Common use of ENUMERATION OF CONTRACT DOCUMENTS Clause in Contracts

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Document Title Pages Document 022704W CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with the drawings listed below. They are provided for reference purposes only to assist with identifying underground utilities and irrigation system.

Appears in 2 contracts

Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Date of Project Manual: August 30, 2012 , titled: “▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇ ▇ Site Infrastructure” Document Title Pages Document 022704W CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 17 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 Request Notice on Reimbursement for Approval of Substitution 1 Sales and Use Taxes, with implementing forms 4 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 21 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages: 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with Number Title Date Leigh Farm Park-Site Improvements 100% CD Submittal Plans 3/14/12 9.1.6 The Addenda, if any, are as follows: Number Date Pages 9.1.7 Other documents, if any, forming part of the drawings listed below. They Contract Documents are provided for reference purposes only to assist with identifying underground utilities and irrigation system.as follows:

Appears in 2 contracts

Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Date of Project Manual: September 6, 2013 Document Title Pages Document 022704W CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements Claim Form for Additional Time on the Basis of Adverse Weather Conditions 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 ST-1 to ST-4 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form Subcontractor Monthly Record of Payment Report 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2Final Subcontractor Record of Payment Report 1 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with Refer to Exhibit B: List of Drawings, 2 pages 9.1.6 The Addenda, if any, are as follows: Number Date Pages 9.1.7 Other documents, if any, forming part of the drawings listed below. They Contract Documents are provided for reference purposes only to assist with identifying underground utilities and irrigation system.as follows: Exhibit A: List of Specifications, 4 pages Exhibit B: List of Drawings, 2 pages

Appears in 2 contracts

Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Date of Project Manual: April 2, 2013. Document Title Pages Document 022704W ▇▇▇▇▇▇ CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 17 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 ST-1 to ST-4 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form Subcontractor Monthly Record of Payment Report 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2Equal Business Opportunity Program Final Subcontracting Report 1 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages: 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with Number Title Date Refer to Exhibit A - "List of Specifications and Drawings" 8/23/13 9.1.6 The Addenda, if any, are as follows: Number Date Pages 9.1.7 Other documents, if any, forming part of the drawings listed below. They Contract Documents are provided for reference purposes only to assist with identifying underground utilities and irrigation system.as follows:

Appears in 2 contracts

Sources: Standard Form of Agreement Between Owner and Contractor, Standard Form of Agreement Between Owner and Contractor

