Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.
Alpine Areas As of 1 March 2024, the Employer shall pay an Alpine disability allowance of $4.45 for hours worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2025, rounded to the nearest 5 cents.
PUBLIC FACILITIES Supplier’s employees may be required to perform work at government- owned facilities, including schools. Supplier’s employees and agents must conduct themselves in a professional manner while on the premises, and in accordance with Participating Entity policies and procedures, and all applicable laws.
Elevation Elevation is defined as restoring an employee to the higher classification, with permanent status, which was held prior to being granted a demotion or to a class that is between the current class and the class from which the employee was demoted. Upon elevation, an employee’s salary will be determined in the same manner that is provided for promotion in Section 43.5, above.
Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to Covista.