Preconstruction Phase The Preconstruction Phase shall mean the period commencing on the date of this CM/GC Contract and ending upon commencement of the Construction Phase; provided that if the Owner and CM/GC agree, the Construction Phase may commence before the Preconstruction Phase is completed, in which case both phases shall proceed concurrently, subject to the terms and conditions of the Contract Documents.
Construction Period During the construction period, Redeveloper agrees to keep the construction area, including completed operations insured against loss or damage by fire, and such other risks, casualties, and hazards as are customarily covered by builders’ risk or extended coverage policies in an amount not less than the replacement value but allowing for reasonable coinsurance clauses and deductibles. In the event of any insured damage or destruction, Redeveloper agrees to use its good faith efforts to commence restoration of the Private Improvements to its prior condition within nine (9) months from the date of the damage or destruction, and shall diligently pursue the same to completion.
Preconstruction Services During the Design & Preconstruction Phase, the Design-Builder shall provide such design and preconstruction services as are necessary to properly advance the Project. Without limiting the generality of the foregoing, during the Preconstruction Phase, the Design-Builder shall: (i) work with its Architect and any design consultants to advance the design for the Project in consultation with Client Agency, the Department and its Program Manager; (ii) obtain bids from trade subcontractors to perform the work described in the Design Development Documents and provide bid tabulations to the Department; (iii) engage in any Value Engineering and scoping exercises necessary to return the cost of the work to the Project Budget; (iv) engage in preconstruction activities, including identifying any long-lead items; (v) develop a GMP proposal for the Project; and (vi) enter into a GMP for the Project. Throughout the Design & Preconstruction Phase, the Design-Builder shall schedule and attend regular meetings with the Department, the Program Manager and the Architect. A list of preconstruction deliverables is set forth in Exhibit C.
Construction Commencement The Connecting Transmission Owner shall commence construction of the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades for which it is responsible as soon as practicable after the following additional conditions are satisfied: 5.6.1 Approval of the appropriate Governmental Authority has been obtained for any facilities requiring regulatory approval; 5.6.2 Necessary real property rights and rights-of-way have been obtained, to the extent required for the construction of a discrete aspect of the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades; 5.6.3 The Connecting Transmission Owner has received written authorization to proceed with construction from the Developer by the date specified in Appendix B hereto; and 5.6.4 The Developer has provided security to the Connecting Transmission Owner in accordance with Article 11.5 by the dates specified in Appendix B hereto.
Reconstruction (a) Subject to the provisions of subparagraphs (b) and (c) below, in the event the Premises or any other portion of the Building is damaged by fire or other perils covered by extended coverage insurance, and such damage does not require structural demolition and reconstruction of all or part of the Building, Landlord agrees to forthwith repair such damage utilizing the proceeds of insurance and this Lease shall remain in full force and effect, except that Tenant shall be entitled to an equitable reduction of Minimum Rent from the date of damage until completion of such repairs, based on the extent to which the damage and making of such repairs shall reasonably interfere with the business carried on by Tenant in the Premises. (b) In the event that any casualty requires structural demolition and reconstruction of all or a material part of the Building (whether or not such reconstruction involves any portion of the Premises), Tenant may, at its election, give notice to Landlord at any time within sixty (60) days after such damage, terminating this Lease as of the date of the casualty. In the event of giving such notice, this Lease and all interest of Tenant in the Premises shall terminate on the date of the casualty, the Rent shall be paid up to the date of such casualty, and Landlord shall be entitled to all insurance maintained by Tenant on the Building (except for proceeds attributable to Tenant’s personal property in, on or about the Premises). In the alternative, and so long as at least five (5) years remain in the Term or Tenant then exercises an Option pursuant to Paragraph 3(b), if any Tenant may, by written notice to Landlord within such 60-day period, elect to require Landlord to repair or restore such damage, in which case the Minimum Rent shall be proportionately reduced as provided in subparagraph (a) above and this Lease shall continue in full force and effect; PROVIDED, HOWEVER, that Tenant shall have the right to alter the size and configuration of the Building in the course of such reconstruction, so long as the Building as reconstructed is an integrated architectural unit, the dimensions of the Premises are substantially the same as prior to such casualty and Tenant is able to operate its business as intended at the time of Lease execution, subject to Landlord’s approval which will not be unreasonably conditioned, delayed or denied. If Tenant elects to require Landlord to construct the improvements, Tenant will make available to Landlord all insurance proceeds received by Tenant or due to Tenant, and, prior to any reconstruction, Tenant will deposit with Landlord or its contractor the amount by which the cost of reconstruction exceeds the amount of the insurance proceeds.