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 7.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 7.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 EditionContractor – Stipulated Sum. 9.1.2 7.1.2 The General Conditions are the Home Depot U.S.A., Inc. General Conditions of the Contract for ConstructionContract, AIA Document A201April 11 2012, 1987 EditionRevision. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Document Title Pages Document 022704W CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 9.1.4 7.1.3 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages: 9.1.5 7.1.4 The Drawings are as follows, and are dated unless a different date is shown below: 7.1.5 The addenda, if any, are as follows: 7.1.6 Other documents, if any, forming part of the Contract Documents are as follows and are attached hereto: No work Exhibit A – Scope of Work Exhibit B – Unit Prices‌ Exhibit C – Construction Change Directive Exhibit D – Schedule of Values‌ Exhibit F – Project Schedule Exhibit G – Alternates Exhibit H – Allowances‌‌ This Agreement is associated with entered into as of the day and year first written above and is executed in at least three original copies of which one is to be delivered to Contractor, one to Architect, and the remainder to Owner. (Signature) (Date) (Date) (Signature) (Print/Type Name) (Print/Type Name) (Print/Type Title) (Print/Type Title) All drawings listed belowbelow are by WD Partners unless noted otherwise SET ISSUED FOR BID T1.01 TITLE SHEET 11/14/16 TS1.0 TOPOGRAPHIC SURVEY 11/14/16 D1.0 DEMOLITION PLAN 11/14/16 C1.0 GEOMETRIC LAYOUT 11/14/16 C1.1 CURBED ISLAND DETAILS 11/14/16 C2.0 GRADING AND STORM SYSTEM 11/14/16 C2.1 BUILDING OVEREXCATAION 11/14/16 C3.0 STORM SYSTEM DETAILS 11/14/16 C3.1 UTILITY DETAILS 11/14/16 C3.2 SEWER PROFILES 11/14/16 C4.1 EROSION CONTROL PLAN PHASE I 11/14/16 C4.2 EROSION CONTROL PLAN PHASE II 11/14/16 C4.3 EROSION CONTROL DETAILS 11/14/16 C5.0 UTILITY PLAN 11/14/16 C6.0 PAVING PLAN 11/14/16 C6.1 PAVING DETAILS 11/14/16 C7.0 OFF-SITE STREET IMPROVEMENTS 11/14/16 C7.1 OFF-SITE ▇▇▇▇▇▇▇ ROAD IMPROVEMENTS 11/14/16 C7.2 OFF-SITE DETAILS 11/14/16 L1.1 LANDSCAPE ORDINANCE PLAN 11/14/16 L1.2 PLANTING DETAILS 11/14/16 L2.1 IRRIGATION PLAN 11/14/16 L2.2 IRRIGATION DETAILS 11/14/16 S0.01 GENERAL NOTES 11/14/16 S1.11 FOUNDATION DETAILS 11/14/16 S1.12 GARDEN CENTER FOUNDATION PLAN 11/14/16 S1.21 ROOF FRAMING PLAN 11/14/16 S2.21 WALL PANEL ELEVATIONS 11/14/16 S2.22 WALL PANEL ELEVATIONS 11/14/16 S2.23 WALL PANEL ELEVATIONS 11/14/16 S4.11 ENLARGED FOUNDATION PLANS 11/14/16 S4.21 ENLARGED FRAMING PLANS 11/14/16 S5.11 FOUNDATION DETAILS 11/14/16 S5.12 FOUNDATION DETAILS 11/14/16 S5.13 FOUNDATION DETAILS 11/14/16 S5.14 FOUNDATION DETAILS AT GARDEN CENTER 11/14/16 S5.15 FOUNDATION DETAILS 11/14/16 S5.21 FRAMING DETAILS 11/14/16 S5.22 FRAMING DETAILS 11/14/16 S5.23 FRAMING DETAILS 11/14/16 S5.24 FRAMING DETAILS 11/14/16 S6.01 STRUCTURAL SCHEDULES 11/14/16 F1 FIXTURE PLAN (FOR REFERENCE ONLY) A1.01 DIMENSIONED AND NOTED PLAN 11/14/16 A1.02 ROOF PLAN 11/14/16 A1.03 GARDEN CENTER PLANS 11/14/16 A2.01 EXTERIOR ELEVATIONS 11/14/16 A2.02 EXTERIOR ELEVATIONS 11/14/16 A3.01 EXTERIOR WALL SECTIONS 11/14/16 A3.02 EXTERIOR WALL SECTIONS AT ENTRY AND EXIT 11/14/16 A3.03 WALL SECTIONS AT LUMBER CANOPY 11/14/16 A3.04 WALL SECTIONS AT GARDEN