Evaluation Work Program Clause Samples

Evaluation Work Program. 5.2.1 If the Contractor considers that the Discovery merits Evaluation it will diligently submit to the Ministry a detailed evaluation work program and corresponding budget no later than six
Evaluation Work Program. 5.2.1 If the Contractor considers that the Discovery merits Evaluation it will diligently submit to the Ministry a detailed evaluation work program and corresponding budget no later than six (6) months following the date on which the Discovery was reported in accordance with Article 5.1 The evaluation work program, corresponding budget and designated Evaluation Area are subject to the review and approval of the Ministry in accordance with the procedures established in Article 4. 5.2.2 The rough draft of the evaluation work program will specify the estimated size of the Hydrocarbon reserves of the Discovery, the area to be designated as the Evaluation Area and will include all seismic, drilling, testing and evaluation operations necessary to carry out an appropriate evaluation of the Discovery. The Contractor will diligently undertake the approved evaluation work program, it being understood that the provisions of Article 4.4 will apply to the program. 5.2.3 The duration of the evaluation work program will not exceed twenty-four (24) months for Crude Oil and in the case of Natural Gas, the duration of the evaluation work program will be determined in accordance with the provisions of Article 13, unless otherwise approved by the Ministry. The Ministry's approval of the request will not be denied or delayed without reasonable justification.

Related to Evaluation Work Program

  • Work Progress The Developer and Connecting Transmission Owner will keep each other, and NYISO, advised periodically as to the progress of their respective design, procurement and construction efforts. Any Party may, at any time, request a progress report from the Developer or Connecting Transmission Owner. If, at any time, the Developer determines that the completion of the Connecting Transmission Owner’s Attachment Facilities will not be required until after the specified In-Service Date, the Developer will provide written notice to the Connecting Transmission Owner and NYISO of such later date upon which the completion of the Connecting Transmission Owner’s Attachment Facilities will be required.

  • Modified Work Program The Employer shall provide modified work for any employee injured on the job as per the requirements of the Workers’ Safety and Insurance Board. The employee must co-operate in developing and participating in, a modified work program suited to his capabilities, and with the approval of his physician and/or the WSIB. Both the Employer and the employee shall work together to return the employee to good health and his regular duties.

  • PROJECT WORK PLAN The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from DFPS and the Grantee.

  • Log Reviews All systems processing and/or storing PHI COUNTY discloses to 11 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 12 must have a routine procedure in place to review system logs for unauthorized access.

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones) B. Estimated total development time