Field Trips Orange COUNTY funds may not be used to support any overnight and/or out of Central Florida travel, unless approved by the COUNTY’S Manager of the CCC or designee in advance. The AGENCY must have on file for field trip(s) that each participant, adult or minor, must have a signed release of liability form releasing the COUNTY from any liability. If the participant is a minor, the release must be signed by a parent/guardian. Central Florida is defined as Orange, Osceola, Seminole, Brevard, Lake, Polk, and Volusia Counties.
Multi-year Planning Targets Schedule A may reflect an allocation for the first Funding Year of this Agreement as well as planning targets for up to two additional years, consistent with the term of this Agreement. In such an event, the HSP acknowledges that if it is provided with planning targets, these targets: a. are targets only, b. are provided solely for the purposes of planning, c. are subject to confirmation, and d. may be changed at the discretion of the Funder in consultation with the HSP. The HSP will proactively manage the risks associated with multi-year planning and the potential changes to the planning targets; and the Funder agrees that it will communicate any changes to the planning targets as soon as reasonably possible.
Technical Objections to Grievances It is the intent of both parties to this agreement that no grievance shall be defeated merely because of a technical error other than time limitations in processing the grievance through the grievance procedure. To this end an arbitration board shall have the power to allow all necessary amendments to the grievance and the power to waive formal procedural irregularities in the processing of a grievance in order to determine the real matter in dispute and to render a decision according to equitable principles and the justice of the case.
Selection Planning Prior to the issuance to consultants of any requests for proposals, the proposed plan for the selection of consultants under the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Consultant Guidelines. Selection of all consultants’ services shall be undertaken in accordance with such selection plan as shall have been approved by the Association, and with the provisions of said paragraph 1.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.