Common use of Electrical System Clause in Contracts

Electrical System. Landlord shall provide each floor of the Building with an electrical room, secondary electrical service feeders, distribution transformers/panel boards and lighting/service panel boards. A load capacity of not less than 6 Volt Amps (▇▇▇▇▇) per usable square foot shall be provided exclusively for Tenant’s lighting and power requirements and in addition to any base building requirements for heating and cooling equipment or core area accommodations. Additional load capacity shall be provided at an additional expense to Tenant. The voltage characteristics at distribution and lighting/service panel boards shall be three phase connected and not exceeding 480 volts. All lighting/service panel boards shall include ground bussing. Electrical distribution will be in accordance with final space plans. The main electrical room shall be equipped with panels and breakers to accommodate 1,200 amp main service to the Building at 480/277 volt, three phase. Pad mounted FPL transformer. Single FPL meter for the Building.

Appears in 3 contracts

Sources: Lease Agreement (Interval Leisure Group, Inc.), Lease Agreement (Interval Leisure Group, Inc.), Lease Agreement (Interval Leisure Group, Inc.)