CENTER 11/14/16 A4.01 ENLARGED OFFICE PLANS 11/14/16 A4.02 ENLARGED REFLECTED CEILING PLAN 11/14/16 A4.03 OFFICE ELEVATIONS AND DETAILS 11/14/16 A4.04 RESTROOM PLAN AND ELEVATIONS 11/14/16 A4.05 LOADING DOCK PLAN AND DETAILS 11/14/16 A4.06 TRC PLAN, ELEVATIONS AND DETAILS 11/14/16 A4.07 ELECTRICAL ROOM PLAN AND DETAILS 11/14/16 A4.11 APPLIANCE PLAN AND DETAILS 11/14/16 A4.12 KITCHEN PLAN AND DETAILS 11/14/16 A4.21 PNEUMATIC TUBE LAYOUT 11/14/16 A5.01 WALL PARTITION SECTIONS 11/14/16 A5.02 WALL PARTITION SECTIONS 11/14/16 A5.03 WALL PARTITION SECTIONS 11/14/16 A5.11 ROOF DETAILS 11/14/16 A6.01 FINISH SCHEDULE - WINDOWS - BOLLARDS 11/14/16 A6.02 DOOR SCHEDULE 11/14/16 A6.03 DOOR DETAILS 11/14/16 A6.04 GARDEN CENTER GATE DETAILS 11/14/16 G1.0 GARDEN CENTER KEY PLAN 11/14/16 G2.0 GARDEN CENTER COLUMN & FRAMING PLAN 11/14/16 G2.1 GARDEN CENTER COLUMN & FRAMING PLAN 11/14/16 G3.0 GARDEN CENTER ELEVATIONS 11/14/16 G4.0 MISC. They are provided for reference purposes only DETAILS 11/14/16 G4.1 MISC. DETAILS 11/14/16 G5.0 GARDEN CENTER RAIN SHIELD FRAMING PLAN 11/14/16 G7.0 GARDEN CENTER FRAMING ELEVATIONS 11/14/16 P1.01 PLUMBING PLAN 11/14/16 P4.01 ENLARGED PLUMBING PLANS 11/14/16 P4.02 TRC PLUMBING PLAN AND DETAILS 11/14/16 P5.01 PLUMBING DETAILS 11/14/16 P6.01 PLUMBING SCHEDULES 11/14/16 M1.01 MECHANICAL PLAN 11/14/16 M4.01 ENLARGED MECHANICAL PLANS 11/14/16 M4.02 TRC MECHANICAL PLAN AND DETAILS 11/14/16 M5.01 MECHANICAL DETAILS 11/14/16 M6.01 MECHANICAL SCHEDULES 11/14/16 E1.01 ELECTRICAL SITE PLAN 11/14/16 E1.11 LIGHTING PLAN 11/14/16 E1.21 POWER PLAN 11/14/16 E1.22 GARDEN CENTER LIGHTING AND POWER PLANS 11/14/16 E1.31 ENERGY MANAGEMENT PLAN 11/14/16 E4.11 ENLARGED LIGHTING PLANS 11/14/16 E4.21 ENLARGED PAOWER AND DATA PLANS 11/14/16 E4.22 ENLARGED PAOWER AND DATA PLANS 11/14/16 E4.23 DATA AND VAULT ROOM PLAN AND DETAILS 11/14/16 E4.24 DOCK POWER PLAN AND DETAILS 11/14/16 E4.25 EAS PLANS AND ELEVATIONS 11/14/16 E4.26 TRC ELECTRICAL 11/14/16 E4.41 KITCHEN ELECTRICAL PLAN AND DETAILS 11/14/16 E4.42 FAN AND LIGHT DISPLAY PLAN AND DETAILS 11/14/16 E5.11 LIGHTING DETAILS 11/14/16 E5.21 POWER DETAILS 11/14/16 E5.22 REGISTER DETAILS 11/14/16 E5.23 REGISTER DETAILS 11/14/16 E5.31 ENERGY MANAGEMENT DETAILS 11/14/16 E5.41 IN-RACK DETAILS 11/14/16 E5.42 IN-RACK SCHEDULE 11/14/16 E6.01 ELECTRICAL SCHEDULES 11/14/16 E6.02 ONE-LINE DIAGRAM 11/14/16 E6.03 PANELBOARD SCHEDULES FRONT 11/14/16 E6.04 PANELBOARD SCHEDULES REAR 11/14/16 E6.05 CONTACTOR SCHEDULE 11/14/16 BA1.0 INTRUSION ALARM DEVICE LAYOUT 11/14/16 BA2.0 INTRUSION ALARM RISER DIAGRAM 11/14/16 BA3.0 INTRUSION ALARM DETAILS 11/14/16 BA4.0 INTRUSION ALARM DETAILS 11/14/16 FA1.0 FIRE ALARM INITIATING DEVICE LAYOUT 11/14/16 FA2.0 FIRE ALARM NOTIFICATION DEVICE LAYOUT 11/14/16 FA3.0 FIRE ALARM INITIATING RISER DIAGRAM 11/14/16 FA4.0 FIRE ALARM NOTIFICAITON RISER DIAGRAM 11/14/16 FA5.0 FIRE ALARM CALCULATIONS & NOTES 11/14/16 FA6.0 FIRE ALARM DETAILS 11/14/16 FP1.0 SITE FIRE SERVICE PIPING PLAN 11/14/16 FP2.0 FIRE PROTECTION PIPING PLAN SYSTEM #1 11/14/16 FP3.0 FIRE PROTECTION PIPING PLAN SYSTEM #2 & #3 11/14/16 FP4.0 FIRE PROTECTION PIPING PLANS RACK PLANS & DETAILS 11/14/16 FP5.0 FIRE PROTECTION PIPING DETAILS 11/14/16 FP6.0 FIRE PROTECTION RISER ROOM 11/14/16 00000 Cover 11/14/16 00001 Contract Date Clarification 11/14/16 00010 Table of Contents 