work may not proceed. Code 4 Review not required. Work may proceed. Although work may proceed on receipt of a drawing with a Code 2 notation, SOIL TANK CONTRACTOR must resolve the comments indicated, resubmit and obtain a Code 1 notation. Any drawing or document receiving a review Code 2 or 3 must be resubmitted until it achieves either a Code 1 or 4 review status. Final invoice will not be processed until all drawings and documentation requirements are fulfilled. B. All SOIL TANK CONTRACTOR data will be logged in and assigned a unique log number by the PURCHASER, . Subsequent submittals of the same documents will receive the same log number, which was assigned to the initial submittal, except that the submittal number will be changed. For example, the initial drawing received would be assigned: On subsequent submittals, only the submittal will change. If the SOIL TANK CONTRACTOR incorporates this data into a manual, the data becomes part of the manual and the manual is togged logged in and assigned its own log number. Code 1 or 4 approval of a manual does not eliminate the requirements for all individually submitted documents to receive a Code 1 or 4 review code. Status and Log Sticker Sample ¨ (1) Work May Proceed. Work may proceed Date ReceivedDATE RECEIVED: ¨ 2. Revise & Resubmit. Work may proceed. Subject to incorporation of Changes as indicated. IMPORTANT: Permission to proceed does not constitute acceptance or approval of design details, calculations, analysis, analyses. test methods or materials developed or selected by the supplier and does not relieve supplier from full compliance with contractual obligations. DWG. Status STATUS SIGNED DATE BECHTEL ¨ (2) Revise & Resubmit. Work May Proceed. Subject to Incorporation of Changes indicated. ¨ (2b) Revise. Revise, Incorporate changes Changes as indicated. Resubmittal not requiredRequired. Work may proceedMay Proceed. Signed ¨ (3. ) Revise & Resubmit. Work may not proceed. Date ¨ 4. Review not required. Work may proceed BECHTEL Job & V. P. NO Equipment # 1. Reason for resubmittal ¨ Bechtel Design ¨ Supplier Design ¨ Supplier Correction ¨ Client Required ¨ May Not Necessary C. Drawings or data returned to SOIL CONTRACTOR for revision must be resubmitted within ten (10) working days after receipt. Resubmittals shall retain original number and be clearly marked with revision triangles enclosing the revision number. The revision triangles shall remain as a permanent part of the document. Correspondence accompanying revised drawings and data must show the SOIL CONTRACTOR print log number. SOIL CONTRACTOR shall evaluate PURCHASER comments and incorporate them in a technically sound manner without affecting the progress of the Work. SOIL CONTRACTOR shall request clarification or suggest alternatives where questions of technical feasibility ariseProceed.

Appears in 1 contract

Sources: Epc LNG Tank Contract (Cheniere Energy Inc)