Engineering Summary Report Sample Clauses

Engineering Summary Report. The Engineer shall prepare a report to summarize the design criteria, traffic analysis, preliminary cost estimate and basis of estimate, construction sequence description, and utility conflict issues.
Engineering Summary Report. The Engineer shall prepare a report to summarize the design criteria, traffic analysis, preliminary cost estimate and basis of estimate, construction sequence description, and utility conflict issues. Agency Coordination and Public Involvement‌ • The Engineer shall assist the State in conducting meetings with various agencies to discuss and review the schematic design. The Engineer shall document and respond to issues related to the schematic design. • The Engineer shall assist in conducting public meetings and public hearing during the project development process. The Engineer shall prepare schematic exhibits, constraints maps, other necessary exhibits, and assist the State in the presentation.‌ • The Engineer shall schedule, participate in mail out, and pay for meeting notices, and facilitate meetings with Affected Property Owners (MAPOs). • The Engineer shall prepare the adjacent property owner list, mail out and pay for notices for public meetings and hearing, draft letter to public officials, prepare, publish and pay for DocuSign Envelope ID: AAC8E920-9951-40B4-B77C-DDDA5AE10FF9 notices to major and local newspaper, reserve public meeting and hearing location, hire court reporter and law enforcement for public meetings and hearing, provide audio and visual rental equipment, and assist with conducting public meeting and hearing. The Engineer shall attend pre-meetings at the State’s District in preparation for every meeting and hearing, as directed by the State. • Compile public comments received and responses to comments during the MAPO, public meetings, or public hearing. Prepare a documentation of MAPO, public meetings, and public hearings, respectively, as required. The Engineer must comply with the Environmental Compliance Toolkits related to public involvement.
Engineering Summary Report. The Engineer shall prepare a report to summarize the design criteria, traffic analysis, preliminary cost estimate and basis of estimate, construction sequence description, and DocuSign Envelope ID: D78C9312-D95C-4FD3-B00A-7CFCC10A2DB4 utility conflict issues.
Engineering Summary Report. (Prior to 60% Submission)

Related to Engineering Summary Report

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Progress Report By March 1 of each year, ***** will submit a written annual report to Stanford covering the preceding calendar year. The report will include information sufficient to enable Stanford to satisfy reporting requirements of the U.S. Government and for Stanford to ascertain progress by ***** toward meeting this Agreement’s diligence requirements. Each report will describe, where relevant: *****’s progress toward commercialization of Licensed Product, including work completed, key scientific discoveries, summary of work-in-progress, current schedule of anticipated events or milestones, market plans for introduction of Licensed Product, and significant corporate transactions involving Licensed Product. ***** will specifically describe how each Licensed Product is related to each Licensed Patent.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peach, cotton, pistachio, potato, table tomatoes, industrial tomatoes, grapes, kiwi, walnut) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Management Report Promptly upon receipt thereof, copies of all detailed financial and management reports submitted to Borrower or any other Loan Party by independent auditors in connection with each annual or interim audit made by such auditors of the books of Borrower or any other Loan Party.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.