11/14/16 00015 Project Directory 11/14/16 00100 Invitation to assist with identifying underground utilities Bid 11/14/16 00110 Project Dates (Hard Copy) 11/14/16 00200 Instructions to Bidders 05/14/08 00400 Bid Proposal Form 11/14/16 00500 Stipulated Sum Contract (HDSTIPSUM 01 27 14) 11/14/16 00700 General Conditions (HDGENCON 04-11-2012) 04/11/12 00900 Soils Report 12/23/05 00900A Geotech Preliminary Report 10/21/16 01000 Special Conditions 09/21/11 01001 Special Conditions: Letter to Contractor 12/23/05 01010 Furnished by Owner Items (FBO) 09/04/09 01010 FBO Form A: Contractor Information Form 06/22/05 01010 FBO Form B: Take-Off Confirmation Sheet 06/22/05 01010 FBO Form C: Confirmation Of Shipment 06/22/05 01010 FBO Form D: Request For Additional/Replacement FBO Materials 06/22/05 01010 FBO Form E: Returned Materials 06/22/05 01011 Special Purchase Program (SPP) 01/22/07 01012 Preferred Purchasing 02/09/12 01200 Project Meetings 02/09/07 01200 Project Meetings - Form A 09/17/03 01200 Project Meetings - Form B 09/17/03 01230 Alternates 03/16/09 01300 Submittals 02/28/14 01411 Testing and irrigation system.Inspection 04/16/14 01425 Roofing Testing and Inspection Service 09/01/01 01430 Surveying 09/01/01 01500 Temporary Construction Facilities 09/21/11 01630 Substitutions and Product Options 09/01/01 01700 Project Closeout 06/11/09 01730 Operations & Maintenance Data 09/01/01 01800 Abbreviations & Definitions 03/11/05 02000 Site Work – Division of Responsibility 11/14/16 02200 Earthwork 11/14/16 02282 Termite Control 11/14/16 02370 Erosion and Sedimentation Control 11/14/16 02513 Asphalt Concrete Paving 11/14/16 02520 Portland Cement Concrete Paving 11/14/16 02550 Site Utilities 11/14/16 02580 Pavement Markings 11/14/16 02721 Storm Drainage System 11/14/16 02810 Fine Grading, Temporary Grassing and Erosion Control 11/14/16 02920 Soil Preparation 11/14/16 02930 Lawn and Sod 11/14/16 02940 Landscape Planting 11/14/16 02950 Trees, Shrubs, Vines and Groundcover 11/14/16 02960 Landscape Irrigation 11/14/16 03131 Permanent Plastic Concrete Forming 08/03/12 03150 (FBO) Slab on Ground Accessories (PNA) 10/11/10 03300 Cast-in-Place Concrete 08/13/14 03300 Concrete Mix Design Submittal Form 08/13/14 03300 Pre-Concrete Construction Conference Agenda 08/13/14 03360 Special Concrete Floor Finishes 08/13/14 03390 Slab on Ground 08/13/14 03470 Tilt-Up Panels 08/13/14 03600 Non-Shrink Grout 08/13/14 05120 Structural Steel 12/23/05 05210 (FBO) Steel Joist Girders (Vulcraft) 03/16/09 05220 (FBO) Steel Joists (Vulcraft) 03/16/09 05300 (FBO) Steel Deck (Vulcraft) 03/16/09 05400 Cold Formed Metal Framing 10/19/09 05501 Metal Fabrications 10/19/09 05580 Sheet Metal Fabrications 04/06/07 06100 Rough Carpentry 10/19/09 06402 Interior Architectural Woodwork 10/19/09 07180 Water Repellent 09/11/07 07201 Building Insulation 08/13/14 07240 Exterior Insulation and Finish System 01/11/13 07406 Metal Roof and Wall Panels 10/21/05 07534 (FBO) Single Ply TPO Membrane Roofing 06/23/09 07600 Flashing and Sheet Metal 06/23/09 07620 (FBO) TPO Flashing and Sheet Metal 06/23/09 07701 (FBO) Roof Hatch 06/23/09 07720 (FBO) Manufactured Structural Roof Curbs 01/11/13 07840 Firestopping 10/19/09 07901 Joint Sealers/Fillers 08/13/14 08110 (FBO) Hollow Metal Doors and Frames (▇▇ ▇▇▇▇) 04/07/10 08331 (FBO) Overhead Coiling