EQUIPMENT TESTING. Each Party may request, pursuant to Good Utility Practice, that the other Party test, calibrate, verify or validate its telemetering, data acquisition, protective relay, control equipment or systems or other equipment or software pursuant to Good Utility Practice (which currently requires such action on an annual basis) or for the purpose of troubleshooting problems on interconnected facilities, consistent with the other Party's obligation to Maintain its equipment and facilities. Each Party shall be responsible for all costs to test, calibrate, verify or validate its equipment or software at intervals required by NEPOOL, NERC or NPCC. The requesting Party shall be responsible for all costs of the other Party associated with more frequent requests. Each Party shall supply the Party requesting the test, at no cost to such Party, with copies of the resulting inspection reports, installation and maintenance documents, test and calibration records, verifications and validations of the telemetering, data acquisition, protective relay, or other equipment or software connected to the Transmission System or Distribution System.
Appears in 2 contracts
Sources: Interconnection Agreement (Northeast Generation Co), Interconnection Agreement (Northeast Generation Co)
EQUIPMENT TESTING. Each Party may request, pursuant to Good Utility Practice, that the other Party test, calibrate, verify or validate its telemetering, data acquisition, protective relay, control equipment or systems or other equipment or software pursuant to Good Utility Practice (which currently requires such action on an annual basis) or for the purpose of troubleshooting problems on interconnected facilities, consistent with the other Party's obligation to Maintain its equipment and facilities. Each Party shall be responsible for all costs to test, calibrate, verify or validate its equipment or software at intervals required by NEPOOL, NERC or NPCC. The requesting Party shall be responsible for all costs of the other Party associated with more frequent requests. Each Party shall supply the other Party requesting the test, at no cost to such Party, with copies of the resulting inspection reports, installation and maintenance documents, test and calibration records, verifications and validations of the telemetering, data acquisition, protective relay, or other equipment or software connected to the Transmission System or Distribution System.
Appears in 1 contract