Dumpsites Clause Samples

Dumpsites. CONTRACTOR shall establish and maintain a list of assigned 8 dumpsite locations for every route. Dumpsite locations shall be within the CITY 9 right-of-way and located within a reasonable distance of every route served. To 10 minimize the impact on CITY streets, CONTRACTOR may use the same 11 dumpsite for multiple routes. CONTRACTOR shall obtain the approval of the 12 City Representative for each dumpsite location, and shall use the approved 13 dumpsite whenever the associated route(s) are swept. CONTRACTOR shall 14 clearly post signs at all dumpsites indicating "Residential Street Sweeping Debris 15 Only” to prevent illegal dumping. CONTRACTOR shall utilize Roll-Off Containers 16 at the dumpsites for the collection of Sweep Waste. To the extent feasible the 17 Roll-Off Containers shall be water-tight. All Sweep Waste left at the dumpsite 18 shall be collected and the area shall be swept by CONTRACTOR prior to the end 19 of the Work Day. CONTRACTOR shall use any measures necessary to ensure 20 that no runoff from the debris ends up in the storm water system in accordance 21 with BMP Guidelines for Non-Point Source Pollutants in the publication entitled 22 Storm Water Best Management Practices Handbook for Industrial Commercial.
Dumpsites. The Contractor shall use only debris dumpsite(s) designated by the Department of Public Works Program Manager. The dumpsite operator shall direct all dumping operations. The Contractor shall cooperate with the dumpsite operator to facilitate effective dumping operations. The Government makes no representations regarding the turn-around time at the dumpsites. Contractors are to abide by the working schedule of the dumpsite Operator. Only debris delivered to the DPW-approved dumpsite will be considered for compensation through this contract.
Dumpsites. 5.1 The Contractor shall use only debris dumpsites designated in Section 2.2, unless otherwise approved by the COR. The Contractor shall haul non-burnable debris to the site designated for non-burnable debris and burnable debris to the burn sire designated. 5.2 The dumpsite operator shall direct all dumping operations. The Contractor shall cooperate with the dumpsite operator to facilitate effective dumping operations. 5.3 The Government makes no representations regarding the turn-around time at the dumpsites.
Dumpsites. CONTRACTOR shall establish and maintain a list 19 of assigned dumpsite locations for every route. Dumpsite locations shall be within the 20 CITY right-of-way and located within a reasonable distance of every route served. To 21 minimize the impact on CITY streets, CONTRACTOR may use the same dumpsite for 22 multiple routes. CONTRACTOR shall obtain the approval of the City Representative for 23 each dumpsite location, and shall use the approved dumpsite whenever the associated 24 route(s) are swept. CONTRACTOR shall clearly post signs at all dumpsites indicating 25 "Residential Street Sweeping Debris Only” to prevent illegal dumping. CONTRACTOR 26 shall utilize Roll-Off Containers at the dumpsites for the collection of Sweep Waste. To 27 the extent feasible the Roll-Off Containers shall be water-tight. All Sweep Waste left at 28 the dumpsite shall be collected and the area shall be swept by CONTRACTOR prior to 29 the end of the Work Day. CONTRACTOR shall use any measures necessary to ensure 30 that no runoff from the debris ends up in the storm water system in accordance with 31 BMP Guidelines for Non-Point Source Pollutants. Failure to use a dumpsite or failure to 32 properly maintain a dumpsite shall result in administrative charges as described in 33 Article 18.

Related to Dumpsites

  • Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for: (a) acquiring and providing Right of Way on the Site in accordance with the alignment finalised by the Authority, free from all encroachments and encumbrances, and free access thereto for the execution of this Agreement; and (b) obtaining licences and permits for environment clearance for the Project Highway.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Containers An extra charge will be made for returnable containers and special shipping devices (such as oil barrels, reels, tarpaulins, commutator clamps, etc.) where they are consigned to the Purchaser, but refund will be made if returned in good condition to the factory, or other points designated by EXION, within ninety (90) days from the date of original shipment, charges prepaid.