Doors (Cornell) 10/14/09 08412 Aluminum Entrances and Storefront 12/23/05 08425 (FBO) Automatic Sliding Doors (▇▇▇▇▇▇▇) 08/16/13 08460 (FBO) Contractor Doors (▇▇▇▇▇▇▇) 08/16/13 08620 Skylights 12/07/09 08625 Heat and Smoke Vents 12/07/09 08700 (FBO) Finish Hardware (▇▇ ▇▇▇▇) 04/07/10 08800 Glass and Glazing 01/11/13 09220 Portland Cement Plaster (Stucco) 09/01/01 09260 Gypsum Drywall 10/19/09 09300 Tile 02/09/12 09510 Acoustical Ceilings 10/19/09 09653 Vinyl Base 10/19/09 09659 Tactile Warning Surfacing 03/16/09 09790 Floor Striping 09/17/03 09860 Graffiti Resistant Coating 04/07/08 09900 (FBO) Painting (Behr) 07/19/13 09985 Fiberglass Reinforced Panels 02/09/12 10166 (SPP) Toilet Partitions 10/28/11 10350 Flagpoles 01/10/12 10606 Chain Link Fencing and Gates 08/13/14 10810 (SPP) Toilet Accessories 10/28/11 11020 (FBO) Safes (SDS) 03/28/13 11160 Loading Dock Equipment 06/23/04 13070 Bullet Resistant Protection 12/31/09 13125 (NIC) Portable and Movable Buildings 06/22/05 13128 (FBO) Garden Center Fabrications 12/31/09 13700 (FBO) Closed Circuit Television (CCTV) (Checkview) 02/28/14 13700 (FBO) Closed Circuit Television (CCTV) (Tyco) 02/28/14 13727 (FBO) Security Alarm System (Checkview) 02/28/14 13727 (FBO) Security Alarm System (Tyco) 02/28/14 13900 Fire Protection and Fire Pump 10/11/10 13905 (NIC) Fire Extinguishers 01/11/13 14580 (FBO) Pneumatic Tube System (▇▇▇▇▇) 03/16/09 15010 Mechanical General Requirements 01/15/10 15050 Basic Material and Methods 04/23/02 15140 Supports and Anchors 09/11/07 15250 HVAC Insulation 09/11/07 15400 Plumbing 09/11/07 15410 (SPP) Plumbing Fixtures 10/28/11 15430 Above Ground Irrigation System 01/11/13 15450 Rainwater Harvesting System 08/13/15 15610 (FBO) Unit Heater (Lennox) 05/30/14 15625 (FBO) Low Intensity Radiant Heaters (▇▇▇▇▇▇-▇▇▇▇▇▇) 11/07/13 15730 (FBO) Rooftop Units (▇▇▇▇▇▇) 08/13/14 15850 (FBO) Fans (▇▇▇▇▇▇-▇▇▇▇▇▇▇▇▇) 11/07/13 15880 Air Distribution 09/11/07 15952 (FBO) Controls (Novar) 08/13/14 15960 (FBO) Energy Management Controls and Commissioning 08/13/14 15990 Test, Adjust, and Balance 01/15/10 16010 General Provisions 09/01/01 16015 Definitions 09/01/01 16020 Work Included 09/01/01 16025 Work Not Included 09/01/01 16030 Tests 09/01/01 16040 Identification 01/15/10 16100 Basic Materials and Methods 06/20/03 16101 Substitution Request Form 09/01/01 16110 Raceways 10/19/09 16111 (FBO) Track Busway 04/24/09 16120 Wire and Cables 10/19/09 16121 (FBO) Flexible Wiring System (Lithonia) 10/16/14 16125 Low-Voltage Wiring 01/29/10 16130 Outlet Boxes and Junction Boxes 10/19/09 16140 Switches and Receptacles 04/01/14 16150 Motors 09/01/01 16235 (FBO) UPS System (APC) 07/16/10 16289 TVSS System 07/16/10 16400 (FBO) Service and Distribution (CPI) 01/15/10 16410 Electrical Service 06/23/04 16415 Primary Service 09/11/07 16450 Grounding 09/11/07 16500 (FBO) Lighting (Lithonia) 10/16/14 16620 (FBO) Emergency Electrical Generating System (▇▇▇▇▇-▇▇▇▇▇▇) 08/19/11 16625 (FBO) Automatic Load Transfer (▇▇▇▇▇-▇▇▇▇▇▇) 08/19/11 16700 Communication System (Telephone) 07/16/10 16710 (FBO) Information Transport System 07/16/10 16715 (FBO) Television Equipment 02/14/08 16720 (FBO Fire Alarm System (Checkview) 02/28/14 16720 (FBO Fire Alarm System (Tyco) 02/28/14 16720 (FBO) Fire Protection Supervisory System 04/24/09 16856 Electric Heating Cables 09/11/07

