During the Design Development Phase. the A/E shall, as necessary, prepare demolition drawings showing all existing construction to be removed as a part of the Project. The demolition drawings shall identify all existing building systems that will need to be demolished, capped, re-routed, or modified.
Appears in 4 contracts
Sources: Architectural and Engineering Services Agreement, Architectural and Engineering Services Agreement, Architectural and Engineering Services Agreement
During the Design Development Phase. the A/E shall, as necessary, prepare demolition drawings showing all existing construction to be removed as a part of the Project. The demolition drawings shall identify all existing building systems that will need to be demolished, capped, re-routed, routed or modified.
Appears in 1 contract