Common use of Erosion and Sediment Control Clause in Contracts

Erosion and Sediment Control. MORE THAN 2,500SQM (a) The SWMP must identify and respond to all items for Erosion and Sediment Control Plans listed in the condition above, as well as: (i) existing site contours; (ii) location and diagrammatic representation of all necessary erosion and sediment control systems or structures used to mitigate or prevent pollution to stormwater; (iii) location and engineering details with supporting design calculations for all necessary sediment basins, constructed wetlands, gross pollutant traps, trash racks or biofiltration ▇▇▇▇▇▇ (as relevant).

Appears in 2 contracts

Sources: Deferred Commencement Conditions, Deferred Commencement Conditions

Erosion and Sediment Control. MORE THAN 2,500SQM (a) The SWMP must identify and respond to all items for Erosion and Sediment Control Plans listed in the condition above, as well as: (i) existing site contours; (ii) location and diagrammatic representation of all necessary erosion and sediment control systems or structures used to mitigate or prevent pollution to stormwater; (iii) location Location and engineering details with supporting design calculations for all necessary sediment basins, constructed wetlands, gross pollutant traps, trash racks or biofiltration ▇▇▇▇▇▇ (as relevant).

Appears in 2 contracts

Sources: Voluntary Planning Agreement, Deferred Commencement Conditions