Appears in 1 contract

Sources: Construction Contract

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Date of Project Manual: Issued for Bidding: September 21, 2012 Document Title Pages Document 022704W ▇▇▇▇▇▇ CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 17 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 ST-1 to ST-4 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Subcontractor Monthly Record of Payment Report 1 Equal Business Opportunity Program Final Subcontracting Report 1 E52-32-12- NCDOT Encroachment Contract Change Order Form 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2for water and sewer 15 197 E52-32-12- NCDOT Encroachment Contract for Sidewalk 14 193 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages: 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with Number Title Date Refer to Exhibit A - "Table of Contents" 9/20/12 9.1.6 The Addenda, if any, are as follows: Number Date Pages 9.1.7 Other documents, if any, forming part of the drawings listed below. They Contract Documents are provided for reference purposes only to assist with identifying underground utilities and irrigation system.as follows:

Appears in 1 contract

Sources: Standard Form of Agreement Between Owner and Contractor

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Date of Project Manual: January 10, 2014. Document Title Pages Document 022704W ▇▇▇▇▇▇ CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 17 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 ST-1 to ST-4 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form Subcontractor Monthly Record of Payment Report 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2Equal Business Opportunity Program Final Subcontracting Report 1 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages: 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with Number Title Date Refer to Exhibit A - "List of Specifications and Drawings" 9.1.6 The Addenda, if any, are as follows: Number Date Pages 9.1.7 Other documents, if any, forming part of the drawings listed below. They Contract Documents are provided for reference purposes only to assist with identifying underground utilities and irrigation system.as follows:

Appears in 1 contract

Sources: Standard Form of Agreement Between Owner and Contractor

ENUMERATION OF CONTRACT DOCUMENTS. 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual, dated and are as follows: Document Title Pages Document 022704W CITY OF DURHAM SUPPLEMENTARY CONDITIONS TO AIA 201 (1987 EDITION) FOR USE WHEN AN ARCHITECT IS NOT TO ADMINISTER THE PROJECT 19 Insurance Requirements 2 Request for Approval of Substitution 1 City of Durham Subcontractor Monthly Record of Payment Report 1 City of Durham Equal Business Opportunity Program Final Subcontracting Report 1 Notice on Reimbursement for Sales and Use Taxes, with implementing forms 4 Contract Change Order Form 1 Claim Form For Additional Time On The Basis Of Adverse Weather Conditions 2 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: Section Title Pages 9.1.5 The Drawings are as follows, and are dated unless a different date is shown below: No work is associated with the drawings listed below. They are provided for reference purposes only to assist with identifying underground utilities and irrigation system.. Number Title Date No drawings 9.1.6 The Addenda, if any, are as follows: 9.1.7 Other documents, if any, forming part of the Contract Documents are as follows: