Enclosure Buildout Clause Samples
The Enclosure Buildout clause defines the responsibilities and requirements for constructing or modifying a physical enclosure within a property or leased space. Typically, this clause outlines the scope of work, timelines, and standards for the buildout, specifying which party is responsible for design, permitting, and construction costs. Its core practical function is to ensure that both parties have a clear understanding of how and when the enclosure will be completed, thereby preventing disputes and delays related to the buildout process.
Enclosure Buildout. The Cage Enclosure Buildout element includes the material and labor to construct the enclosure. ACI may choose from USWC approved contractors to construct the cage, in accordance with USWC's installation Technical Publication 77350. It includes a nine foot cage enclosure available in increments of 100, 200, 300 or 400 square feet, air conditioning (to support ACI loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code). Pricing for the Enclosure Buildout will be provided on an individual basis due to the uniqueness of ACI's requirements, central office structure and arrangements.
Enclosure Buildout. The Cage Enclosure Buildout element includes the material and labor to construct the enclosure. NorthPoint may choose from USWC approved contractors to construct the cage, in accordance with USWC’s installation Technical Publication 77350. It includes a nine foot cage enclosure, air conditioning (to support NorthPoint loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code). Also provides for humidification, if required. Pricing for the Enclosure Buildout will be provided on an individual basis due to the uniqueness of NorthPoint’s requirements, central office structure and arrangements. At NorthPoint’s[Co- Provider’s] request USWC will provide retail services (e.g. POTS, ISDN, 56K circuit) to the collocation cage.
Enclosure Buildout. The Cage Enclosure Buildout element includes the material and labor to construct the enclosure. Teligent may choose from USWC approved contractors to construct the cage, in accordance with USWC’s installation Technical Publication 77350. It includes a nine foot cage enclosure, air conditioning (to support Teligent loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code). Also provides for humidification, if required. Pricing for the Enclosure Buildout will be provided on an individual basis due to the uniqueness of Teligent’s requirements, central office structure and arrangements.
Enclosure Buildout. Except for Common Collocation, the Cage Enclosure Buildout element includes the material and labor to construct the enclosure. NewPath may choose from USWC approved contractors to construct the cage, in accordance with USWC’s installation Technical Publication 77350. It includes a nine foot cage enclosure, air conditioning (to support NewPath loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code). Also provides for humidification, if required. Pricing for the Enclosure Buildout will be provided on an individual basis due to the uniqueness of NewPath’s requirements, central office structure and arrangements.
Enclosure Buildout. The Enclosure Buildout element, either cage or hardwall, includes the material and labor to construct the enclosure specified by Pac-West or Pac-West may choose from U S WEST-approved contractors to construct the cage, meeting U S WEST's installation Technical Publication 77350. It includes the enclosure (cage or hardwall), air conditioning (to support Pac-West loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or the number required by building code for the hardwall enclosure). It also provides for humidification, if required. Pricing for Enclosure Buildout will be provided on an individual case basis ("ICB") due to the uniqueness of Pac-West's requirements, central office structure and arrangements.
Enclosure Buildout. The Cage Enclosure Buildout element includes the material and labor to construct the enclosure. Pac-West may choose from USWC approved contractors to construct the cage, in accordance with USWC's installation Technical Publication 77350. It includes a nine foot cage enclosure, air conditioning (to support Pac-West loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code). Also provides for humidification, if required. Pricing for the Enclosure Buildout will be provided on an individual basis due to the uniqueness of Pac-West's requirements, central office structure and arrangements.
Enclosure Buildout. The Enclosure Buildout element, either Cage or, at the Pac-West's option, Hardwall, includes the material and labor to construct the enclosure specified by Pac-West or Pac-West may choose from USWC approved contractors to construct the cage, meeting USWC's installation Technical Publication 77350. It includes the enclosure (cage or hardwall), air conditioning (to support Pac-West loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code for the hardwall enclosure). Also provides for humidification, if required.
Enclosure Buildout. Except for Cageless Physical Collocation the Cage Enclosure Buildout element includes the material and labor to construct the enclosure. Integra may choose from USWC approved contractors to construct the cage, in accordance with USWC’s installation Technical Publication 77350. It includes a nine foot cage enclosure, air conditioning (to support Integra loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code). Also provides for humidification, if required. Pricing for the Enclosure Buildout will be provided on an individual basis due to the uniqueness of Integra’s requirements, Central Office structure and arrangements.
Enclosure Buildout. The Enclosure Buildout element, either Cage or, at Focal's option, Hardwall, includes the material and labor to construct the enclosure specified by Focal or Focal may choose from USWC approved contractors to construct the cage, meeting USWC's installation Technical Publication 77350. It includes the enclosure (cage or hardwall), air conditioning (to support Focal loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code for the hardwall enclosure). Also provides for humidification, if required.
Enclosure Buildout. The Enclosure Buildout element, either Cage or, at AT&T’s option, Hardwall, includes the material and labor to construct the enclosure specified by AT&T or AT&T may choose from USWC approved contractors to construct the cage, meeting USWC’s installation Technical Publication 77350. It includes the enclosure (cage or hardwall), air conditioning (to support AT&T loads specified), lighting (not to exceed 2 ▇▇▇▇▇ per square foot), and convenience outlets (3 per cage or number required by building code for the hardwall enclosure). Also provides for humidification, if required. Pricing for the Enclosure Buildout will be provided on an individual case basis.54 USWC may recover such costs from AT&T through up-front, non-recurring charges.55