Earthwork for Foundations Clause Samples

Earthwork for Foundations. Earthwork excavation for foundations and filling in foundations shall conform to TNBP 23 and 24. The area to be excavated or filled in with excavated materials shall be clearly demarcated in the field by the Contractor. Excavation shall be done to lines and levels defined. Excavation shall be carried out to such widths, lengths, depths, profiles and grades as shown in the drawing or as may be specified by the Engineer – in – charge. Rough Excavation may be carried out up to a depth 15 cm less than the final level but the balance shall be excavated to precise level with special care. All soft pockets of soil met with even below the final level shall be removed and the excavation filled up as directed by Engineer-in-charge. The methods of excavation shall in every case be subject to the approval of the Engineer-in-charge and the contractor shall ensure the safety and stability of the excavations, being executed by him as well adjacent buildings, structures, services and other works in the vicinity of the site of work. Wherever necessary Engineer-in-charge may direct that the sides of the excavation should be timbered and shored at the contractor’s own cost, adopting a proper method approved by the Engineer-in- charge. Notwithstanding the above, should any slip occur, the contractor shall remove all the slipped materials from the excavated pit, at his own cost. He shall also make good at his own all damages caused to the work as well as adjacent buildings, structures etc., as a result of the slip, referred to. All excavation work shall be subject to inspection and approved by the Engineer-in-charge before any further works in the excavated areas allowed to commence. Should any excavation be carried out beyond the specified depth, the contractor should fill it up at his own cost with the same type and class of material as it is proposed to be laid over the excavated portion. No payment will however be made to the contractor on his account. The contractor shall ensure that the excavations and the structures under construction are kept free from water logging at all stages of construction. He shall take all necessary precautions and `streams, acquifers, springs, surface flows etc., are excluded effectively so as to ensure that the works are carried out in a reasonable dry conditions in accordance with the construction schedule. Back filling around the foundations, trenches, plinth and under the floor shall be done in accordance with TNBP 24 and 25. The finished ...

Related to Earthwork for Foundations

  • The Contractor A general contractor shall be retained by Tenant to construct the Improvements. Such general contractor (“Contractor”) shall be selected by Tenant from a list of general contractors supplied by Landlord, and Tenant shall deliver to Landlord notice of its selection of the Contractor upon such selection.

  • EMPLOYEES OF THE CONTRACTOR All work under this contract shall be performed in a professional and skillful manner. The County may require, in writing, that the Contractor, remove from this contract any employee the County deems incompetent, careless, or otherwise objectionable.

  • Work for Hire All services provided under this contract are considered work for hire and as such all data, basic sketches, charts, calculations, plans, specifications, and other documents created or collected under the terms of this contract are the property of the State.

  • Contractor If COUNTY elects to renegotiate this Agreement due to reduced or terminated 20 funding, CONTRACTOR shall not be obligated to accept the renegotiated terms.

  • New Developments All ideas, inventions, discoveries, concepts, trade secrets, trademarks, service marks or other developments or improvements, whether patentable or not, conceived by Employee, alone or with others, at any time during the term of Employee’s employment, whether or not during working hours or on Employer’s premises, which are within the scope of or related to the business operations of Employer or its Affiliates (“New Developments”), shall be and remain the exclusive property of Employer. Employee agrees that any New Developments which, within one year after the cessation of employment with Employer, are made, disclosed, reduced to a tangible or written form or description or are reduced to practice by Employee and which are based upon, utilize or incorporate Information shall, as between Employee and Employer, be presumed to have been made during Employee’s employment by Employer. Employee further agrees that Employee will not, during the term of Employee’s employment with Employer, improperly use or disclose any proprietary information or trade secrets of any former employer or other person or entity and that Employee will not bring onto Employer premises any unpublished document or proprietary information belonging to any such employer, person or entity unless consented to in writing by such employer, person or entity. At all times during the term of this Agreement and thereafter, Employee shall do all things reasonably necessary to ensure ownership of such New Developments by Employer, including the execution of documents assigning and transferring to Employer all of Employee’s rights, title and interest in and to such New Developments and the execution of all documents required to enable Employer to file and obtain patents, trademarks, service marks and copyrights in the United States and foreign countries on any of such New Developments.