Engineering Supervision Clause Samples

The Engineering Supervision clause establishes the requirement for oversight and management of engineering activities within a project. Typically, this clause outlines the responsibilities of a supervising engineer or team, such as monitoring construction progress, ensuring compliance with technical specifications, and verifying the quality of materials and workmanship. By mandating professional supervision, the clause helps maintain project standards, reduces the risk of errors or defects, and ensures that the work meets contractual and regulatory requirements.
POPULAR SAMPLE Copied 1 times
Engineering Supervision. Contractor will provide and maintain competent and adequate engineering supervision at the construction site to ensure that the complete work conforms to the approved plans and specifications and will furnish progress reports and such other information as may be required by the City or state.
Engineering Supervision. ➢ The Engineering associated with all additions inside of NorthWestern Energy’s property will be done internally, or by a NorthWestern Energy Consultant, and reviewed and approved by a professional engineer licensed in the State of Montana.
Engineering Supervision a. The Developer will ensure necessary supervision is provided by the Consultant when construction is in progress. Supervision shall be at a level sufficient for the Consultant to verify all work is conducted in accordance with the plans and specifications and to carry out the following: i Inspection 1. All pipes and fittings shall be inspected in place prior to backfill; 2. Verification will be made that all material meets specifications and that work is completed using consistent methods; 3. Obtain invert elevations for all sanitary and storm (if applicable) laterals at the property line. ii Testing iii Reports 1. Soil and geotechnical testing shall be performed on the site if determined necessary by the Consultant or the City; 2. Streets, sidewalks and curbs shall be tested in accordance with the City of Summerside Development Standards; 3. All water, sanitary sewer and storm drainage systems shall be tested in accordance with the City of Summerside Development Standards; 1. A daily log shall be maintained indicating work completed by the Contractor, and tests and inspections conducted; 2. At completion of Construction, a letter from the consultant stating that the work has been completed in accordance with this agreement; 3. Reports shall be prepared on all test results. b. The Developer shall bear the cost of all inspections and testing required by the City in order to determine the acceptability of the work. Results of all tests shall be forwarded to the City as the tests are conducted and reports prepared.

Related to Engineering Supervision

  • SITE SUPERVISION 1.9.1 Contractor shall provide adequate supervision of his employees to ensure complete and satisfactory performance of all work in accordance with the terms of the contract. Contractor shall have a responsible supervisor on the job at all times when the work of the contract is being carried out. 1.9.2 Contractor's site supervisor shall be responsible for communication with the State's representatives and shall meet with the Project Manager at the site on a weekly basis to discuss project status, including any problems, ideas, or concerns related to the project work. 1.9.3 Contractor and its employees shall be subject to all applicable State and Federal statutes and regulations for the conduct of personnel. 1.9.4 The Contractor shall provide adequate supervision of his/her subcontractors and their employees at all times.

  • CONTRACTOR SUPERVISION Contractor shall provide competent supervision of personnel employed on the job Site, use of equipment, and quality of workmanship.

  • Engineering Support When requested by CLEC, CBT shall provide timely engineering support. CLEC shall pay CBT for the use of its engineering services at charges previously agreed to by CLEC.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Site Safety Supervisor 62.1 On every job site, where the Employer is the principal contractor it shall appoint a management representative responsible for safety (Site Safety Supervisor). The Employer will ensure the Site Safety Supervisor has the necessary authority to ensure that all safety laws, procedures or Codes of Practice are observed, and that the following Safety Agreement is applied. 62.2 The Employer when appointing the person appointed as the Site Safety Supervisor must ensure that person has and maintainsthe appropriate experience and knowledge of the safety requirements of the work being performed. Other duties may be assigned by the Employer to a Site Safety Supervisor, provided that such duties shall not prevent him/her from exercising their duties as a Site Safety Supervisor.